Home > NRC Library > ADAMS Public Documents
Callaway Plant, Unit 1 - Final Safety Analysis Report Revision OL-24 and Technical Specification Bases Revision 15
Accession Number: ML20209A098
Date Released: Thursday, February 4, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19317E225 - Callaway Plant, Unit 1 - Final Safety Analysis Report Revision OL-24 and Technical Specification Bases Revision 15 (6 page(s), 11/13/2019)
- ML20209A029 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Table of Contents. (10 page(s), 11/13/2019)
- ML20209A037 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, List of Effective Sections. (5 page(s), 11/13/2019)
- ML20209A021 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, List of Effective Tables. (14 page(s), 11/13/2019)
- ML20209A022 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, List of Effective Figures. (29 page(s), 11/13/2019)
- ML20209A032 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant. (149 page(s), 11/13/2019)
- ML20209A040 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 2, Site Characteristics. (17 page(s), 11/13/2019)
- ML20209A023 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 2, Figures (10 page(s), 11/13/2019)
- ML20209A018 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems. (1087 page(s), 11/13/2019)
- ML20209A038 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 3, Figures. (403 page(s), 11/13/2019)
- ML20209A020 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 4, Reactor. (183 page(s), 11/13/2019)
- ML20209A025 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 4, Figures. (106 page(s), 11/13/2019)
- ML20209A047 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems. (206 page(s), 11/13/2019)
- ML20209A031 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 5, Figures. (39 page(s), 11/13/2019)
- ML20209A042 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (463 page(s), 11/13/2019)
- ML20209A028 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 6, Figures. (225 page(s), 11/13/2019)
- ML20209A027 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 7.0, Instrumentation and Controls (357 page(s), 11/13/2019)
- ML20209A048 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 7, Figures. (57 page(s), 11/13/2019)
- ML20209A013 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 8, Electric Power. (146 page(s), 11/13/2019)
- ML20209A026 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 8, Figures. (10 page(s), 11/13/2019)
- ML20209A015 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (657 page(s), 11/13/2019)
- ML20209A099 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 9, Figures. (188 page(s), 11/13/2019)
- ML20209A036 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 10, Stem and Power Conversion System. (145 page(s), 11/13/2019)
- ML20209A041 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 10, Figures. (64 page(s), 11/13/2019)
- ML20209A043 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (150 page(s), 11/13/2019)
- ML20209A016 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 11, Figures. (26 page(s), 11/13/2019)
- ML20209A011 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 12, Radiation Protection. (119 page(s), 11/13/2019)
- ML20209A024 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 12, Figures. (18 page(s), 11/13/2019)
- ML20209A039 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 13, Conduct of Operations. (2 page(s), 11/13/2019)
- ML20209A049 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 14, Initial Test Program. (4 page(s), 11/13/2019)
- ML20209A017 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 15, Accident Analysis. (381 page(s), 11/13/2019)
