Diablo Canyon Power Plant, Units 1 & 2, Submittal of Rev. 25 to Updated Final Safety Analysis Report.
Accession Number: ML20268B299
Date Released: Friday, November 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20268A351 - Diablo Canyon Power Plant, Units 1 & 2, Submittal of Rev. 25 to Updated Final Safety Analysis Report. (14 page(s), 9/10/2020)
- ML20268A354 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, FSAR Update Table of Contents, List of Current Pages (102 page(s), 6/30/2020)
- ML20268A353 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (488 page(s), 6/30/2020)
- ML20268A368 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (1006 page(s), 6/30/2020)
- ML20268A363 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 4, Reactor (264 page(s), 6/30/2020)
- ML20268A367 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System. (309 page(s), 6/30/2020)
- ML20268A362 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (526 page(s), 6/30/2020)
- ML20268A366 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation And Control. (265 page(s), 6/30/2020)
- ML20268A360 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Electric Power. (158 page(s), 6/30/2020)
- ML20268A365 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (457 page(s), 6/30/2020)
- ML20268A364 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (101 page(s), 6/30/2020)
- ML20268A370 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (298 page(s), 6/30/2020)
- ML20268A361 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection. (47 page(s), 6/30/2020)
- ML20268A369 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (45 page(s), 6/30/2020)
- ML20268A349 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests And Operation. (41 page(s), 6/30/2020)
- ML20268A350 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (609 page(s), 6/30/2020)
- ML20268A352 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Equipment Control Guidelines. (6 page(s), 6/30/2020)
- ML20268A355 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance. (66 page(s), 6/30/2020)
- ML20268A432 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 1, Fig 1.2-3, Drawing 500001-1, Piping and Mechanical Area Location Plan (1 page(s), 6/30/2020)
- ML20268A400 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 10, Fig 10.1-1 Drawing 6021770-30, Heat Balance Diagram, Unit 2: Max. calculated - Post LP Retrofit. (1 page(s), 6/30/2020)
- ML20268A425 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 10, Drawing 6021770-22-1 (1 page(s), 6/30/2020)
- ML20268A395 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Figure 10.1-5, Drawing 6021770-19, Max. Calculated - Post LP Retrofit (1 page(s), 6/30/2020)
- ML20268A460 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 10, Drawing 6021770-5 (1 page(s), 6/30/2020)
- ML20268A464 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 468999, Rev. 3. (1 page(s), 6/30/2020)
- ML20268A392 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Drawing 469001-1, Rev. 3 (1 page(s), 6/30/2020)
- ML20268A411 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102001-3, Rev. 13, Sheet 3 (1 page(s), 6/30/2020)
- ML20268A372 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023-2, Rev. 57, Sheet 2. (1 page(s), 6/30/2020)
- ML20268A383 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108001, Change 11, Sheet 3 of 3. (1 page(s), 6/30/2020)
- ML20268A376 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 36, Sheet 2 (1 page(s), 6/30/2020)
- ML20268A507 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102010, Sheet 3, Rev. 52 - Residual Heat Removal System. (1 page(s), 6/30/2020)
- ML20268A511 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108010-3, Rev. 31, Sheet 3 (1 page(s), 6/30/2020)
- ML20268A826 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102010, Rev. 32, Sheet 4. (1 page(s), 6/30/2020)
- ML20268A765 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108010, Sheet 4, Rev. 16. (1 page(s), 6/30/2020)
- ML20268A909 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102010, Rev. 29, Sheet 5 (1 page(s), 6/30/2020)
- ML20268A723 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108010, Rev. 18, Sheet 5, Residual Heat Removal System. (1 page(s), 6/30/2020)
- ML20268A672 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102011, Rev. 65, Sheet 2 (1 page(s), 6/30/2020)
- ML20268A652 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108011-6, Rev. 43, Sheet 6 (1 page(s), 6/30/2020)
- ML20268A593 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102011, Sheet 2A, Rev. 2, Nuclear Steam Supply Sampling System. (1 page(s), 6/30/2020)
- ML20268A570 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108011-2, Rev. 49, Sheet 2 (1 page(s), 6/30/2020)
- ML20268A800 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102011-3, Rev. 57, Sheet 3 (1 page(s), 6/30/2020)
- ML20268A635 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102011, Rev. 57, Sheet 3, (1 page(s), 6/30/2020)
- ML20268A891 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102011, Rev. 28, Sheet 4 (1 page(s), 6/30/2020)
- ML20268A965 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108011-4, Rev. 1, Sheet 4 (1 page(s), 6/30/2020)
- ML20268A628 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102011, Rev. 59, Sheet 5 (1 page(s), 6/30/2020)
- ML20268A857 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108011-5, Rev. 45, Sheet 5 (1 page(s), 6/30/2020)
- ML20268A527 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102011-6, Rev. 58, Sheet 6 (1 page(s), 6/30/2020)
- ML20268A640 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108012, Rev. 29, sheet 3, Containment Spray System. (1 page(s), 6/30/2020)
- ML20268A920 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108012-3, Rev 28, Sheet 3, Containment Spray System. (1 page(s), 6/30/2020)
- ML20268A930 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102013-2, Rev 45, Sheet 2 (1 page(s), 6/30/2020)
- ML20268A842 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102013-2A, Rev 2, Sheet 2A (1 page(s), 6/30/2020)
- ML20268A929 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108013-2, Rev 36, Sheet 2 (1 page(s), 6/30/2020)
- ML20268A641 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102014, Rev 59, Sheet 5, Component Cooling Water System. (1 page(s), 6/30/2020)
- ML20268A500 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108014-7, Rev 36, Sheet 7 (1 page(s), 6/30/2020)
- ML20268A501 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102014-8, Rev. 55, Sheet 8, Component Cooling Water System. (1 page(s), 6/30/2020)
- ML20268A924 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108014-8, Rev 41, Sheet 8, Component Cooling Water System. (1 page(s), 6/30/2020)
- ML20268A786 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102014-9, Rev. 61, Sheet 9, Component Cooling Water System. (1 page(s), 6/30/2020)
- ML20268A521 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108014-9, Rev 46, Sheet 9 (1 page(s), 6/30/2020)
- ML20268A943 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102014-10, Rev. 63, Sheet 10. (1 page(s), 6/30/2020)
- ML20268A875 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108014, Sheet 16 (1 page(s), 6/30/2020)
- ML20268A560 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108014, Rev. 49, Sheet 5. (1 page(s), 6/30/2020)
- ML20268A870 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102014-5A, Rev. 45, Sheet 5A. (1 page(s), 6/30/2020)
- ML20268A543 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102014-5B, Rev. 6, Sheet 5B. (1 page(s), 6/30/2020)
- ML20268A634 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108014, Rev. 35, Sheet 5A (1 page(s), 6/30/2020)
- ML20268A715 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102014, Rev. 56, Sheet 6. (1 page(s), 6/30/2020)
- ML20268A504 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108014-6, Rev. 44, Sheet 6 (1 page(s), 6/30/2020)
- ML20268A967 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102014, Rev. 37, Sheet 6A (1 page(s), 6/30/2020)
- ML20268A549 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108014, Rev. 30, Sheet 6A. (1 page(s), 6/30/2020)
- ML20268A903 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102014, Rev. 56, Sheet 7. (1 page(s), 6/30/2020)
- ML20268A550 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102015, Rev. 36, Sheet 3. (1 page(s), 6/30/2020)
- ML20268A556 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108015, Rev. 21, Sheet 7. (1 page(s), 6/30/2020)
- ML20268A910 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102015, Rev. 2, Sheet 3A, Service Cooling Water System. (1 page(s), 6/30/2020)
- ML20268A496 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108015, Rev. 26, Sheet 3, Service Cooling Water System. (1 page(s), 6/30/2020)
- ML20268A536 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108015, Rev. 2, Sheet 3A. (1 page(s), 6/30/2020)
- ML20268A718 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108015, Rev. 1, Sheet 3B (1 page(s), 6/30/2020)
- ML20268A637 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102015, Rev. 47, Sheet 4. (1 page(s), 6/30/2020)
- ML20268A895 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102015, Rev. 39, Sheet 4A, Service Cooling Water System. (1 page(s), 6/30/2020)
- ML20268A544 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108015, Rev. 26, Sheet 4 (1 page(s), 6/30/2020)
- ML20268A701 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102015-5, Rev. 43, Sheet 5. (1 page(s), 6/30/2020)
- ML20268A813 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108015, Sheet 5, Rev. 20, Service Cooling Water System. (1 page(s), 6/30/2020)
- ML20268A631 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102015, Rev 26, Sheet 6 (1 page(s), 6/30/2020)
- ML20268A575 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108015, Rev. 18, Sheet 6 (1 page(s), 6/30/2020)
- ML20268A713 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102015, Sheet 7, Rev. 40, Service Cooling Water System. (1 page(s), 6/30/2020)
- ML20268A696 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102016, Sheet 1, Rev. 99, Make-up Water System. (1 page(s), 6/30/2020)
- ML20268A912 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102016, Rev 85, Sheet 10 (1 page(s), 6/30/2020)
- ML20268A658 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102016, Rev. 97, Sheet 11 (1 page(s), 6/30/2020)
- ML20268A627 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102016, Rev. 83, Sheet 13, Make-Up Water System. (1 page(s), 6/30/2020)
- ML20268A806 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102016, Rev. 81, Sheet 14. (1 page(s), 6/30/2020)
- ML20268A660 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102016, Rev. 97, Sheet 16. (1 page(s), 6/30/2020)
- ML20268A706 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108016, Rev. 50, Sheet 17. (1 page(s), 6/30/2020)
- ML20268A794 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102016, Sheet 18 Rev. 86, Make-up Water System. (1 page(s), 6/30/2020)
- ML20268A579 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108016, Rev. 7, Sheet 19. (1 page(s), 6/30/2020)
- ML20268A568 - Diablo Canyon Power Plant, Units 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102016, Rev. 8, Sheet 20. (1 page(s), 6/30/2020)
- ML20268A758 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102016, Sheet 21, Rev. 110, Make-Up Water System. (1 page(s), 6/30/2020)
- ML20268A825 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102016, Rev 9, Sheet 21A (1 page(s), 6/30/2020)
- ML20268A716 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108016, Rev. 49, Sheet 1. (1 page(s), 6/30/2020)
- ML20268A610 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108016, Sheet 3, Rev. 51. (1 page(s), 6/30/2020)
- ML20268A839 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102016, Rev. 96, Sheet 4. (1 page(s), 6/30/2020)
- ML20268A962 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108016, Rev. 37, Sheet 5. (1 page(s), 6/30/2020)
- ML20268A874 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102016, sheet 6, Rev. 99, Make-Up Water system (1 page(s), 6/30/2020)
- ML20268A954 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102016, Rev. 10, Sheet 7. (1 page(s), 6/30/2020)
- ML20268A808 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102016, Sheet 8, Rev. 110, Make-Up Water System. (1 page(s), 6/30/2020)
- ML20268A601 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102016, Rev. 99, Sheet 9. (1 page(s), 6/30/2020)
- ML20268A736 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102016, Rev. 77, Sheet 9A. (1 page(s), 6/30/2020)
- ML20268A969 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102017, Rev. 10, Sheet 3 (1 page(s), 6/30/2020)
- ML20268A502 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102017, Rev. 102, Sheet 3A, Saltwater System. (1 page(s), 6/30/2020)
- ML20268A881 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102017, Rev. 96, Sheet 3B (1 page(s), 6/30/2020)
- ML20268A787 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108017, Rev. 79, Sheet 3 (1 page(s), 6/30/2020)
- ML20268A537 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108017, Rev. 83, Sheet 3A. (1 page(s), 6/30/2020)
- ML20268A770 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108017, Rev. 84, Sheet 3B (1 page(s), 6/30/2020)
- ML20268A489 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102017, Rev 68, Sheet 4, (1 page(s), 6/30/2020)
- ML20268A856 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Fig 3.2-17, Drawing 108017-4, Rev. 69, Sheet 4 of 18 (1 page(s), 6/30/2020)
