Seabrook Station, Unit No. 1, Revision 20 to Updated Final Safety Analysis Report
Accession Number: ML21088A388
Date Released: Monday, April 19, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20323A141 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report (20 page(s), 10/22/2020)
- ML20323A123 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (287 page(s), 10/22/2020)
- ML20323A137 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.3, Figures (12 page(s), 10/22/2020)
- ML20323A139 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A (101 page(s), 10/22/2020)
- ML20323A145 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B (41 page(s), 10/22/2020)
- ML20323A142 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2C (145 page(s), 10/22/2020)
- ML20323A144 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2D (116 page(s), 10/22/2020)
- ML20323A140 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2E (135 page(s), 10/22/2020)
- ML20323A148 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2F (82 page(s), 10/22/2020)
- ML20323A149 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2G through Appendix 2I (102 page(s), 10/22/2020)
- ML20323A151 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2J through Appendix 2K (66 page(s), 10/22/2020)
- ML20323A146 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2L through Appendix 2R (238 page(s), 10/22/2020)
- ML20323A152 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems (768 page(s), 10/22/2020)
- ML20323A147 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1 (54 page(s), 10/22/2020)
- ML20323A156 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 2 (53 page(s), 10/22/2020)
- ML20323A161 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3 (51 page(s), 10/22/2020)
- ML20323A159 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A through Appendix 3C (33 page(s), 10/22/2020)
- ML20323A158 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3D through Appendix 3F (37 page(s), 10/22/2020)
- ML20323A157 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Part 1 (29 page(s), 10/22/2020)
- ML20323A160 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Part 2, and Appendix 3H (33 page(s), 10/22/2020)
- ML20323A155 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3I (77 page(s), 10/22/2020)
- ML20323A120 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 4, Reactor (231 page(s), 10/22/2020)
- ML20323A119 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (222 page(s), 10/22/2020)
- ML20323A121 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (504 page(s), 10/22/2020)
- ML20323A118 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (318 page(s), 10/22/2020)
- ML20323A125 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (675 page(s), 10/22/2020)
- ML20323A126 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (149 page(s), 10/22/2020)
- ML20323A134 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (197 page(s), 10/22/2020)
- ML20323A127 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (209 page(s), 10/22/2020)
- ML20323A130 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (37 page(s), 10/22/2020)
- ML20323A128 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (153 page(s), 10/22/2020)
- ML20323A122 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (497 page(s), 10/22/2020)
- ML20323A133 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance (70 page(s), 10/22/2020)
- ML20323A124 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs (60 page(s), 10/22/2020)
- ML20323A170 - Seabrook Station Rev. 17 to Fire Protection Safe Shutdown Capability (757 page(s), 10/22/2020)
- ML20323A171 - Seabrook Station Rev. 162 to the Technical Requirements Manual (213 page(s), 10/22/2020)
- ML21089A073 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.2, Figures REDACTED (15 page(s), 3/30/2021)
- ML21089A082 - Seabrook Station, Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Figures - Redacted (33 page(s), 10/22/2020)
- ML21089A366 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Figures, Redacted (23 page(s), 10/22/2020)
- ML21089A391 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures - Redacted (38 page(s), 10/22/2020)
- ML21089A394 - Seabrook Station Rev. 20 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted (275 page(s), 10/22/2020)
- ML21090A147 - Seabrook Station - Evaluation and Comparison to BTP APCSB 9.5-1, Appendix A, Revision 18 (Redacted) (583 page(s), 10/22/2020)
- ML21090A183 - Seabrook Station Updated Final Safety Analysis Report - Chapter 2.5 Figures Part 1 (Redacted) (50 page(s), 10/22/2020)
- ML21090A213 - Seabrook Station - 002 Chapter 2 Sections and Tables (Redacted) (616 page(s), 10/22/2020)