- ML20209A019 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 15, Figures (384 page(s), 11/13/2019)
- ML20209A030 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 16, Technical Requirements. (220 page(s), 11/13/2019)
- ML20209A045 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 16, Figures. (3 page(s), 11/13/2019)
- ML20209A014 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 17, Quality Assurance. (2 page(s), 11/13/2019)
- ML20209A033 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 18, Clarification of TMI Action Plan Requirements. (157 page(s), 11/13/2019)
- ML20209A046 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 18, Figures. (15 page(s), 11/13/2019)
- ML20209A044 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Chapter 19, License Renewal Supplement. (83 page(s), 11/13/2019)
- ML20209A079 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Change Notice Log. (25 page(s), 11/13/2019)
- ML20209A034 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Index to NRC Questions and Responses. (167 page(s), 11/13/2019)
- ML20209A012 - Callaway Plant, Unit 1, Rev. OL-24 to Final Safety Analysis Report, Index to NRC Questions and Reponses, Figures. (10 page(s), 11/13/2019)
- ML20209A105 - Callaway Plant, Unit 1, Operating License, Table of Contents. (1 page(s), 11/13/2019)
- ML20209A113 - Callaway Plant, Unit 1, Operating License re Renewed Facility Operating License (12 page(s), 11/13/2019)
- ML20209A117 - Callaway Plant, Unit 1, Operating License, Appendix B, Environmental Protection Plan. (9 page(s), 11/13/2019)
- ML20209A112 - Callaway Plant, Unit 1, Operating License Re Appendix C, Additional Conditions. (3 page(s), 11/13/2019)
- ML20209A148 - Callaway Plant, Unit 1, Operating License re NRC Order. (2 page(s), 11/13/2019)
- ML20209A139 - Callaway Plant, Unit 1, Operating License re Order Modifying Licenses (Effective Immediately), EA-02-026 (7 page(s), 11/13/2019)
- ML20209A134 - Callaway Plant, Unit 1, Operating License regarding Issuance of Order for Compensatory Measures Related to Access Authorization (8 page(s), 1/7/2003)
- ML20209A116 - Callaway Plant, Unit 1, Operating License regarding Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors (29 page(s), 11/13/2019)
- ML20209A125 - Callaway Plant, Unit 1, Operating License re EA-03-009 Errata, Issuance Of Errata To Order Establishing Interim Inspection Requirements For Reactor Pressure Vessel Heads At Pressurized Water Reactors (5 page(s), 11/13/2019)
- ML20209A141 - Callaway Plant, Unit 1, Operating License re Issuance of Order for Compensatory Measures related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel (19 page(s), 11/13/2019)
- ML20209A140 - Callaway Plant, Unit 1, Operating License Re EA-03-039,Issuance of Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel (11 page(s), 4/29/2003)
- ML20209A153 - Callaway Plant, Unit 1, Operating License re Issuance Of Order Requiring Compliance With Revised Design Basis Threat For Operating Power Reactors. (9 page(s), 11/13/2019)
- ML20209A131 - Callaway Plant, Unit 1, Operating License re EA-05-007, Issuance Of Order For Additional Security Measures On The Transportation Of Radioactive Material Quantities Of Concern (36 page(s), 11/13/2019)
- ML20209A142 - Callaway Plant, Unit 1, Operating License regarding Correction and Clarification of Order for Additional Security Measures on the Transportation of Radioactive Material Quantities of Concern, EA-05-007 (105 page(s), 8/16/2005)
- ML20209A135 - Callaway Plant, Unit 1, Operating License re EA-06-037, Issuance Of Order Requiring Compliance With Updated Adversary Characteristic (17 page(s), 11/13/2019)