- ML20268A665 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102017, Rev. 99, Sheet 5. (1 page(s), 6/30/2020)
- ML20268A888 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Fig 3.2-17 Sht 5A of 18 Drw 102017-5A Rev. 3, Saltwater System. (1 page(s), 6/30/2020)
- ML20268A614 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108017-5, Rev. 53, Sheet 5. (1 page(s), 6/30/2020)
- ML20268A616 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102017-6, Rev. 104, Sheet 6. (1 page(s), 6/30/2020)
- ML20268A927 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102017, Sheet 6A, Rev. 94, Saltwater Systems. (1 page(s), 6/30/2020)
- ML20268A571 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102017-6B, Rev. 1, Sheet 6B. (1 page(s), 6/30/2020)
- ML20268A863 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Fig 3.2-17, Drawing 108017-6, Rev. 96, Sheet 8 of 18 (1 page(s), 6/30/2020)
- ML20268A836 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108017, Sheet 6A, Rev. 67, Saltwater System. (1 page(s), 6/30/2020)
- ML20268A485 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108017, Rev. 9, Sheet 6B, Saltwater System. (1 page(s), 6/30/2020)
- ML20268A859 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Fig 3.2-17 Sht 8C of 18 Drw 108017-6C Rev. 1, Saltwater System. (1 page(s), 6/30/2020)
- ML20268A592 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102018-1, Rev. 82, Sheet 1. (1 page(s), 6/30/2020)
- ML20268A495 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108018, Rev. 29, Sheet 5. (1 page(s), 6/30/2020)
- ML20268A831 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108018, Rev. 30, Sheet 5A (1 page(s), 6/30/2020)
- ML20268A858 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Fig 3.2-18 Sht 11 of 27 Drw 102018-6 Rev. 74, Fire Protection System. (1 page(s), 6/30/2020)
- ML20268A792 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102018, Sheet 6A Rev. 72, Carbon Dioxide Fire Protection System Hose Reels (1 page(s), 6/30/2020)
- ML20268A904 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Fig 3.2-18 Sht 12 of 27 Drw 108018-6 Rev. 37, Fire Protection System. (1 page(s), 6/30/2020)
- ML20268A636 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108018, Rev. 35, Sheet 6A (1 page(s), 6/30/2020)
- ML20268A892 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102018, Sheet 7, Rev. 64, Fire Protection Systems. (1 page(s), 6/30/2020)
- ML20268A604 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108018, Rev. 40, Sheet 7, Fire Protection System. (1 page(s), 6/30/2020)
- ML20268A783 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Fig 3.2-18 Sht 15 of 27 Drw 102018-8 Rev. 38, CO2 Protection System For Intake Structure (1 page(s), 6/30/2020)
- ML20268A959 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108018, Rev. 20, Sheet 9 (1 page(s), 6/30/2020)
- ML20268A612 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102018, Rev. 80, Sheet 9 (1 page(s), 6/30/2020)
- ML20268A642 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108018, Rev. 20, Sheet 9 (1 page(s), 6/30/2020)
- ML20268A714 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102018, Rev. 3, Sheet 9, Fire Protection System (1 page(s), 6/30/2020)
- ML20268A775 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102018, Rev. 91, Sheet 2A. (1 page(s), 6/30/2020)
- ML20268A906 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102018, Sheet 2B, Rev. 85, Fire Protection Systems. (1 page(s), 6/30/2020)
- ML20268A976 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Fig 3.2-18 Sht 2 of 27 Drw 108018-2 Rev. 45, Yard Loop (1 page(s), 6/30/2020)
- ML20268A942 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102018, Rev. 2, Sheet 20 (1 page(s), 6/30/2020)
- ML20268A720 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Fig 3.2-18 Sht 3 of 27 Drw 102018-3 Rev. 89, Fire Protection System. (1 page(s), 6/30/2020)
- ML20268A680 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108018, Sheet 3 Rev. 20, Unit 1 Fuel Handling Bldg. (1 page(s), 6/30/2020)
- ML20268A522 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108018, Rev. 20, Sheet 3A (1 page(s), 6/30/2020)
- ML20268A620 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102018, Chapter 3, Rev. 77, Sheet 4 (1 page(s), 6/30/2020)
- ML20268A475 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108018, Rev. 40, Sheet 4 (1 page(s), 6/30/2020)
- ML20268A565 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Fig 3.2-18 Sht 7 of 27 Drw 102018-4A Rev. 50, Fire Protection System. (1 page(s), 6/30/2020)
- ML20268A661 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108018, Sheet 4A, Rev. 32, Fire Protection System. (1 page(s), 6/30/2020)
- ML20268A499 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102018-5, Rev. 83, Sheet 5. (1 page(s), 6/30/2020)
- ML20268A630 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102018-5A, Rev. 79, Sheet 5A. (1 page(s), 6/30/2020)
- ML20268A747 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019-3, Rev. 90, Sheet 3. (1 page(s), 6/30/2020)
- ML20268A809 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019, Rev. 18, Sheet 6. (1 page(s), 6/30/2020)
- ML20268A735 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019-6A, Rev. 82, Sheet 6A. (1 page(s), 6/30/2020)
- ML20268A712 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102019, Sheet 6B, Rev. 85, Liquid Radwaste System. (1 page(s), 6/30/2020)
- ML20268A534 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019-6A, Rev. 18, Sheet 6A. (1 page(s), 6/30/2020)
- ML20268A936 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019, Rev. 18, Sheet 6B. (1 page(s), 6/30/2020)
- ML20268A589 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102019, Sheet 7, Rev. 81, Liquid Radwaste System. (1 page(s), 6/30/2020)
- ML20268A644 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019-7, Rev. 18, Sheet 7. (1 page(s), 6/30/2020)
- ML20268A828 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019-8, Rev. 82, Sheet 8. (1 page(s), 6/30/2020)
- ML20268A827 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019-8A, Rev. 83, Sheet 8A. (1 page(s), 6/30/2020)
- ML20268A512 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019-8, Rev. 30, Sheet 8. (1 page(s), 6/30/2020)
- ML20268A654 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019, Rev. 48, Sheet 3. (1 page(s), 6/30/2020)
- ML20268A740 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019, Rev. 72, Sheet 3A. (1 page(s), 6/30/2020)
- ML20268A973 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019, Rev. 37, Sheet 38 (1 page(s), 6/30/2020)
- ML20268A886 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019, Rev. 31, Sheet 3A, Liquid Radwaste System. (1 page(s), 6/30/2020)
- ML20268A621 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019-3B, Rev. 17, Sheet 3B. (1 page(s), 6/30/2020)
- ML20268A921 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019-4, Rev. 83, Sheet 4. (1 page(s), 6/30/2020)
- ML20268A782 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019-4, Rev. 27, Sheet 4. (1 page(s), 6/30/2020)
- ML20268A476 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019-5, Rev. 83, Sheet 5. (1 page(s), 6/30/2020)
- ML20268A574 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019, Rev. 77, Sheet 5A, Liquid Radwaste System. (1 page(s), 6/30/2020)
- ML20268A750 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019, Rev. 81, Sheet 5B, Liquid Radwaste System. (1 page(s), 6/30/2020)
- ML20268A727 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019, Rev. 83, Sheet 5C. (1 page(s), 6/30/2020)
- ML20268A923 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019, Rev 23, Sheet 5 (1 page(s), 6/30/2020)
- ML20268A655 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019, Rev. 18, Sheet 5A. (1 page(s), 6/30/2020)
- ML20268A558 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108019, Rev 18, Sheet 5B, Waste Filters (1 page(s), 6/30/2020)
- ML20268A734 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019, Rev. 85, Sheet 6, Liquid Radwaste System. (1 page(s), 6/30/2020)
- ML20268A444 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 110, Sheet 4. (1 page(s), 6/30/2020)
- ML20268A435 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108002, Rev 81, Sheet 8, Condensate System (1 page(s), 6/30/2020)
- ML20268A380 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108002, Rev. 69, Sheet 8A, Boric Acid Injection Sub-System. (1 page(s), 6/30/2020)
- ML20268A403 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 131, Sheet 9, Condensate System. (1 page(s), 6/30/2020)
- ML20268A406 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 103, Sheet 9A. (1 page(s), 6/30/2020)
- ML20268A396 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev 4, Sheet 9B, Condensate System (1 page(s), 6/30/2020)
- ML20268A454 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108002, Rev. 94, Sheet 9, Condensate System (1 page(s), 6/30/2020)
- ML20268A390 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 108002, Rev. 4, Sheet 9A. Condensate System. (1 page(s), 6/30/2020)
- ML20268A463 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 103, Sheet 10. (1 page(s), 6/30/2020)
- ML20268A458 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108002, Rev. 48 (1 page(s), 6/30/2020)
- ML20268A438 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 105, Sheet 11, Main Condenser Tube Sheet Salt Water Leak Detention System. (1 page(s), 6/30/2020)
- ML20268A399 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108002, Rev. 66, Sheet 11, Condensate System (1 page(s), 6/30/2020)
- ML20268A409 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108002, Rev. 74, Sheet 4, Condensate System (1 page(s), 6/30/2020)
- ML20268A391 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 112, Sheet 5, Condensate System (1 page(s), 6/30/2020)
- ML20268A417 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 111, Sheet 5A, Condensate System. (1 page(s), 6/30/2020)
- ML20268A398 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108002, Rev. 83, Sheet 5, Condensate System. (1 page(s), 6/30/2020)
- ML20268A441 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 105, Sheet 6. (1 page(s), 6/30/2020)
- ML20268A455 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 113, Sheet 6A, Condensate System (1 page(s), 6/30/2020)
- ML20268A457 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108002, Rev. 87, Sheet 6, Condensate System. (1 page(s), 6/30/2020)
- ML20268A419 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 111, Sheet 7, Condensate System. (1 page(s), 6/30/2020)
- ML20268A443 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108002, Rev. 74, Sheet 7, Condensate System (1 page(s), 6/30/2020)
- ML20268A389 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 105, Sheet 8. (1 page(s), 6/30/2020)
- ML20268A426 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 105, Sheet 8A, Condensate System. (1 page(s), 6/30/2020)
- ML20268A960 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 65, Sheet 3, Lube Oil Distribution and Purification Systems. (1 page(s), 6/30/2020)
- ML20268A833 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 47, Sheet 7, Lube Oil Distribution and Purification Systems. (1 page(s), 6/30/2020)
- ML20268A737 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 55, Sheet, 8, Lube Oil Distribution and Purification Systems. (1 page(s), 6/30/2020)
- ML20268A587 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 44, Sheet 8, Lube Oil Distribution And Purification Systems (1 page(s), 6/30/2020)
- ML20268A925 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev 57, Sheet 9, Lube Oil Distribution and Purification (1 page(s), 6/30/2020)
- ML20268A802 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 38, Sheet 9, Lube Oil Distribution and Purification. (1 page(s), 6/30/2020)
- ML20268A773 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 54, Sheet 10, Lube Oil Distribution and Purification Systems (1 page(s), 6/30/2020)
- ML20268A948 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 42, Sheet 10, Lube Oil Distribution And Purification Systems (1 page(s), 6/30/2020)
- ML20268A814 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 1, Sheet 11. (1 page(s), 6/30/2020)
- ML20268A890 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 10, Sheet 11. (1 page(s), 6/30/2020)
- ML20268A744 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 58, Sheet 3A, Lube Oil Distribution and Purification Systems. (1 page(s), 6/30/2020)
- ML20268A914 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 32 Sheet 32, High Velocity Lube Oil Flushing System. (1 page(s), 6/30/2020)
- ML20268A911 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 57, Sheet 3, Oil Distribution and Purification System (1 page(s), 6/30/2020)
- ML20268A692 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 43, Sheet 3A. (1 page(s), 6/30/2020)
- ML20268A566 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 28, Sheet 3B (1 page(s), 6/30/2020)
- ML20268A835 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 47, Sheet 4, Lube Oil Distribution and Purification Systems. (1 page(s), 6/30/2020)
- ML20268A953 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev 41, Sheet 4, Lube Oil Distribution and Purification System (1 page(s), 6/30/2020)
- ML20268A805 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 57, Sheet 5, Lube Oil Distribution and Purification Systems. (1 page(s), 6/30/2020)
- ML20268A975 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 46, Sheet 5, Lube Oil Distribution And Purification Systems. (1 page(s), 6/30/2020)
