Peach Bottom Atomic Power Station, Units 2 and 3, Submittal of the Updated Final Safety Analysis Report (Revision 28}, Fire Protection Program (Revision 23), and Reference Drawings
Accession Number: ML21110A638
Date Released: Monday, March 13, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21110A639 - Peach Bottom Atomic Power Station, Units 2 and 3, Submittal of the Updated Final Safety Analysis Report (Revision 28}, Fire Protection Program (Revision 23), and Reference Drawings (24 page(s), 4/8/2021)
- ML21109A079 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Cover Page and General Table of Contents. (9 page(s), 4/8/2021)
- ML21109A087 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary, Table of Contents (7 page(s), 4/8/2021)
- ML21109A106 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 1, Sections 1 through 15 (131 page(s), 4/8/2021)
- ML21109A069 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2.1 through 1.6.3 (11 page(s), 4/8/2021)
- ML21109A032 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Site, Table of Contents (18 page(s), 4/8/2021)
- ML21109A062 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Reactor, Table of Contents (7 page(s), 4/8/2021)
- ML21109A067 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Sections 1 through 8 (117 page(s), 4/8/2021)
- ML21109A110 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.3-1 through 3.8-5 (35 page(s), 4/8/2021)
- ML21109A047 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System, Table of Contents (6 page(s), 4/8/2021)
- ML21109A036 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Containment, Table of Contents (5 page(s), 4/8/2021)
- ML21109A107 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Sections 1 thru 3 (131 page(s), 4/8/2021)
- ML21109A038 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 6, Core Standby Cooling Systems, Table of Contents (5 page(s), 4/8/2021)
- ML21109A101 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 6, Figures 6.3.1 through 6.7.20 (35 page(s), 4/8/2021)
- ML21109A092 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 7, Control And Instrumentation, Table of Contents (22 page(s), 4/8/2021)
- ML21109A100 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems, Table of Contents (6 page(s), 4/8/2021)
- ML21109A051 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 9, Sections 1 through 4 (65 page(s), 4/8/2021)
- ML21109A078 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 10, Auxiliary Systems, Table of Contents (8 page(s), 4/8/2021)
- ML21109A081 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 11, Power Conversion Systems, Table of Contents (4 page(s), 4/8/2021)
- ML21109A020 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 11, Sections 1 through 8 (28 page(s), 4/8/2021)
- ML21109A059 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 11, Figures 11.2-1 through 11.8-3 (5 page(s), 4/8/2021)
- ML21109A112 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Table of Contents (6 page(s), 4/8/2021)
- ML21109A103 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 13, Sections 1 through 8 (86 page(s), 4/8/2021)
- ML21109A074 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 13, Figures 13.2.1 through 13.5.2 (5 page(s), 4/8/2021)
- ML21109A042 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Table of Contents (12 page(s), 4/8/2021)
- ML21109A028 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.4-1 through 14.10-14 (53 page(s), 4/8/2021)
- ML21109A056 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix B, Technical Specifications. (1 page(s), 4/8/2021)
- ML21109A089 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix D, Quality Assurance Program, Table of Contents. (1 page(s), 4/8/2021)
- ML21109A095 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix D, Quality Assurance During the Operations Phase (2 page(s), 4/8/2021)
- ML21109A040 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix D, Figures D.7.1 through D.10.1 (3 page(s), 4/8/2021)
- ML21109A097 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix E, Station Atmospheric Release Limit Calculations, Table of Contents (4 page(s), 4/8/2021)
- ML21109A030 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix E, Figures E.1.1 through E.2.5 (11 page(s), 4/8/2021)
- ML21109A023 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix F, Interaction of Units 2 and 3, Table of Contents (1 page(s), 4/8/2021)
- ML21109A077 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix F, Interaction of Units 2 And 3. (8 page(s), 4/8/2021)
- ML21109A045 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix G, Plant Nuclear Safety Operational Analysis, Table of Contents (5 page(s), 4/8/2021)
- ML21109A071 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix G, Plant Nuclear Safety Operational Analysis (54 page(s), 4/8/2021)
- ML21109A096 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix H, Table of Contents (5 page(s), 4/8/2021)
- ML21109A046 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria (80 page(s), 4/8/2021)
- ML21109A053 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix I, In-Service Inspection Program Units 2 and 3 and Common Plant, Table of Contents (3 page(s), 4/8/2021)
- ML21109A022 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix I, Inservice Inspection and Testing Programs (1 page(s), 4/8/2021)
- ML21109A108 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns, Table of Contents (5 page(s), 4/8/2021)
- ML21109A090 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix K, Reactor Pressure Vessel Design Summary Report, Table of Contents (2 page(s), 4/8/2021)
- ML21109A064 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix K, Exhibit I, Reactor Pressure Vessel Purchase Specification 21A1111 (48 page(s), 4/8/2021)
- ML21109A055 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix K, Exhibit II, Manufacture's Data Report and Vessel Certification (25 page(s), 4/8/2021)