- ML20209A143 - Callaway Plant, Unit 1, Operating License re EA-12-049, Issuance Of Order To Modify Licenses With Regard To Requirements For Mitigation Strategies For Beyond-Design-Basis External Events (37 page(s), 11/13/2019)
- ML20209A152 - Callaway Plant, Unit 1, Operating License re EA-12-051, Issuance Of Order To Modify Licenses With Regard To Reliable Spent Fuel Pool Instrumentation (40 page(s), 11/13/2019)
- ML20209A107 - Callaway Plant, Unit 1, Operating License re EA-13-237, Issuance Of Order For Implementation Of Additional Security Measures And Fingerprinting For Unescorted Access For Callaway Plant Independent Spent Fuel Storage Installation (23 page(s), 11/13/2019)
- ML20209A126 - Callaway Plant, Unit 1, Operating License Amendment Index. (61 page(s), 11/13/2019)
- ML20209A087 - Callaway Plant, Unit 1, Site Analysis, Table of Contents. (4 page(s), 11/13/2019)
- ML20209A080 - Callaway Plant, Unit 1, Site Analysis, List of Effective Sections. (3 page(s), 11/13/2019)
- ML20209A076 - Callaway Plant, Unit 1, Site Analysis, List of Effective Tables (5 page(s), 11/13/2019)
- ML20209A085 - Callaway Plant, Unit 1, Site Analysis, List of Effective Figures. (9 page(s), 11/13/2019)
- ML20209A086 - Callaway Plant, Unit 1, Site Analysis, Chapter 1.0, Introduction And General Description of Plant. (1 page(s), 11/13/2019)
- ML20209A091 - Callaway Plant, Unit 1, Site Analysis, Chapter 2.0, Site Characteristics (860 page(s), 11/13/2019)
- ML20209A078 - Callaway Plant, Unit 1, Site Analysis, Chapter 2, Figures. (383 page(s), 11/13/2019)
- ML20209A084 - Callaway Plant, Unit 1, Site Analysis, Chapter 3.0, Design Of Structures, Components, Equipment And Systems (61 page(s), 11/13/2019)
- ML20209A094 - Callaway Plant, Unit 1, Site Analysis, Chapter 3, Figures. (51 page(s), 11/13/2019)
- ML20209A088 - Callaway Plant, Unit 1, Site Analysis, Chapter 4, Reactor. (1 page(s), 11/13/2019)
- ML20209A089 - Callaway Plant, Unit 1, Site Analysis, Chapter 8, Electric Power (15 page(s), 11/13/2019)
- ML20209A075 - Callaway Plant, Unit 1, Site Analysis, Chapter 8, Figures. (14 page(s), 11/13/2019)
- ML20209A081 - Callaway Plant, Unit 1, Safety Analysis, Chapter 9, Auxiliary Systems. (42 page(s), 11/13/2019)
- ML20209A072 - Callaway Plant, Unit 1, Site Analysis, Chapter 9, Figures (12 page(s), 11/13/2019)
- ML20209A074 - Callaway Plant, Unit 1, Site Analysis, Chapter 10, Steam and Power Conversion System. (6 page(s), 11/13/2019)
- ML20209A095 - Callaway Plant, Unit 1, Site Analysis, Chapter 11, Radioactive Waste Management. (26 page(s), 11/13/2019)
- ML20209A077 - Callaway Plant, Unit 1, Site Analysis, Chapter 12.0, Radiation Protection. (24 page(s), 11/13/2019)
- ML20209A082 - Callaway Plant, Unit 1, Site Analysis, Chapter 12, Figure 12.5-1 (1 page(s), 11/13/2019)
- ML20209A073 - Callaway Plant, Unit 1, Site Analysis, Chapter 13, Conduct of Oprations. (65 page(s), 11/13/2019)
- ML20209A093 - Callaway Plant, Unit 1, Site Analysis, Chapter 13, Figures. (11 page(s), 11/13/2019)
- ML20209A096 - Callaway Plant, Unit 1, Site Analysis, Chapter 17, Quality Assurance (2 page(s), 11/13/2019)
- ML20209A083 - Callaway Plant, Unit 1, Safety Analysis, Chapter 18, Response to NUREG-0737, "Clarification of TMI Action Plan Requirements." (1 page(s), 11/13/2019)
- ML20209A092 - Callaway Plant, Unit 1, Site Analysis, Chapter 2, Figures. (66 page(s), 11/13/2019)
- ML20209A123 - Callaway Plant, Unit 1, Technical Specifications, Table of Contents. (4 page(s), 11/13/2019)
- ML20209A111 - Callaway Plant, Unit 1, Technical Specifications, Chapter 1, Use and Application (30 page(s), 11/13/2019)
- ML20209A127 - Callaway Plant, Unit 1, Technical Specifications Chapter 2.0, Safety Limits. (2 page(s), 11/13/2019)