- ML20268A498 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 56, Sheet 6, F.W Pump Turbine Control Oil System. (1 page(s), 6/30/2020)
- ML20268A769 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 47, Sheet 6A. (1 page(s), 6/30/2020)
- ML20268A647 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 2, Sheet 6B, Lube Oil Distribution and Purification Systems (1 page(s), 6/30/2020)
- ML20268A651 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 52, Sheet 6, Lube Oil Distribution and Purification Systems (1 page(s), 6/30/2020)
- ML20268A551 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 38, Sheet 6A. (1 page(s), 6/30/2020)
- ML20268A896 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108020, Rev. 2, Sheet 6B, Lube Oil Distribution And Purification Systems. (1 page(s), 6/30/2020)
- ML20268A966 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102020, Rev. 54, Sheet 7, Lube Oil Distribution and Purification Systems (1 page(s), 6/30/2020)
- ML20268A694 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev. 67, Sheet 2, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A569 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 49, Sheet 6, Diesel Engine Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A603 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 48, Sheet 6A, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A656 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 42, Sheet 6B, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A697 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev 73, Sheet 7, Diesel Engine-Generator Associated Systems (1 page(s), 6/30/2020)
- ML20268A670 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev. 73, Sheet 7A, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A710 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev 70, Sheet 7B, Diesel Engine Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A968 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Sheet 7, Rev. 51, Diesel Engine Generator Systems. (1 page(s), 6/30/2020)
- ML20268A730 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev 51, Sheet 7A, Diesel Engine-Generator Associated Systems (1 page(s), 6/30/2020)
- ML20268A572 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 52, Sheet 7B, Diesel Engine Generator Lube Oil System. (1 page(s), 6/30/2020)
- ML20268A673 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev. 65, Sheet 8, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A657 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 45, Sheet 8, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A702 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 45, Sheet 8A, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A872 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 45, Sheet 8B, Diesel Engine-Generator Associated Systems (1 page(s), 6/30/2020)
- ML20268A638 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev. 57, Sheet 9. (1 page(s), 6/30/2020)
- ML20268A491 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 39, Sheet 9. (1 page(s), 6/30/2020)
- ML20268A582 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 39, Sheet 9A, Misc., Instruments for Engine Generator. (1 page(s), 6/30/2020)
- ML20268A788 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 39, Sheet 9B. (1 page(s), 6/30/2020)
- ML20268A524 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev. 61, Sheet 3, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A928 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 40, Sheet 2. (1 page(s), 6/30/2020)
- ML20268A649 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev. 59, Sheet 3A, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A590 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 42, Sheet 3, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A742 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 44, Sheet 3A, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A837 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 42, Sheet 3B, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A932 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev. 62, Sheet 4 Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A898 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev. 58, Sheet 4A. (1 page(s), 6/30/2020)
- ML20268A722 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 45, Sheet 4, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A933 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 43, Sheet 4A, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A938 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 42, Sheet 4B, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A529 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev. 58, Sheet 5 (1 page(s), 6/30/2020)
- ML20268A567 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 44, Sheet 5. (1 page(s), 6/30/2020)
- ML20268A698 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 44, Sheet 5A. (1 page(s), 6/30/2020)
- ML20268A514 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108021, Rev. 39, Sheet 5B (1 page(s), 6/30/2020)
- ML20268A807 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev. 62, Sheet 6, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A540 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102021, Rev. 43, Sheet 6A, Diesel Engine-Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A542 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102022, Rev 51, Sheet 2 (1 page(s), 6/30/2020)
- ML20268A580 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108022, Sheet 6, Rev. 37, Turbine And Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A539 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102022, Rev. 10, Sheet 7. (1 page(s), 6/30/2020)
- ML20268A598 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108022, Rev 26, Sheet 6A, Hydrogen Gas Dryer (1 page(s), 6/30/2020)
- ML20268A743 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108022, Rev. 1, Sheet 7. (1 page(s), 6/30/2020)
- ML20268A487 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108022, Rev. 38, Sheet 2. (1 page(s), 6/30/2020)
- ML20268A555 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102022, Rev. 45, Sheet 3. (1 page(s), 6/30/2020)
- ML20268A481 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108022, Rev. 36, Sheet 3, Turbine and Generator Associated Systems (1 page(s), 6/30/2020)
- ML20268A515 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102022-, Rev. 56, Sheet 4, Turbine and Generator Associated Systems (1 page(s), 6/30/2020)
- ML20268A662 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108022, Rev 40, Sheet 4, Seal Oil Diagram (1 page(s), 6/30/2020)
- ML20268A834 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102022, Rev. 62, Sheet 5, Turbine and Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A950 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102022, Sheet 5A, Rev. 3, Turbine And Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A585 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108022, Rev. 45, Sheet 5, Turbine and Generator Associated Systems (1 page(s), 6/30/2020)
- ML20268A490 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108022, Rev. 1, Sheet 5A, Turbine and Generator Associated Systems (1 page(s), 6/30/2020)
- ML20268A733 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102022, Rev. 52, Sheet 6, Turbine And Generator Associated Systems. (1 page(s), 6/30/2020)
- ML20268A902 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102022, Rev. 38, Sheet 6A (1 page(s), 6/30/2020)
- ML20268A894 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 112, Sheet 3, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A659 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Sheet 7, Rev. 59, Post LOCA Sampling System HVAC. (1 page(s), 6/30/2020)
- ML20268A905 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 110, Sheet 9A, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A900 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 102, Sheet 10, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A689 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Sheet 10, Rev. 67, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A533 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 83, Sheet 3, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A970 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Sheet 13, Rev. 107, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A578 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Sheet 13A, Rev. 1, Roof Area - Elev. 163'-4". (1 page(s), 6/30/2020)
- ML20268A594 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 75, Sheet 13, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A908 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 91, Sheet 14, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A599 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 59, Sheet 14, Component Cooling Water System. (1 page(s), 6/30/2020)
- ML20268A675 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 21, Sheet 15. (1 page(s), 6/30/2020)
- ML20268A497 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 19, Sheet 16, Control Room HVAC (South), Safeguard System. (1 page(s), 6/30/2020)
- ML20268A643 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 48, Sheet 17A (1 page(s), 6/30/2020)
- ML20268A855 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 50, Sheet 17B, Control Room, Computer Room. (1 page(s), 6/30/2020)
- ML20268A799 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Sheet 17, Rev. 19, Control Room HVAC (North), Safeguard System. (1 page(s), 6/30/2020)
- ML20268A817 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 84, Sheet 15. (1 page(s), 6/30/2020)
- ML20268A699 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 110, Sheet 19, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A766 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 68, Sheet 18A, Turbine Bldg. Area A - Elevation 119' (Elevation Schematically Shown Looking North) (1 page(s), 6/30/2020)
- ML20268A728 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 70, Sheet 18B. (1 page(s), 6/30/2020)
- ML20268A583 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 99, Sheet 18C, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A513 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Sheet 18D. (1 page(s), 6/30/2020)
- ML20268A609 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 70, Sheet 18E. (1 page(s), 6/30/2020)
- ML20268A978 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 69, Sheet 18F. (1 page(s), 6/30/2020)
- ML20268A595 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 99, Sheet 4, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A693 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 48, Sheet 18A, Ventilation & Air Conditioning SYstems. (1 page(s), 6/30/2020)
- ML20268A876 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023 Rev. 47, Sheet 8B, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A532 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 45, Sheet 18C, Condensate Polishing Area. (1 page(s), 6/30/2020)
- ML20268A776 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 17, Sheet 19, Technical Support Center HVACs. (1 page(s), 6/30/2020)
- ML20268A798 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 100, Sheet 20. (1 page(s), 6/30/2020)
- ML20268A709 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Sheet 20, Rev. 69, Intake Structure. (1 page(s), 6/30/2020)
- ML20268A885 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 88, Sheet 4, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A488 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 81, Sheet 5, Ventilation & Air Conditioning Systems (1 page(s), 6/30/2020)
- ML20268A958 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 89, Sheet 5, Ventilation & Air Conditioning System (1 page(s), 6/30/2020)
- ML20268A754 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 53, Sheet 6A. (1 page(s), 6/30/2020)
- ML20268A685 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102023, Rev. 1, Sheet 6B. (1 page(s), 6/30/2020)
- ML20268A866 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 42, Sheet 6A, Outage Access Control Facility Heating & Ventilation. (1 page(s), 6/30/2020)
- ML20268A822 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 91, Sheet 7, Ventilation & Air Conditioning Systems. (1 page(s), 6/30/2020)
- ML20268A538 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102024, Rev. 32, Sheet 3, Gaseous Radwaste System. (1 page(s), 6/30/2020)
- ML20268A851 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108024, Rev. 25, Sheet 3, Gaseous Radwaste System. (1 page(s), 6/30/2020)
- ML20268A520 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102025, Rev. 66, Sheet 3, Compressed Air Systems (1 page(s), 6/30/2020)
- ML20268A547 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102025, Rev. 60, Sheet 3A, Compressed Air Systems. (1 page(s), 6/30/2020)
- ML20268A671 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102025, Rev. 52, Sheet 3B. (1 page(s), 6/30/2020)
- ML20268A971 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108025, Sheet 3, Rev. 14. (1 page(s), 6/30/2020)
- ML20268A597 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102025, Rev. 71, Sheet 4, Compressed Air Systems. (1 page(s), 6/30/2020)
- ML20268A760 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102025, Rev. 31, Sheet 4A. (1 page(s), 6/30/2020)
- ML20268A781 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108025, Rev. 36, Sheet 4. (1 page(s), 6/30/2020)
- ML20268A946 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102025, Rev 59, Sheet 5, Compressed Air Systems (1 page(s), 6/30/2020)