- ML21109A098 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix K, Exhibit III, Summary Stress Report. (81 page(s), 4/8/2021)
- ML21109A068 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix K, Exhibit IV, Vessel Fabrication And Assembly. (5 page(s), 4/8/2021)
- ML21109A017 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix K, Exhibit V, Seismic Analysis of Reactor Vessel. (7 page(s), 4/8/2021)
- ML21109A072 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix K, Exhibit VI.B, Deleted. (1 page(s), 4/8/2021)
- ML21109A037 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix K, Exhibit VII, Reactor Vessel Material Surveillance Program. (5 page(s), 4/8/2021)
- ML21109A066 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix L, Fuel And Core Thermal-Hydraulic Design (1 page(s), 4/8/2021)
- ML21109A052 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix M, Containment Report, Table of Contents. (4 page(s), 4/8/2021)
- ML21109A035 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix N, Peach Bottom Site Meteorology, Table of Contents (2 page(s), 4/8/2021)
- ML21109A109 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix N, Peach Bottom Site Meteorology (2 page(s), 4/8/2021)
- ML21109A029 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix N, Table N.2.1. (142 page(s), 4/8/2021)
- ML21109A111 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix O, Emergency Plan and Security Plan, Table of Contents (1 page(s), 4/8/2021)
- ML21109A025 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix O, Emergency Plan and Security Plan (2 page(s), 4/8/2021)
- ML21109A082 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix P, Environmental Technical Specifications. (1 page(s), 4/8/2021)
- ML21109A065 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix Q, License Renewal Aging Management UFSAR Supplement, Table of Contents (5 page(s), 4/8/2021)
- ML21109A026 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix Q, License Renewal UFSAR Suplement. (41 page(s), 4/8/2021)
- ML21109A091 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix Q, Figure Q.5.1, Revision 24, Clamps installed on the Replacement Core spray sparger pipes structurally replacing welds at each of the four... (1 page(s), 4/8/2021)
- ML21109A076 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix R, Table of Contents, Pages R-i to R-iv (4 page(s), 4/8/2021)
- ML21109A058 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix R, Commitment List Pages R-90 to R-124. (35 page(s), 4/8/2021)
- ML23062A179 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 7, Figures 7.1.-1 through 7.20.1 (Redacted) (3/3/2023)
- ML23062A211 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix A, Pressure Integrity of Piping and Equipment Pressure Parts, Table of Contents (Redacted) (3/31/2023)
- ML23062A212 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.2-1A through 9.4-1 (Redacted) (3/3/2023)
- ML23062A213 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix R, Second License Renewal UFSAR Supplement, Pages R-1 to R-89 (4-22-20) (Redacted) (3/3/2023)
- ML23062A214 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix C, Figures C.2.1 through C.3.12L (Redacted) (3/3/2023)
- ML23062A215 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria, Table of Contents. (Redacted) (3/3/2023)
- ML23062A216 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 12, Sections 1 through 4 (Redacted) (3/3/2023)
- ML23062A217 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 14, Sections 1 through 10. (Redacted) (3/3/2023)
- ML23062A218 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.2.1 through 5.3-3 (Redacted) (3/3/2023)
- ML23062A219 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 4, Sections 1 through 11 (Redacted) (3/3/2023)
- ML23062A220 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 through 23 (Redacted) (3/3/2023)
- ML23062A221 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 6, Sections 1 through 7 (Redacted) (3/3/2023)
- ML23062A417 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution Of AEC-ACRS And Staff Concerns (Redacted) (3/3/2023)
- ML23062A418 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 10, Figures 10.3-1 through 10.24-4 (Redacted) (3/3/2023)
- ML23062A419 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria. (Redacted) (3/3/2023)
- ML23062A420 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 10, Sections 1 thru 24 (Redacted) (3/3/2023)
- ML23062A421 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix E, Station Atmospheric Release Limit Calculations (Redacted) (3/3/2023)
- ML23062A422 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix J, Figures J.4.1 through J.4.8 (Redacted) (3/3/2023)
- ML23062A423 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix A, Figures A.2.1 through A.10.17 (Redacted) (3/3/2023)
- ML23062A424 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 12, Structures and Shielding, Table of Contents (3/3/2023)
- ML23062A425 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 9, Radioactive Waste Systems, Table of Contents (Redacted) (3/3/2023)
- ML23062A426 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 8, Sections 1 through 8 (Redacted) (3/3/2023)
- ML23062A427 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 7, Sections 1 through 9 (Redacted) (3/3/2023)
- ML23062A428 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix M, Containment Report (Redacted) (3/3/2023)
- ML23062A429 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Appendix A, Pressure Integrity of Piping and Equipment Pressure Parts (Redacted) (3/3/2023)
- ML23062A430 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Sections 1 through 9. (Redacted) (3/3/2023)
- ML23062A431 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 8, Figures 8.2-1 through 8.8-1 (Redacted) (3/3/2023)
- ML23062A432 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 28 to Updated Final Safety Analysis Report, Chapter 12, Figures 12.1-1 through 12.3-12 (Redacted) (3/3/2023)