- ML20209A124 - Callaway Plant, Unit 1, Technical Specifications, chapter 3.0, Limiting Condition for Operation (LCO) And Surveillance Requirements (SR) Applicability. (6 page(s), 11/13/2019)
- ML20209A145 - Callaway Plant, Unit 1, Technical Specifications, Chapter 3.1, Reactivity Control Systems. (26 page(s), 11/13/2019)
- ML20209A115 - Callaway Plant, Unit 1, Technical Specifications, Chapter 3.2, Power Distribution Limits. (14 page(s), 11/13/2019)
- ML20209A144 - Callaway Plant, Unit 1, Technical Specifications, Chapter 3.3, Instrumentation. (86 page(s), 11/13/2019)
- ML20209A104 - Callaway Plant, Unit 1, Technical Specifications, Chapter 3.4, Reactor Coolant System. (50 page(s), 11/13/2019)
- ML20209A146 - Callaway Plant, Unit 1, Technical Specifications, Chapter 3.5, Emergency Core Cooling Systems (ECCS) (14 page(s), 11/13/2019)
- ML20209A147 - Callaway Plant, Unit 1, Technical Specification, Chapter 3.6, Containment Systems. (25 page(s), 11/13/2019)
- ML20209A132 - Callaway Plant, Unit 1, Technical Specifications, Chapter 3.7, Plant Systems. (54 page(s), 11/13/2019)
- ML20209A130 - Callaway Plant, Unit 1, Technical Specifications, Chapter 3.8, Electrical Power Systems. (44 page(s), 11/13/2019)
- ML20209A149 - Callaway Plant, Unit 1, Technical Specifications, Chapter 3.9, Refueling Operations (15 page(s), 11/13/2019)
- ML20209A119 - Callaway Plant, Unit 1, Technical Specifications, Chapter 4.0, Design Features. (4 page(s), 11/13/2019)
- ML20209A122 - Callaway Plant, Unit 1, Technical Specifications, Chapter 5.0, Administrative Controls. (33 page(s), 11/13/2019)
- ML20209A114 - Callaway Plant, Unit 1, Technical Specifications, List of Effective Pages (6 page(s), 11/13/2019)
- ML20209A110 - Callaway Plant, Unit 1, Technical Specifications Bases, Table of Contents. (4 page(s), 11/13/2019)
- ML20209A121 - Callaway Plant, Unit 1, Technical Specifications Base, Chapter B 2.0, Safety Limits (SLs).. (8 page(s), 11/13/2019)
- ML20209A150 - Callaway Plant, Unit 1, Technical Specifications Base, Chapter B 3.0, Safety Limits (SLs). (17 page(s), 11/13/2019)
- ML20209A120 - Callaway Plant, Unit 1, Technical Specifications Base, Chapter B 3.1, Reactivity Controls Systems. (60 page(s), 11/13/2019)
- ML20209A138 - Callaway Plant, Unit 1, Technical Specification Bases, Chapter B 3.2, Power Distribution Limits (30 page(s), 11/13/2019)
- ML20209A128 - Callaway Plant, Unit 1, Technical Specifications Base, Chapter B 3.3, Instrumentation. (215 page(s), 11/13/2019)
- ML20209A108 - Callaway Plant, Unit 1, Technical Specifications Bases, Chapter B 3.4, Reactor Coolant System. (113 page(s), 11/13/2019)
- ML20209A118 - Callaway Plant, Unit 1, Technical Specifications Bases, Chapter B 3.5, Emergency Core Cooling Systems (ECCS). (40 page(s), 11/13/2019)
- ML20209A136 - Callaway Plant, Unit 1, Technical Specifications Bases, Chapter B 3.6, Containment Systems (50 page(s), 11/13/2019)
- ML20209A154 - Callaway Plant, Unit 1, Technical Specifications Bases, Chapter B 3.7, Plant Systems. (122 page(s), 11/13/2019)
- ML20209A133 - Callaway Plant, Unit 1, Technical Specifications Bases, Chapter B 3.8, Electrical Power Systems. (98 page(s), 11/13/2019)
- ML20209A109 - Callaway Plant, Unit 1, Technical Specifications Bases, Chapter B 3.9, Refueling Operations. (38 page(s), 11/13/2019)
- ML20209A090 - Callaway Plant, Unit 1, Technical Specifications Bases Implemented Change Notice Log. (8 page(s), 11/13/2019)
- ML20209A129 - Callaway Plant, Unit 1, Technical Specifications Bases, List of Effective Sections. (2 page(s), 11/13/2019)
- ML20317A257 - Callaway Plant, Unit 1 - Rev. OL-24 to Final Safety Analysis Report, Chapter 1, Figures - Redacted (52 page(s), 11/12/2020)