- ML20268A926 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108025, Rev 35, Sheet 5, Compressed Air Systems (1 page(s), 6/30/2020)
- ML20268A717 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102025, Rev. 47, Sheet 6. (1 page(s), 6/30/2020)
- ML20268A681 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108025, Rev 25, Sheet 6, Service Air (1 page(s), 6/30/2020)
- ML20268A561 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102025, Rev. 59, Sheet 8, Condensate Polishing Equip Service & Instrument Air Supply (1 page(s), 6/30/2020)
- ML20268A626 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108025, Rev. 34, Sheet 8. (1 page(s), 6/30/2020)
- ML20268A600 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102026, Rev 54, Sheet 3, Nitrogen & Hydrogen Systems (1 page(s), 6/30/2020)
- ML20268A623 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102026, Rev. 39, Sheet 3A, Nitrogen and Hydrogen Systems. (1 page(s), 6/30/2020)
- ML20268A622 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108026, Sheet 3, Rev. 27, Nitrogen And Hydrogen System. (1 page(s), 6/30/2020)
- ML20268A477 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102026, Rev. 49, Sheet 4, Nitrogen And Hydrogen System. (1 page(s), 6/30/2020)
- ML20268A526 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108026, Rev. 25, Sheet 4, Nitrogen and Hydrogen Systems (1 page(s), 6/30/2020)
- ML20268A525 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102027, Rev. 53, Sheet 3, Oily Water Separator and Turbine Bldg. Sump System. (1 page(s), 6/30/2020)
- ML20268A545 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108027, Rev. 12, Sheet 3, Oily Water Separator And Turbine Bldg. Sump System. (1 page(s), 6/30/2020)
- ML20268A437 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102003, Rev. 84, Sheet 3, Feedwater System. (1 page(s), 6/30/2020)
- ML20268A422 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108003, Rev. 10, Sheet 6. (1 page(s), 6/30/2020)
- ML20268A433 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102003, Sheet 3A, Rev. 70, Feedwater System. (1 page(s), 6/30/2020)
- ML20268A450 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108003, Sheet 3, Rev. 81, Feedwater System. (1 page(s), 6/30/2020)
- ML20268A445 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102003, Rev 84, Sheet 4, Feedwater System (1 page(s), 6/30/2020)
- ML20268A459 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108003, Rev. 68, Sheet 4, Feedwater System. (1 page(s), 6/30/2020)
- ML20268A385 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102003, Sheet 4A, Rev. 60, Feedwater System. (1 page(s), 6/30/2020)
- ML20268A413 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108003, Rev 45, Sheet 4A, Feedwater System (1 page(s), 6/30/2020)
- ML20268A449 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102003, Rev 65, Sheet 5, Feedwater Pumps Shaft Seal System (1 page(s), 6/30/2020)
- ML20268A378 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108003, Rev. 50, Sheet 5, Feedwater Pumps Shaft Seal System. (1 page(s), 6/30/2020)
- ML20268A427 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102003, Rev. 28, Sheet 6. (1 page(s), 6/30/2020)
- ML20268A468 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102004, Rev. 109, Sheet 3, Turbine Steam Supply System. (1 page(s), 6/30/2020)
- ML20268A379 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108004, Rev 92, Sheet 7, Turbine Steam Supply System (1 page(s), 6/30/2020)
- ML20268A440 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102004, Rev. 79, Sheet 8, Steam Generators Blowdown Treatment Demineralizer System (1 page(s), 6/30/2020)
- ML20268A388 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108004, Rev. 59, Sheet 8, Steam Generators Blowdown Treatment Demineralizer System (1 page(s), 6/30/2020)
- ML20268A381 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102004, Sheet 9, Rev. 19, Operation of Control & Regeneration Program for Steam Generators Blowdown Clean-Up Mixed Demineralizers. (1 page(s), 6/30/2020)
- ML20268A384 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102004, Rev. 87, Sheet 10, Turbine Steam Supply System. (1 page(s), 6/30/2020)
- ML20268A447 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108004, Rev 1, Sheet 9 (1 page(s), 6/30/2020)
- ML20268A382 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108004, Rev. 23, Sheet 10, Turbine Steam Supply System. (1 page(s), 6/30/2020)
- ML20268A408 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108004, Rev. 86, Sheet 3, Turbine Steam Supply System (1 page(s), 6/30/2020)
- ML20268A462 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102004, Rev. 106, Sheet 4, Turbine Steam Supply System. (1 page(s), 6/30/2020)
- ML20268A374 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108004, Rev 92, Sheet 4, Trubine Steam Supply System (1 page(s), 6/30/2020)
- ML20268A415 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102004, Rev. 120, Sheet 5, Turbine Steam Supply System (1 page(s), 6/30/2020)
- ML20268A451 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108004, Rev. 10, Sheet 5, Turbine Steam Supply System. (1 page(s), 6/30/2020)
- ML20268A414 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102004, Rev. 10, Sheet 6, Turbine Steam Supply System (1 page(s), 6/30/2020)
- ML20268A452 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102018, Rev. 3, Sheet 9, 108004, Rev. 84, Sheet 6, Turbine Steam Supply System (1 page(s), 6/30/2020)
- ML20268A423 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102004, Rev. 97, Sheet 7, Turbine Steam Supply System. (1 page(s), 6/30/2020)
- ML20268A402 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102005, Rev. 49, Sheet 2, Extraction Steam and Heater Drip Systems (1 page(s), 6/30/2020)
- ML20268A404 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108005, Rev. 22, Sheet 6 (1 page(s), 6/30/2020)
- ML20268A465 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102005, Rev. 43, Sheet 7. (1 page(s), 6/30/2020)
- ML20268A377 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108005, Rev. 46 Sheet 7, Feedwater Heaters (1 page(s), 6/30/2020)
- ML20268A386 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108005, Rev. 50, Sheet 2, Moisture Separator-Reheater and Feedwater Heather Drains (1 page(s), 6/30/2020)
- ML20268A431 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102005, Rev. 46, Sheet 3, Extraction Steam And Heater Drip Systems. (1 page(s), 6/30/2020)
- ML20268A394 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108005, Rev. 47, Sheet 4, Extraction Steam And Heater Drip System. (1 page(s), 6/30/2020)
- ML20268A424 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102005, Rev. 45, Sheet 4, Extraction Steam and Heater Drip Systems. (1 page(s), 6/30/2020)
- ML20268A453 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108005, Rev. 56, Sheet 4, Extraction Steam and Heater Drip Systems (1 page(s), 6/30/2020)
- ML20268A421 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102005, Rev. 29, Sheet 5, Extraction Steam and Heater System (1 page(s), 6/30/2020)
- ML20268A410 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108005, Rev. 53, Sheet 5, Extraction Steam and Heater Drip Systems (1 page(s), 6/30/2020)
- ML20268A466 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102005, Rev. 26, Sheet 6. (1 page(s), 6/30/2020)
- ML20268A442 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102006, Rev. 57, Sheet 3, Auxiliary Steam System. (1 page(s), 6/30/2020)
- ML20268A375 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102006, Rev. 50, Sheet 3A, Auxiliary Boiler O-2. (1 page(s), 6/30/2020)
- ML20268A436 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108006, Rev. 10, Sheet 3. (1 page(s), 6/30/2020)
- ML20268A428 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102006, Rev. 33, Sheet 3B, Auxiliary Boiler Blowdown & Room Sump Drains to Reverse Osmosis Sump (1 page(s), 6/30/2020)
- ML20268A405 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102006, Rev. 55, Sheet 4, Auxiliary Steam System. (1 page(s), 6/30/2020)
- ML20268A418 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108006, Rev. 25, Sheet 4, Auxiliary Steam System. (1 page(s), 6/30/2020)
- ML20268A387 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102006, Rev. 55, Sheet 4A, Auxiliary Steam System. (1 page(s), 6/30/2020)
- ML20268A439 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108006, Rev 10, 4A, B. A. Batching Tank Water Preheaters (1 page(s), 6/30/2020)
- ML20268A416 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102006, Rev. 33, Sheet 5, Auxiliary Steam System. (1 page(s), 6/30/2020)
- ML20268A434 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108006, Rev 13, Sheet 5 (1 page(s), 6/30/2020)
- ML20268A461 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102007, Rev 67, Sheet 3, Reactor Coolant System (1 page(s), 6/30/2020)
- ML20268A832 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108007, Rev. 49, Sheet 3, Reactor Coolant System. (1 page(s), 6/30/2020)
- ML20268A517 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102007, Rev. 71, Sheet 4, Reactor Coolant System. (1 page(s), 6/30/2020)
- ML20268A790 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108007, Rev. 59, Sheet 4, Reactor Coolant System (1 page(s), 6/30/2020)
- ML20268A682 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102007, Rev. 46, Sheet 5. (1 page(s), 6/30/2020)
- ML20268A752 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108007, Rev. 37, Sheet 5. (1 page(s), 6/30/2020)
- ML20268A645 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102007, Rev 57, Sheet 5A, Reactor Coolant System (1 page(s), 6/30/2020)
- ML20268A653 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102007, Rev. 50, Sheet 5B, Information on Sheet Incorporated on Sheet 5A. (1 page(s), 6/30/2020)
- ML20268A745 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108007, Rev 51, Sheet 5A, Reactor Coolant System (1 page(s), 6/30/2020)
- ML20268A683 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 116, Sheet 3, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A506 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Rev.69, Sheet 5, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A852 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 75, Sheet 5A. (1 page(s), 6/30/2020)
- ML20268A564 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Rev. 58, Sheet 5A, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A478 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 116, Sheet 5B, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A541 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Rev. 91, Sheet 5B, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A528 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 109, Rev. 5C, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A956 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Rev. 75, Sheet 5C, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A864 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 109, Sheet 5D, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A664 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 65, Sheet 6, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A893 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev 89, Sheet 6A, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A493 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Rev. 46, Sheet 6, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A934 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 80, Sheet 7, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A964 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 114, Sheet 3A, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A939 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 115, Sheet 3B, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A554 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev 115, Sheet 3C, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A850 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 102, Sheet 4A, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A901 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Rev. 105, Sheet 3, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A611 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Rev. 88, Sheet 7, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A503 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 104, Sheet 8,. (1 page(s), 6/30/2020)
- ML20268A869 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 98, Sheet 8A (1 page(s), 6/30/2020)
- ML20268A482 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Sheet 8, Rev. 84, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A639 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 102, Sheet 9, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A947 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Rev. 79, Sheet 9, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A830 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Rev. 79, Sheet 4A, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A729 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 115, Sheet 4, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A756 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Rev. 86, Sheet 4, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A676 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 115, Sheet 4B, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A812 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 117, Sheet 4C, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A663 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102018, Rev. 13, Sheet 4D, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A486 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 10, Sheet 4E, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A861 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008, Rev. 112, Sheet 4B, Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268A669 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108008-, Rev. 1, Sheet 4C (1 page(s), 6/30/2020)
