Home > NRC Library > ADAMS Public Documents
Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 7
Accession Number: ML22244A196
Date Released: Friday, September 16, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML22245A042 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics - Redacted (617 page(s), 5/5/2022)
- ML22245A053 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Section 2.1, Figures - REDACTED (38 page(s), 5/5/2022)
- ML22245A061 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - REDACTED (275 page(s), 5/5/2022)
- ML22245A059 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 2_Redacted (23 page(s), 5/5/2022)
- ML22245A100 - Seabrook Station - Revision 19 to Evaluation and Comparison to BTP APCSB 9.5-1, Appendix A - Redacted (583 page(s), 5/5/2022)
- ML22245A002 - Seabrook Station, Unit No. 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 2.4, Figures REDACTED (33 page(s), 5/5/2022)
- ML22250A696 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 1 Redacted (50 page(s), 5/5/2022)
- ML22131A135 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 7 (18 page(s), 5/5/2022)
- ML22131A093 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, List of Effective Pages and Introduction and General Description of Plant (287 page(s), 5/5/2022)
- ML22131A108 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2.3, Figures (12 page(s), 5/5/2022)
- ML22131A101 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Appendix A, Onsite Meteorological Data Summaries, November 1971-March 1973 (101 page(s), 5/5/2022)
- ML22131A123 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Appendix B, Onsite Meteorological Data Summaries, April 1979-March 1980 (41 page(s), 5/5/2022)
- ML22131A109 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Appendix C, Geologic Investigations Of The Scotland Road Fault (Clinton- Newbury Fault), Newbury, Massachusetts, And Portsmouth Fault Investigations (145 page(s), 5/5/2022)
- ML22131A121 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Appendix D, Geologic Bedrock Logs Of Boring In The Site Area (116 page(s), 5/5/2022)
- ML22131A103 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Appendix E, Historical Earthquakes In The Site Vicinity (135 page(s), 5/5/2022)
- ML22131A098 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Appendix F, Geotechnical Report - Reactor Borings, July 1974 (82 page(s), 5/5/2022)
- ML22131A102 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Appendix G - I (102 page(s), 5/5/2022)
- ML22131A111 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Appendix J - K (66 page(s), 5/5/2022)
- ML22131A088 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Appendix L - R (238 page(s), 5/5/2022)
- ML22131A117 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems (768 page(s), 5/5/2022)
- ML22131A097 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1 (54 page(s), 5/5/2022)
- ML22131A090 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 2 (53 page(s), 5/5/2022)
- ML22131A131 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3 (51 page(s), 5/5/2022)
- ML22131A126 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Appendix A - C (30 page(s), 5/5/2022)
- ML22131A124 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Appendix D - F (37 page(s), 5/5/2022)
- ML22131A100 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Container Liner Anchor Load Tests, Part 1 (29 page(s), 5/5/2022)
- ML22131A130 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Part 2 and Appendix H (33 page(s), 5/5/2022)
- ML22131A089 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Appendix I, Report of Analysis of High Energy Line Breaks Outside Containment (77 page(s), 5/5/2022)
- ML22131A120 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 4, Reactor (231 page(s), 5/5/2022)
- ML22131A106 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (222 page(s), 5/5/2022)
- ML22131A129 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (504 page(s), 5/5/2022)
- ML22131A091 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (318 page(s), 5/5/2022)
- ML22131A095 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (675 page(s), 5/5/2022)
- ML22131A096 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (149 page(s), 5/5/2022)
- ML22131A125 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (197 page(s), 5/5/2022)
- ML22131A099 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (209 page(s), 5/5/2022)
- ML22131A116 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (37 page(s), 5/5/2022)
- ML22131A107 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (153 page(s), 5/5/2022)
- ML22131A092 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (497 page(s), 5/5/2022)
- ML22131A122 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance (70 page(s), 5/5/2022)
- ML22131A094 - Seabrook Station - Revision 21 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs (62 page(s), 5/5/2022)
- ML22131A127 - Seabrook Station - Revision 18 to Fire Protection of Safe Shutdown Capability (Appendix R) (755 page(s), 5/5/2022)
- ML22131A105 - Seabrook Station - Revision 165 to Technical Requirements Manual (220 page(s), 5/5/2022)