- ML20268A678 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102008, Rev. 115, Sheet 5, Chemical & Volume Control System. (1 page(s), 6/30/2020)
- ML20268A602 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102009, Rev. 68, Sheet 3, Safety Injection System (1 page(s), 6/30/2020)
- ML20268A768 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108009, Rev. 5, Sheet 7. (1 page(s), 6/30/2020)
- ML20268A941 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108009, Rev. 55, Sheet 3, Safety Injection System. (1 page(s), 6/30/2020)
- ML20268A789 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102009, Rev. 83, Sheet 4, Safety Injection System (1 page(s), 6/30/2020)
- ML20268A916 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108009, Rev. 77, Sheet 4, Safety Injection System (1 page(s), 6/30/2020)
- ML20268A548 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102009, Rev. 77, Sheet 5, Safety Injection System. (1 page(s), 6/30/2020)
- ML20268A494 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102009, Rev. 1, Sheet 5A, Safety Injection System (1 page(s), 6/30/2020)
- ML20268A793 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108009, Rev. 64, Sheet 5, Safety Injection System (1 page(s), 6/30/2020)
- ML20268A738 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108009, Rev. 2, Sheet 5A, Safety Injection System. (1 page(s), 6/30/2020)
- ML20268A771 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102009, Rev. 19, Sheet 6. (1 page(s), 6/30/2020)
- ML20268A931 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108009, Rev. 17, Sheet 6 (1 page(s), 6/30/2020)
- ML20268A535 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102009, Rev. 14, Sheet 7. (1 page(s), 6/30/2020)
- ML20268A907 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 505481, Rev. 3, Piping & Mechanical Auxiliary Feedwater Pump Turbine Missile Shield (1 page(s), 6/30/2020)
- ML20268A846 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438288, Rev. 3, Pipe Rupture Restraints Plan Below EL. 120 Containment Structure-Area "F" & "G" (1 page(s), 6/30/2020)
- ML20268A882 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 443359, Rev. 3, Sheet 1, Pipe Rupture Restraints Plan Below EL. 120 Containment Structure Area F & G. (1 page(s), 6/30/2020)
- ML20268A887 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 443252, Rev. 15, Civil Interior Concrete Outline Plan at EL. 119' - 0" & 140' - 0" Containment Structure Areas "G" & "F" (1 page(s), 6/30/2020)
- ML20268A755 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438233, Rev. 20, Sheet 1, Interior Concrete Outline Plans at Elevation 124'-0" & 140'-0" Containment Structure. (1 page(s), 6/30/2020)
- ML20268A606 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 443254, Rev. 12, Sheet 1, Civil Interior Concrete Outline Main Sections Containment Structure (1 page(s), 6/30/2020)
- ML20268A608 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438234, Rev 19, Sheet 1, Civil Interior Concrete Outline Main Sections Containment Structure (1 page(s), 6/30/2020)
- ML20268A559 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 443276, Rev. 4 (1 page(s), 6/30/2020)
- ML20268A552 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438231, Rev. 7, Sheet 1, Interior Concrete General Notes and Typical Details. (1 page(s), 6/30/2020)
- ML20268A668 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 443277, Rev. 3, Interior Concrete Reinforcing Sections & Details Containment Structure (1 page(s), 6/30/2020)
- ML20268A819 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438239, Rev. 5, Sheet 1, Interior Concrete Reinforcing Slab at EL. 91-0- North Containment Structure Area "F" (1 page(s), 6/30/2020)
- ML20268A937 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438240, Rev. 7, Sheet 1, Civil Interior Concrete Reinforcing Slab at EL. 91' - 0" - South Containment Structure - Area "G" (1 page(s), 6/30/2020)
- ML20268A615 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438242, Rev. 6, Interior Concrete Reinforcing Reactor Cavity Plan Containment Structure Area F & G (1 page(s), 6/30/2020)
- ML20268A762 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 443370, Rev. 4, Sheet 1, Civil Concrete Outline and Reinforcing Annulus Platform at Elevation 140' Containment Structure-Areas F & G (1 page(s), 6/30/2020)
- ML20268A707 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 447254, Rev. 5, Sheet 1, Civil Concrete Outline & Reinforcing Annulus Platform @ El. 140'Containment Structure Area F & G (1 page(s), 6/30/2020)
- ML20268A472 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438267, Rev. 2, Sheet 1, Requirements for 200 Ton Polar Crane Containment Structure. (1 page(s), 6/30/2020)
- ML20268A700 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 443204, Rev. 12, Sheet 1, Civil Concrete Outline Plans at Elev. 85'-0" & 100'-9" auxiliary Building - Area "L" (1 page(s), 6/30/2020)
- ML20268A761 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 443205, Rev. 6, Sheet 1, Concrete Outline Floor Plans El. 115'-0" & 140'-0" Auxiliary Building - Area L. (1 page(s), 6/30/2020)
- ML20268A509 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438441, Sheet 1, Rev. 13, Concrete Outline Section K-K Auxiliary Building - Areas H&K (1 page(s), 6/30/2020)
- ML20268A613 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438457, Sheet 1, Rev. 9, Concrete Reinforcing Plan At Elevation 115'-0" Auxiliary Building Areas J. GE & GW (1 page(s), 6/30/2020)
- ML20268A648 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 443227, Rev. 1, Sheet 1, Concrete Reinforcing Plan Auxiliary Building El. 115'-0" South Areas J, GE & GW. (1 page(s), 6/30/2020)
- ML20268A824 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438458, Rev. 7, Sheet 1, Concrete Reinforcing Plan at Elev. 115'-0" Auxiliary Building - Area H & K. (1 page(s), 6/30/2020)
- ML20268A581 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 443216, Rev. 3, Sheet 1, Concrete Reinforcing Plans at Elev. 115'-0" & 140'-0" Auxiliary Building - Area L. (1 page(s), 6/30/2020)
- ML20268A629 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 443460, Rev. 3, Concrete Reinforcing Miscellaneous Sections-Auxiliary Bldg Area K (1 page(s), 6/30/2020)
- ML20268A889 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 38471, Rev. 11, Concrete Reinforcing - Sections Auxiliary Building Area H, K & GE (1 page(s), 6/30/2020)
- ML20268A588 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438465, Rev. 3, Concrete Outline Sections at Elev. 163'-4" Areas H & K (1 page(s), 6/30/2020)
- ML20268A505 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438474, Rev. 6, Spent Fuel Pool Reinforcing Auxiliary Building-Areas J & GE (1 page(s), 6/30/2020)
- ML20268A899 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 439506, Rev. 8, Sheet 1, Civil Elevations and Details Crane Support Structure Auxiliary Building Areas J & K (1 page(s), 6/30/2020)
- ML20268A741 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 439507, Rev. 7, Sheet 1, Civil Typical Sections and Details Crane Support Structure Auxiliary Building Areas J & K. (1 page(s), 6/30/2020)
- ML20268A480 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 439509, Rev. 4, Sheet 1, Mechanical Requirements for 125 Ton Crane Auxiliary Building Fuel Handling Area. (1 page(s), 6/30/2020)
- ML20268A951 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 463987, Sheet 1, Rev. 29, Civil Exterior Concrete Tank Protection (1 page(s), 6/30/2020)
- ML20268A873 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 438034, Sheet 1, Rev. 7, Foundations for Water Tanks (1 page(s), 6/30/2020)
- ML20268A818 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 59459, Sheet 1, Rev. 45, Civil Concrete Outline Plan At Top Deck Area 1 Intake Structure (1 page(s), 6/30/2020)
- ML20268A879 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 59460, Sheet 1, Rev. 38, Civil Concrete Outline Plan At Top Deck Area Intake Structure (1 page(s), 6/30/2020)
- ML20268A844 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 59461, Rev. 40, Sheet 1, Civil Concrete Outline Plan @ Pump Deck Area Intake Structure. (1 page(s), 6/30/2020)
- ML20268A725 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 59462, Rev. 35, Sheet 1, Civil Concrete Outline Plan at Pump Deck Area 2 Intake Structure. (1 page(s), 6/30/2020)
- ML20268A772 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 59463, Rev. 11, Sheet 1, Civil Concrete Outline Plan at Invert Area I Intake Structure (1 page(s), 6/30/2020)
- ML20268A667 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 59464, Rev. 12, Sheet 1, Concrete Outline Plan At Invert Area 2 Intake Structure. (1 page(s), 6/30/2020)
- ML20268A753 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 515213, Rev. 6, Sheet 1, Architectural Safety Related Masonry Walls Turbine Building Elev. 85'-0', 107'-0', 119'-0', 140'-0'. (1 page(s), 6/30/2020)
- ML20268A510 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 515214, Rev. 6, Sheet 1, Architectural Safety Related Masonry Walls Turbine Building Elev. 85'-0", 104'-0', 107'-0, 119'-0', 140'-0'. (1 page(s), 6/30/2020)
- ML20268A945 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 515215, Rev. 8, Sheet 1, Architectural Safety Related Masonry Walls Auxiliary Building Elev 85'-0", 100'-0", 115'-0", 140'-0", 154'-0". (1 page(s), 6/30/2020)
- ML20268A796 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 4, Drawing 6006510, Rev. 0, Sheet 1. (1 page(s), 6/30/2020)
- ML20268A820 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 4, Drawing 6006510, Rev. 0, Sheet 1, Control Rod (Ionitrided). (1 page(s), 6/30/2020)
- ML20268A577 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 4, Drawing 16A20242 (1 page(s), 6/30/2020)
- ML20268A878 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 6023226, Rev. 2, Sheet 27 (1 page(s), 6/30/2020)
- ML20268A961 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 5, Drawing 500825, Rev. 26, Sheet 1, I & C Function Diagram Reactor - Turbine - Generator Protection (1 page(s), 6/30/2020)
- ML20268A829 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 5, Drawing 500800, Rev. 19, Sheet 1, I & C Functional Diagram Reactor - Turbine - Generator Protection (1 page(s), 6/30/2020)
- ML20268A815 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Drawing 107031, Sheet 4, Rev. 3, Aux Feed Pumps (1 page(s), 6/30/2020)
- ML20268A974 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 107031, Rev 6, Sheet 1A, Long Term Cooling Water System. (1 page(s), 6/30/2020)
- ML20268A883 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495841, Rev. 1, Functional Logic Diagram Index and Symbols. (1 page(s), 6/30/2020)
- ML20268A695 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495875, Rev 5, Sheet 1, I & C Functional Logic Diagram Primary Coolant System Trip Signals (1 page(s), 6/30/2020)
- ML20268A838 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495846, Rev 3, Sheet 1, I & C Functional Logic Diagram Pressurizer Trip Signals (1 page(s), 6/30/2020)
- ML20268A519 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495876, Rev. 3, Sheet 1, I & C Functional Logic Diagram Pressurizer Trip Signals. (1 page(s), 6/30/2020)
- ML20268A804 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495847, Sheet 1, Rev. 8, I & C Functional Logic Diagram Steam Generator Trip Signals (1 page(s), 6/30/2020)
- ML20268A516 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495877, Rev. 6, Sheet 1, Functional Logic Diagram Steam Generator Trip SIgnals. (1 page(s), 6/30/2020)
- ML20268A972 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495848, Rev. 10, Sheet 1, I & C Functional Logic Diagram Safeguards Actuation Signals (1 page(s), 6/30/2020)
- ML20268A617 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495878, Rev. 5, Sheet 1, I & C Functional Logic Diagram Safeguards Actuation Signals (1 page(s), 6/30/2020)
- ML20268A778 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495849, Rev 7, Sheet 1, I & C Functional Logic Diagram Rod Controls & Rod Blocks (1 page(s), 6/30/2020)
- ML20268A940 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 4958791, Rev. 7, Sheet 1, I & C Functional Logic Diagram Rod Controls & Rod Blocks (1 page(s), 6/30/2020)
- ML20268A688 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495850, Rev. 3, Sheet 1, Electrical Functional Diagram Steam Dump Control (1 page(s), 6/30/2020)
- ML20268A803 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495871, Rev. 1, Sheet 1, Functional Logic Diagram Index and Symbols. (1 page(s), 6/30/2020)
- ML20268A562 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 4958801, Rev. 4, Sheet 1, Electrical Functional Diagram Steam Dump Control. (1 page(s), 6/30/2020)
- ML20268A884 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495851, Rev. 3, Sheet 1, I & C Functional Logic Diagram Pressurizer & Level Control. (1 page(s), 6/30/2020)
- ML20268A780 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495881, Rev 3, Sheet 1, I & C Functional Logic Diagram Pressurizer Pressure & Level Conttrol (1 page(s), 6/30/2020)
- ML20268A801 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495852, Rev 2, Sheet 1, I & C Functional Logic Diagram Pressurizer Heater Control (1 page(s), 6/30/2020)
- ML20268A531 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495882, Rev. 2, Sheet 1, Functional Logic Diagram Pressurizer Heater Control. (1 page(s), 6/30/2020)
- ML20268A871 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495853, Rev. 5, Sheet 1, I & C Functional Logic Diagram Feedwater Control & Isolation. (1 page(s), 6/30/2020)
- ML20268A868 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495883, Sheet 1, Rev. 5, I & C Functional Logic Diagram Feedwater Control & Isolation (1 page(s), 6/30/2020)
- ML20268A724 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495854, Rev. 2, Sheet 1, Functional Logic Diagram Feedwater Control & Isolation. (1 page(s), 6/30/2020)
- ML20268A607 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495884, Rev. 2, Sheet 1, Functional Logic Diagram Feedwater Control & Isolation. (1 page(s), 6/30/2020)
- ML20268A784 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495855, Rev. 5, Sheet 1, I & C Functional Logic Diagram Auxiliary Feedwater Pumps Startup. (1 page(s), 6/30/2020)
- ML20268A849 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 495842, Rev. 3, Functional Logic Diagram Reactor Trip Signals (1 page(s), 6/30/2020)
- ML20268A847 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 495885, Rev. 5, Sheet 1, I & C Functional Logic Diagram Auxiliary Fedwater Pumps Startup (1 page(s), 6/30/2020)
- ML20268A845 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495856, Rev. 11, Sheet 1, I & C Turbine Trips, Runbacks & Other Signals Functional Logic. (1 page(s), 6/30/2020)
- ML20268A877 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495886, Rev. 11, Sheet 1, I & C Functional Loop Diagram Turbine Trips, Runbacks, & Other Signals. (1 page(s), 6/30/2020)
- ML20268A748 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495857, Rev. 2, Sheet 1, I & C Functional Logic Diagram AMSAC Signals (1 page(s), 6/30/2020)
- ML20268A749 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495887, Rev. 2, Sheet 1, I & C Functional Logic Diagram AMSAC Signals (1 page(s), 6/30/2020)
- ML20268A767 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 495858, Rev. 2, Functional Logic Diagram Seismic Trip (1 page(s), 6/30/2020)
- ML20268A686 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495888, Rev. 2, Functional Diagram Seismic Trip (1 page(s), 6/30/2020)
- ML20268A763 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495872, Sheet 1, Rev. 2, Functional Logic Diagram Reactor Trip Signals (1 page(s), 6/30/2020)
- ML20268A840 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495843, Rev. 3, Sheet 1, I & C Functional Logic Diagram Nuclear Instrumentation & Manual Trips (1 page(s), 6/30/2020)
- ML20268A777 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495873, Rev. 4, Sheet 1, I & C Functional Logic Diagram Nuclear Inst. & Manual Trip Signals (1 page(s), 6/30/2020)
- ML20268A523 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495844, Sheet 1, Rev. 3, I & C Functional Logic Diagram Nuclear Instrumentation Permissives & Blocks (1 page(s), 6/30/2020)
- ML20268A479 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 495874, Rev. 3, Sheet 1, I & C Functional Diagram Nuclear Instr Permissives & Blocks (1 page(s), 6/30/2020)
- ML20268A508 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495845, Rev. 5, Sheet 1, I & C Functional Logic Diagram Primary Coolant System Trip Signals. (1 page(s), 6/30/2020)
- ML20268A646 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 19425, Rev. 3, Logic Diagram Symbols (1 page(s), 6/30/2020)
- ML20268A492 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 19411, Rev. 4, Logic Diagram Safety Injection Pumps (1 page(s), 6/30/2020)
- ML20268A687 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 102794, Rev. 3, Sheet 1, Logic Diagram Safety Injection Pumps. (1 page(s), 6/30/2020)
- ML20268A576 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 19412, Sheet 1, Rev. 4, Logic Diagram Containment Spray Pumps (1 page(s), 6/30/2020)
- ML20268A922 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 102795, Rev. 3, Sheet 1, Logic Diagram Containment Spray Pumps. (1 page(s), 6/30/2020)
- ML20268A732 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 19413, Rev. 3 Sheet 1, Electrical Logic Diagram Primary Make-up Water Pumps. (1 page(s), 6/30/2020)
- ML20268A553 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 102796, Rev. 3, Sheet 1, Electrical Logic Diagram Make-Up Water Pumps. (1 page(s), 6/30/2020)
- ML20268A913 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 19414, Rev. 3, Sheet 1, Electrical Logic Diagram Boric Acid Transfer Pumps (1 page(s), 6/30/2020)
- ML20268A708 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 102797, Rev. 3, Sheet 1, Electrical Logic Diagram Boric Acid Transfer Pumps (1 page(s), 6/30/2020)
- ML20268B184 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437507, Sheet 1 (1 page(s), 6/30/2020)
- ML20268B090 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441301, Rev. 22, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268B112 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437551, Rev. 23, Sheet 1, Electrical Schematic Diagram Turbine Control (1 page(s), 6/30/2020)
- ML20268B081 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441253, Rev. 24, Sheet 1, Electrical Schematic Diagram Turbine Control (1 page(s), 6/30/2020)
- ML20268B163 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437567, Rev. 38, Sheet 1, Electrical Schematic Diagram Feedwater Pump Turbine Control (1 page(s), 6/30/2020)
- ML20268B030 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441270, Rev. 42, Sheet 1, Electrical Schematic Diagram Feedwater Pump Turbines 21 & 22 Control (1 page(s), 6/30/2020)
- ML20268B166 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437583, Rev. 25, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pumps (1 page(s), 6/30/2020)
- ML20268B086 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441302, Rev. 21, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pump (1 page(s), 6/30/2020)
- ML20268B177 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437584, Rev. 19, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pump Turbine Control (1 page(s), 6/30/2020)
- ML20268A989 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 455060, Rev. 14, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pumps Turbine Control (1 page(s), 6/30/2020)
- ML20268B052 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441303, Rev. 14, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pumps Turbine Control (1 page(s), 6/30/2020)
- ML20268B021 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 455097, Rev. 16, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pump Turbine Control. (1 page(s), 6/30/2020)
- ML20268B076 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437585, Rev. 23, Sheet 1, Electrical Schematic Diagram Feedwater Motor Operated Isolation Valves (1 page(s), 6/30/2020)
- ML20268A990 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441304, Rev. 17, Sheet 1, Electrical Schematic Diagram Feedwater Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268A530 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 338070, Rev. 3, Sheet 1, Logic Diagram Reactor Coolant Pump. (1 page(s), 6/30/2020)
- ML20268A677 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Drawing 102787, Rev. 4, Sheet 1, Logic Diagram Reactor Coolant Pumps. (1 page(s), 6/30/2020)
- ML20268B042 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 477846, Rev. 18, Sheet 1, Electrical Schematic Diagram Reactor Coolant Pump II (1 page(s), 6/30/2020)
- ML20268B058 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441305, Rev. 19, Sheet 1, Electrical Schematic Diagram Reactor Coolant Pumps (1 page(s), 6/30/2020)
- ML20268B033 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437587, Rev. 20, Sheet 1, Electrical Schematic Diagram Reactor Coolant Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268B032 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437609, Rev. 17, Sheet 1, Electrical Schematic Diagram Reactor Coolant System Solenoid Valves (1 page(s), 6/30/2020)
- ML20268B037 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441306, Rev. 18, Sheet 1, Electrical Schematic Diagram Reactor Coolant Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268A986 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 441328, Rev. 10, Sheet 1, Electrical Schematic Diagram Reactor Coolant System Solenoid Valves (1 page(s), 6/30/2020)
- ML20268B087 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437588, Sheet 1, I & C Schematic Diagram Safety Injection System Solenoid Valves (1 page(s), 6/30/2020)
- ML20268B082 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441316, Rev. 6, Sheet 1, Electrical Schematic Diagram Safety Injection System Solenoid Valves (1 page(s), 6/30/2020)
- ML20268B011 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437589, Rev. 17, Sheet 1, Electrical Schematic Diagram Safety Injection Pumps (1 page(s), 6/30/2020)
- ML20268B132 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441315, Sheet 1, Rev. 16, Electrical Schematic Diagram Safety Injection Pump (1 page(s), 6/30/2020)
- ML20268B055 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437590, Sheet 1, Rev. 20, Electrical Schematic Diagram Containment Spray Pumps (1 page(s), 6/30/2020)
- ML20268B028 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441307, Sheet 1, Rev. 16, Electrical Schematic Diagram Containment Spray Pumps (1 page(s), 6/30/2020)
- ML20268B172 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437591, Rev. 26, Sheet 1, Electrical Schematic Diagram Residual Heat Removal Pumps (1 page(s), 6/30/2020)
- ML20268B077 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441309, Sheet 1, Rev. 24, Electrical Schematic Diagram Residual Heat Removal Pumps (1 page(s), 6/30/2020)
- ML20268B091 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437592, Rev. 39, Sheet 1, Electrical Schematic Diagram Residual Heat Removal Flow Control Valves (1 page(s), 6/30/2020)
- ML20268B122 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441310, Sheet 1, Rev. 32, Electrical Schematic Diagram Residual Heat Removal Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268B010 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437593, Sheet 1, Rev. 33, Electrical Schematic Diagram Component Cooling Water Pumps (1 page(s), 6/30/2020)
- ML20268B124 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441311, Sheet 1, Rev. 28, Electrical Schematic Diagram Component Cooling Water Pumps (1 page(s), 6/30/2020)
- ML20268B017 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437594, Sheet 1, Rev. 33, Electrical Schematic Diagram Auxiliary Salt Water Pump (1 page(s), 6/30/2020)
- ML20268B005 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441287, Sheet 1, Rev. 28, Electrical Schematic Diagram Auxiliary Saltwater Pumps (1 page(s), 6/30/2020)
- ML20268B101 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437595, Sheet 1, Rev. 33, Electrical Schematic Diagram Charging Pumps No. 11 & 12 (1 page(s), 6/30/2020)
- ML20268B072 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441312, Rev. 28, Sheet 1, Electrical Schematic Diagram Charging Pumps No. 21 & 22 (1 page(s), 6/30/2020)
- ML20268A853 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 19404, Rev. 6, Sheet 1, Electrical Logic Diagram Centrifugal Charging Pump 1-3 (1 page(s), 6/30/2020)
- ML20268A632 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 102788, Sheet 1, Rev. 5, I & C Logic Diagram Centrifugal Charging Pump 2-3 (1 page(s), 6/30/2020)
- ML20268B029 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437596, Sheet 1, Rev. 15, Electrical Schematic Reactor Coolant Make-Up Control (1 page(s), 6/30/2020)
- ML20268B179 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437597, Sheet 1, Rev. 20, Electrical Schematic Diagram Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268B079 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437598, Sheet 1, Rev. 23, Electrical Schematic Diagram C.V.C.S. and Make-Up Water Pumps (1 page(s), 6/30/2020)
- ML20268B092 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437599, Sheet 1, Rev. 23, Electrical Schematic Diagram Chemical & Volume Control System Boric Acid Evaporator Control Valves (1 page(s), 6/30/2020)
- ML20268B161 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441320, Rev. 11, Sheet 1, Electrical Schematic Diagram Reactor Coolant Make-Up Control. (1 page(s), 6/30/2020)
- ML20268B181 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441321, Rev. 15, Sheet 1, Electrical Schematic Diagram Chemical and Volume Control System (1 page(s), 6/30/2020)
- ML20268B170 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441322, Sheet 1, Rev. 2, Electrical Schematic Diagram Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268B004 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 477316, Sheet 1, Rev. 6, Electrical Schematic Diagram Chemical Volume & Control System Boric Acid Evap Control Valves (1 page(s), 6/30/2020)
- ML20268B128 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437600, Sheet 1, Rev. 42, Electrical Schematic Diagram Containment Fan Coolers (1 page(s), 6/30/2020)
- ML20268B046 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437600, Sheet 2, Rev. 3, Electrical Schematic Diagram Containment Fan Coolers (1 page(s), 6/30/2020)
- ML20268B185 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441313, Sheet 1, Rev. 37, Electrical Schematic Diagram Containment Fan Coolers (1 page(s), 6/30/2020)
- ML20268B121 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441313, Sheet 2, Rev. 6, Electrical Schematic Diagram Containment Fan Coolers No. 21, 23, 24, & 25 (1 page(s), 6/30/2020)
- ML20268B154 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437604, Rev. 23, Sheet 1, Electrical Schematic Diagram Containment Spray System Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268B137 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441308, Sheet 1, Rev. 18, Electrical Schematic Diagram Containment Spray System Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268B113 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437605, Sheet 1, Rev. 22, Electrical Schematic Diagram Safety Injection System Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268B175 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437606, Sheet 1, Rev. 30, Electrical Schematic Diagram Safety Injection System Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268B120 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437606, Sheet 2, Rev. 1, Electrical Schematic Diagram Safety Injection System Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268B034 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441317, Rev. 20, Sheet 1, Electrical Schematic Diagram Safety Injection System Motor Operated Valves. (1 page(s), 6/30/2020)
- ML20268B070 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 441318, 26, Sheet 1, Electrical Schematic Diagram Safety Injection System Motor Operated Valves. (1 page(s), 6/30/2020)
- ML20268B107 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441318, Rev. 1, Sheet 2, Electrical Schematic Diagram Safety Injection System Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268B060 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437607, Rev. 24, Sheet 1, Electrical Schematic Diagram Chemical and Volume Control System Motor Operated Valves. (1 page(s), 6/30/2020)
- ML20268B178 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437607, Sheet 2, Rev. 1, Electrical Schematic Diagram Chemical and Volume Control System Motor Operated Valves (1 page(s), 6/30/2020)
- ML20268B049 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441324, Rev. 18, Sheet 1, Electrical Schematic Diagram CVSC Motor Operated Valves. (1 page(s), 6/30/2020)
- ML20268B160 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 441324, Rev. 1, Sheet 2, Electrical Schematic Diagram CVCS Motor Operated Valves. (1 page(s), 6/30/2020)
- ML20268B146 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437608, Rev. 20, Sheet 1, Electrical Schematic Diagram Component Cooling System Motor Operated Valves. (1 page(s), 6/30/2020)
- ML20268B056 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441325, Rev. 19, Sheet 1, Electrical Schematic Diagram Component Cooling System Motor Operated Valves. (1 page(s), 6/30/2020)
- ML20268A997 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437610, Rev. 23, Sheet 1, Electrical Schematic Diagram Reactor Trip Breakers. (1 page(s), 6/30/2020)
- ML20268B129 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441489, Rev. 17, Sheet 1, Electrical Schematic Diagram Reactor Trip Breaker. (1 page(s), 6/30/2020)
- ML20268B105 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437630, Rev. 10, Sheet 1, Schematic Diagram Fire Pumps. (1 page(s), 6/30/2020)
- ML20268B110 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 437631, Rev. 29, Sheet 1, Electrical Schematic Diagram Containment Purge System. (1 page(s), 6/30/2020)
- ML20268B171 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441490, Sheet 1, Rev. 19, Electrical Schematic Diagram Containment Purge System (1 page(s), 6/30/2020)
- ML20268B157 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437632, Sheet 1, Rev. 22, Electrical Schematic Diagram Plant Air Compressors (1 page(s), 6/30/2020)
- ML20268A625 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 19405, Rev. 7, Logic Diagram Centrifugal Charging Pumps (1 page(s), 6/30/2020)
- ML20268A473 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 102789, Rev. 5, Sheet 1, Logic Diagram Centrifugal Charging Pumps. (1 page(s), 6/30/2020)
- ML20268B148 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 437634, Rev. 14, Sheet 1, Electrical Schematic Diagram Control Rod Drive Motor Generator Set. (1 page(s), 6/30/2020)
- ML20268B097 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437603, Rev. 7, Sheet 1, Electrical Schematic Diagram Control Rod Drive Motor Generator Set. (1 page(s), 6/30/2020)
- ML20268B015 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441488, Sheet 1, Rev. 12, Electrical Schematic Diagram Control Rod Drive Motor Generator Set (1 page(s), 6/30/2020)
- ML20268B093 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441487, Rev 5, Sheet 1, Electrical Schematic Diagram Control Rod Drive Motor Generator Set (1 page(s), 6/30/2020)
- ML20268B150 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437657, Sheet 1, Rev. 23, Electrical Schematic Diagram Diesel Fuel Transfer Pumps (1 page(s), 6/30/2020)
- ML20268B012 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437679, Rev. 16, Sheet 1, Electrical Schematic Diagram Main Steam Isolation Valves. (1 page(s), 6/30/2020)
- ML20268B145 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441296, Sheet 1, Rev. 11, Electrical Schematic Diagram Main Steam Isolation Valves (1 page(s), 6/30/2020)
- ML20268B084 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437680, Rev. 14, Sheet 1, Electrical Schematic Diagram Sampling System Selenoid valves. (1 page(s), 6/30/2020)
- ML20268B165 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441329, Rev 8, Sheet 1, Electrical Schematic Diagram Sampling System Solenoid Valves (1 page(s), 6/30/2020)
- ML20268B078 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437681, Rev 19, Sheet 1, Electrical Schematic Diagram Component Cooling Water Solenoid Valves (1 page(s), 6/30/2020)
- ML20268B073 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441330, Rev. 15, Sheet 1, Electrical Schematic Diagram Component Cooling Water Solenoid Valves (1 page(s), 6/30/2020)
- ML20268B068 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437682, Rev. 25, Sheet 1, Electrical Schematic Diagram Chemical & Volume Control System Solenoid Valves. (1 page(s), 6/30/2020)
- ML20268B031 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437683, Rev. 24, Sheet 1, Electrical Schematic Diagram Chemical & Volume Control System Solenoid Valves. (1 page(s), 6/30/2020)
- ML20268B103 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441326, Sheet 1, Rev. 24, Electrical Schematic Diagram C.V.C.S. Soleniod Valves (1 page(s), 6/30/2020)
- ML20268B038 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441327, Rev. 14, Sheet 1, Electrical Schematic Diagram Solenoid Valves Chemical & Volume Control System (1 page(s), 6/30/2020)
- ML20268B023 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437684, Sheet 1, Rev. 16, Electrical Schematic Diagram Liquid Radwaste Solenoid Valves (1 page(s), 6/30/2020)
- ML20268B063 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441319, Rev. 10, Sheet 1, Electrical Schematic Diagram Liquid Radwaste Solenoid Valves (1 page(s), 6/30/2020)
- ML20268B155 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437685, Rev. 20, Sheet 1, Electrical Schematic Diagram Steam Generator Blow Down Solenoid Valves (1 page(s), 6/30/2020)
- ML20268B016 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441461, Sheet 1, Electrical Schematic Diagram Steam Generator Blowdown Solenoid Valves (1 page(s), 6/30/2020)
- ML20268B136 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437557-, Rev 39, Sheet 1, Electrical Schematic Diagram Generator Control (1 page(s), 6/30/2020)
- ML20268B025 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437558, Rev. 37, Sheet 1, Electrical Schematic Diagram Generator Control (1 page(s), 6/30/2020)
- ML20268B156 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441245, Rev. 29, Sheet 1, Electrical Schematic Diagram Generator Control. (1 page(s), 6/30/2020)
- ML20268B162 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441246, Rev. 23, Sheet 1, Electrical Schematic Diagram Generator Control (1 page(s), 6/30/2020)
- ML20268B048 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437701, Rev. 11, Sheet 1, Electrical Schematic Diagram Permissive & Bypass Lights. (1 page(s), 6/30/2020)
- ML20268B111 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441369, Rev. 7, Sheet 1, Electrical Schematic Diagram Permissive& Bypass Lights (1 page(s), 6/30/2020)
- ML20268A880 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 19406, Sheet 1, Rev. 4, Logic Diagram Auxiliary Salt Water Pumps (1 page(s), 6/30/2020)
- ML20268A624 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 19406, Sheet 1, Rev. 4, Logic Diagram Auxiliary Salt Water Pumps (1 page(s), 6/30/2020)
- ML20268B041 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 445650, Sheet 1, Rev. 7, Separation & Color Code Instrumentation & Control Engineered Safety Features (1 page(s), 6/30/2020)
- ML20268B066 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 445651, Rev 10, Sheet 1, Electrical Separation and Color Code Instrumentation and Control Engineered Safety Features (1 page(s), 6/30/2020)
- ML20268B106 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 442561, Rev. 7, Sheet 7, Electrical Separation And Color Code Instrumentation And Control Engineered Safety Features. (1 page(s), 6/30/2020)
- ML20268B108 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 57673, Sheet 1, Electrical Arrangement and Details Containment Electrical Penetration Pipe Sleeves (1 page(s), 6/30/2020)
- ML20268B138 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 501445, Sheet 1. (1 page(s), 6/30/2020)
- ML20268B014 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 500603, Rev 6, Sheet 1, Arrangment and Details Containment Electrical Penetration Pipe Sleeves (1 page(s), 6/30/2020)
- ML20268B167 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 500793, Rev. 14, Sheet 1, Cable Tray and Conduit Supports Containment Structure Liner. (1 page(s), 6/30/2020)
- ML20268A518 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 19407, Rev. 16, Sheet 1, Electrical Logic Diagram Containment Fan Coolers. (1 page(s), 6/30/2020)
- ML20268A918 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 102791, Rev. 16, Sheet 1, Electrical Logic Diagram Containment Fan Coolers. (1 page(s), 6/30/2020)
- ML20268A841 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 19408, Rev. 8, Sheet 1, Electrical Logic Diagram Component Cooling Water Pumps. (1 page(s), 6/30/2020)
- ML20268A810 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 102792, Rev. 5, Sheet 1, Electrical Logic Diagram Component Cooling Water Pumps. (1 page(s), 6/30/2020)
- ML20268A867 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 19409, Rev. 9, Sheet 1, Logic Diagram Auxiliary Feedwater Pumps. (1 page(s), 6/30/2020)
- ML20268A557 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 102800, Rev. 8, Sheet 1, Logic Diagram Auxiliary Feedwater Pumps. (1 page(s), 6/30/2020)
- ML20268A619 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 19410, Rev. 8, Sheet 1, Logic Diagram Residual Heat Removal Pumps. (1 page(s), 6/30/2020)
- ML20268A704 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 102793, Rev. 5, Sheet 1, Logic Diagram Residual Heat Removal Pumps. (1 page(s), 6/30/2020)
- ML20268B040 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437547, Rev. 49, Sheet 1, Electrical Single Line Meter And Relay Diagram 120V Instrument AC System. (1 page(s), 6/30/2020)
- ML20268B117 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 445290, Sheet 1, Rev. 19, Electrical Single Line Meter and Relay Diagram, 120V Instrument AC System (1 page(s), 6/30/2020)
- ML20268B134 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 445291, Rev. 28, Sheet 1, Electrical Single Line Meter 12V Instrument AC System (1 page(s), 6/30/2020)
- ML20268B094 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441241, Rev. 45, Sheet 1, Electrical Single Line Meter and Relay Diagram 120V Instrument AC System. (1 page(s), 6/30/2020)
- ML20268B018 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 445390, Sheet 1, Rev. 25, Electrical Single Line Meter and Relay Diagram, 120V Instrument AC System (1 page(s), 6/30/2020)
- ML20268A988 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 445391, Rev. 31, Sheet 1, Electrical Single Line Meter And Relay Diagram 120V Instrument AC System. (1 page(s), 6/30/2020)
- ML20268B045 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 504479, Sheet 1, Rev. 6, Main Control Room Control Console & Vertical Board CC-1, 2 & 3 VB 1-5 Location & Miscellaneous Structural Details (1 page(s), 6/30/2020)
- ML20268B050 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 480216, Sheet 1, Rev. 1, Electrical Hot Shutdown Panel Extension Board Indicators Arrangement (with Nameplate Engravings) HO3 (1 page(s), 6/30/2020)
- ML20268B135 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 480217, Rev. 1, Sheet 1, Electrical Hot Shutdown Panel Extension Board Switches (With Nameplate Engraving) H04. (1 page(s), 6/30/2020)
- ML20268B141 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 480237, Rev. 1, Sheet 1, I & C Arrangement Hot Shutdown Panel Extension Board Indicators (H03) and Switches (H04) with Nameplate Engravings. (1 page(s), 6/30/2020)
- ML20268B022 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 491716, Sheet 1, Rev. 5, I & C Hot Shutdown Panel Arrangement Drawing with Nameplate Engravings (1 page(s), 6/30/2020)
- ML20268A993 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 494122, Rev. 6, Sheet 1, I & C Hot Shutdown Panel Arrangement Drawing (With Nameplate Engravings.) (1 page(s), 6/30/2020)
- ML20268B059 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 330557, Sheet 1, I & C Auxiliary Building Control Panel Arrangement (1 page(s), 6/30/2020)
- ML20268B182 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495860-1 (1 page(s), 6/30/2020)
- ML20268B118 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495890 (1 page(s), 6/30/2020)
- ML20268B164 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495853, Sheet 1. (1 page(s), 6/30/2020)
- ML20268B159 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Drawing 495883 (1 page(s), 6/30/2020)
- ML20268B149 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 502110, Electrical Single Line Diagram 500/230/25/12/4.16KV System (1 page(s), 6/30/2020)
- ML20268B044 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 500804, Rev. 29, Sheet 1, Electrical Arrangement Standby Start-Up Transformers. (1 page(s), 6/30/2020)
- ML20268B152 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437529, Rev. 49, Sheet 1, Electrical Single Line Meter & Relay Diagram Generation Excitation Main & Auxiliary Transformers. (1 page(s), 6/30/2020)
- ML20268B176 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441226, Rev. 33, Sheet 1, Electrical Single Line Meter And Relay Diagram Generator Excitation Main And Auxiliary Transformers. (1 page(s), 6/30/2020)
- ML20268B019 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437626, Rev. 34, Sheet 1, Electrical Schematic Diagram 4160V Bus "G" Automatic Transfer. (1 page(s), 6/30/2020)
- ML20268B109 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441353-1, Rev. 30, Sheet 1, Electric Schematic Diagram 4160V Bus Section "G" Automatic Transfer. (1 page(s), 6/30/2020)
- ML20268B143 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437627, Rev. 38, Sheet 1, Electrical Schematic Diagram 4160V Bus Section H Automatic Transfer (1 page(s), 6/30/2020)
- ML20268A985 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441354, Rev. 33,Sheet 1, Electrical Schematic Diagram 4160 V Bus Section "H" Automatic Transfer. (1 page(s), 6/30/2020)
- ML20268B102 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437579, Rev. 45, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 11 & 12 (1 page(s), 6/30/2020)
- ML20268B083 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 496280, Rev. 4, Sheet 1, Electrical Schematic Diagram 4160V Diesel Generator Control No. 23. (1 page(s), 6/30/2020)
- ML20268B039 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 496281, Rev. 8, Sheet 1, Electrical Schematic Diagram 60V Diesel Generator Control No. 23 (1 page(s), 6/30/2020)
- ML20268B088 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437580-, Rev. 39, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 11 & 12 (1 page(s), 6/30/2020)
- ML20268B151 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437667, Rev. 46, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 13 (1 page(s), 6/30/2020)
- ML20268B054 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437668, Rev. 40, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 13 (1 page(s), 6/30/2020)
- ML20268B125 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441357, Rev. 43, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 21 & 22 (1 page(s), 6/30/2020)
- ML20268B071 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441358, Rev. 43, Sheet 1, Electrical Schematic Diagram Diesel Generator Control No. 21 & 22 (1 page(s), 6/30/2020)
- ML20268B062 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 496277, Rev. 7, Sheet 1, Electrical Schematic Diagram Diesel Generator Control No. 23 (1 page(s), 6/30/2020)
- ML20268B089 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 496278, Rev. 6, Sheet 1, Electrical Schematic Diagram 4160V Diesel Generator Control No. 23. (1 page(s), 6/30/2020)
- ML20268B131 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 496279, Rev. 9, Sheet 1, Electrical Schematic Diagram 4160V Diesel Generator Control No. 23. (1 page(s), 6/30/2020)
- ML20268B140 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437665, Rev. 36, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers (1 page(s), 6/30/2020)
- ML20268B027 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437676, Rev. 27, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers (1 page(s), 6/30/2020)
- ML20268A991 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437666, Rev. 31, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers (1 page(s), 6/30/2020)
- ML20268B153 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441355, Rev. 28, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers DG 21 & 22 (1 page(s), 6/30/2020)
- ML20268B020 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441356, Rev. 13, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers. (1 page(s), 6/30/2020)
- ML20268B099 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 496275, Rev. 11, Sheet 1, Electrical Schematic Diagram 4160V Diesel Generator Control No. 23 And Associated Circuit Breaker. (1 page(s), 6/30/2020)
- ML20268B144 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 496276-1, Rev. 7, Sheet 1, Electrical Schematic diagram 4160V Diesel Generator No. 23 And Associated Circuit Breaker. (1 page(s), 6/30/2020)
- ML20268B147 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437674, Rev. 31, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators Auxiliary Motors. (1 page(s), 6/30/2020)
- ML20268B075 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441359, Rev. 23, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators Auxiliary Motors (1 page(s), 6/30/2020)
- ML20268A995 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 496282, Rev. 13, Sheet 1, Electrical Schematic Diagram 4160V Diesel Generator No. 23 Auxiliary Motors. (1 page(s), 6/30/2020)
- ML20268B174 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 458863, Rev. 18, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section "F" Automatic Transfer (1 page(s), 6/30/2020)
- ML20268B007 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 458864, Rev. 18, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section "G" Automatic Transfer. (1 page(s), 6/30/2020)
- ML20268B047 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 458865, Rev. 15, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section "H" Automatic Transfer. (1 page(s), 6/30/2020)
- ML20268B009 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441286, Rev. 11, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section "F" Automatic Transfer. (1 page(s), 6/30/2020)
- ML20268B115 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441297, Rev. 14, Sheet 1, Electrical Logic Diagram 4160 Volt Bust Section "G" Automatic Transfer. (1 page(s), 6/30/2020)
- ML20268B024 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441337, Rev. 13, Sheet 1, Electrical Logic Diagram 4160V Bus Section "H" Automatic Transfer (1 page(s), 6/30/2020)
- ML20268B139 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437546, Rev. 50, Sheet 1, Electrical Single Line Meter And Relay Diagram 125 Volt DC Sytem. (1 page(s), 6/30/2020)
- ML20268B104 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 445076, Rev. 19, Sheet 1, Electrical Single Line Meter And Relay Diagram 125 Volt DC System. (1 page(s), 6/30/2020)
- ML20268B183 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 445075, Rev. 21, Sheet 1, Electrical Single Line Meter and Relay Diagram 125 Volt DC System (1 page(s), 6/30/2020)
- ML20268B126 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441240, Rev. 48, Sheet 1, Electrical Line Meter And Relay Diagram 125V D.C. System. (1 page(s), 6/30/2020)
- ML20268B095 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 455065, Rev. 12, Sheet 1, Electrical Single Line Meter And Relay Diagram 125V And 250V DC System. (1 page(s), 6/30/2020)
- ML20268B006 - Diablo Canyon Power Plant, Units 1 & 2 - Rev. 25 to Updated Final Safety Analysis Report, Drawing 445295, Rev. 1, Sheet 2. (1 page(s), 6/30/2020)
- ML20268B116 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437545 (1 page(s), 6/30/2020)
- ML20268A412 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 441218, Sheet 1. (1 page(s), 6/30/2020)
- ML20268B096 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437531, Rev. 28, Sheet 1, Electrical Single Line Meter And Relay Diagram 12KV System. (1 page(s), 6/30/2020)
- ML20268B098 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441227, Rev. 21, Sheet 1, Electrical Single Line Meter & Relay Diagram 12KV System Bus Section "D" & "E" (1 page(s), 6/30/2020)
- ML20268A393 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437614, Rev. 37, Sheet 1, Electrical Schematic Diagram Bus Potential & Synchronizing 4160V System. (1 page(s), 6/30/2020)
- ML20268A407 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441340, Rev 31, Sheet 1, Electrical Schematic Diagram Potential & Synchronizing Diagram (1 page(s), 6/30/2020)
- ML20268B036 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437532-, Rev. 29, Sheet 1, Electrical Single Line Meter & Relay Diagram 4160 Volt System (1 page(s), 6/30/2020)
- ML20268B142 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441228, Rev. 16, Sheet 1, Single Line Meters & Relay Diagram 4160 V System Bus Section "D" & "E" (1 page(s), 6/30/2020)
- ML20268B035 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437533, Rev. 46, Sheet 1, Electrical Single Line Diagram Single Line Meter & Relay Diagram 4160 Volt System (1 page(s), 6/30/2020)
- ML20268B065 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441229, Rev. 20, Sheet 1, Electrical Single Line Meter & Relay Diagram 4160 V System Bus Section "F" DG 23 (1 page(s), 6/30/2020)
- ML20268B180 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441230, Rev. 34, Sheet 1, Electrical Single Line Meter & Relay Diagram 4160V System Bus Section "G" & "H" DC 21 & 22. (1 page(s), 6/30/2020)
- ML20268B053 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437530, Rev. 40, Sheet 1, Electrical Single Line Meter & Relay Diagram 12KV Start-Up System (1 page(s), 6/30/2020)
- ML20268A994 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437916, Rev. 48, Sheet 1, Electrical Single Line Meter and Relay Diagram 480 Volt System Bus Section IF. (1 page(s), 6/30/2020)
- ML20268B158 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441237, Rev. 39, Sheet 1, Electrical Single Line Meter And Relay Diagram 480 Volt System Bus Section 2F. (1 page(s), 6/30/2020)
- ML20268B130 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437542, Rev. 57, Sheet 1, Electrical Single Line Meter And Relay Diagram 480 Volt System Bus Section 1G. (1 page(s), 6/30/2020)
- ML20268B168 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441238, Rev. 54, Sheet 1, Electrical Single Line Meter & Relay Diagram 480 V System Bus Section 2G. (1 page(s), 6/30/2020)
- ML20268B026 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437543, Rev. 52, Sheet 1, Electrical Single Line Meter & Relay Diagram 480V System Bus Section H. (1 page(s), 6/30/2020)
- ML20268B000 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441239, Rev. 48, Sheet 1, Electrical Single Line Meter & Relay Diagram 480 Volt System Bus Section 2H (1 page(s), 6/30/2020)
- ML20268B061 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 437625, Rev. 32, Rev. 1, Electrical Schematic Diagram 4160V Bus Section "F" Automatic Transfer (1 page(s), 6/30/2020)
- ML20268B067 - Diablo Canyon Power Plant, Unit 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Drawing 441352, Rev. 26, Sheet 1, Electrical Schematic Diagram 4160V Bus Section "F" Automatic Transfer. (1 page(s), 6/30/2020)
- ML20268A456 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Drawing 511157, Rev 0, Sheet 1, Mechanical Control Room Flow Diagram (1 page(s), 6/30/2020)
- ML20268A448 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Drawing 512904, Rev. 15, Sheet 1, Mechanical Air Conditioning Technical Support Center And Post-Accident Sampling System Air Flow Diagrams. (1 page(s), 6/30/2020)
- ML20268A430 - Diablo Canyon Power Plant, Unit 1 - Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Drawing 516111, Rev. 5, Sheet 1, Mechanical Plans, Sections and Details Area "L" & "GE" Elev. 140'-0. (1 page(s), 6/30/2020)
- ML20268A467 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Drawing 59316, Sheet 1, Mechanical Ventilation Flow Diagram Auxiliary Building Engineered Safety Equipment Area. (1 page(s), 6/30/2020)
- ML20268A401 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Drawing 501365, Sheet 1, Mechanical Ventilation Flow Diagram Auxiliary Building Engineered Safety Equipment Area. (1 page(s), 6/30/2020)
- ML20268A446 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Drawing 59317, Sheet 1, Mechanical Flow Diagram Containment Fuel Handling & Fan Rooms. (1 page(s), 6/30/2020)
- ML20268A397 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Drawing 501366, Sheet 1, Mechanical Ventilation Flow Diagram Containment Fuel Handling Fan Rooms (1 page(s), 6/30/2020)
- ML20268A420 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Drawing 516103, Rev. 16, Sheet 1, Mechanical Ventilation Flow Diagrams. (1 page(s), 6/30/2020)
- ML20268A373 - Diablo Canyon Power Plant, Units 1 & 2 - Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Drawing 438165, Rev. 14, Sheet 1, Civil Emergency Diesel Generator Fuel Oil System. (1 page(s), 6/30/2020)