Forwards procedure manuals re Comanche Peak Review Team checklists,per util 860609 ltr.Forthcoming revs will be sent periodically.Related documentation encl.
Accession Number: ML20202J051
Date Released: Tuesday, August 4, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20202J039 - Forwards procedure manuals re Comanche Peak Review Team checklists,per util 860609 ltr.Forthcoming revs will be sent periodically.Related documentation encl. (1500 page(s), 7/11/1986)
- ML20203A499 - Change Notice 002 to Rev 2 to Quality Instruction QI-023, "Reinsp of HVAC Equipment Installation." (2 page(s), 5/13/1986)
- ML20203A204 - Rev 1 to Quality Instruction QI-011, "Documentation Review for Electrical Equipment/R-E-EEIN." (5 page(s), 3/7/1986)
- ML20203A459 - Change Notice 001 to Rev 4 to Quality Instruction QI-015, "Documentation Review of Cables/R-E-CABL." (3 page(s), 4/9/1986)
- ML20203A229 - Change Notice 001 to Rev 0 to Procedure CPP-022, "Supplementary Evaluation of Visual Welding Insp Techniques." (2 page(s), 5/21/1986)
- ML20202J623 - Rev 1 to Quality Instruction QI-041, "Reinsp of Field Fabricated Tanks." (20 page(s), 1/29/1986)
- ML20202J356 - Addendum 1 to Rev 2 to DAP-19, "Processing & Review of Info Between Quality of Const,QA/QC Adequacy Program & Design Adequacy Program." (2 page(s), 4/11/1986)
- ML20202J440 - Rev 2 to Quality Instruction QI-046, "Documentation Review of Structural Steel." (20 page(s), 6/27/1986)
- ML20203A069 - Rev 1 to Quality Instruction QI-072, "Documentation Review of Lighting Cables/R-E-LITG." (5 page(s), 1/28/1986)
- ML20202J558 - Change Notice 001 to Rev 7 to Procedure CPP-010, "Preparation of Deviation Repts." (2 page(s), 5/15/1986)
- ML20203A080 - Change Notice 001 to Rev 4 to Quality Instruction QI-008, "Reinsp of Conduit/I-E-CDUT." (2 page(s), 3/27/1986)
- ML20203A357 - Rev 0 to Procedure CPP-024, "Issue-Specific Action Plan Revs." (4 page(s), 3/18/1986)
- ML20202J585 - Rev 7 to Procedure CPP-010, "Preparation of Deviation Repts." (15 page(s), 5/12/1986)
- ML20202J662 - Rev 1 to Procedure CPP-013, "Collective Evaluation of Quality of Const." (10 page(s), 1/22/1986)
- ML20203A087 - Rev 1 to Quality Instruction QI-054, "Documentation Review of Category I Conduit Supports/R-S-COSP." (12 page(s), 2/27/1986)
- ML20203A106 - Rev 1 to Procedure CPP-020, "Out-of-Scope Observations." (4 page(s), 9/23/1985)
- ML20202J822 - Rev 2 to Quality Instruction QI-044, "Documentation Review of Concrete Placement." (20 page(s), 4/1/1986)
- ML20202J199 - Rev 2 to Quality Instruction QI-060, "Documentation Review of Mechanical Equipment Installation." (16 page(s), 6/17/1986)
- ML20202J424 - Change Notice 001 to Rev 2 to Procedure CPP-007, "Preparation of Checklists & Data Base Repts." (2 page(s), 2/21/1986)
- ML20202J060 - Rev 1 to "Design Adequacy Program,QA Program." (25 page(s), 3/22/1986)
- ML20202J592 - Rev 2 to Quality Instruction QI-068, "Documentation Review of Cement Grout." (6 page(s), 4/14/1986)
- ML20202J109 - Addendum 1 to Rev 3 to DAP-4, "Preparation of Checklists." (2 page(s), 2/3/1986)
- ML20202J294 - Rev 0 to Quality Instruction QI-062, "Insp of Nonpressure Boundary Welds for Supplementary Evaluation of Visual Welding Insp Techniques." (25 page(s), 10/25/1985)
- ML20203A492 - Change Notice 001 to Rev 3 to Quality Instruction QI-016, "Reinsp of Cable Trays/I-E-CATY." (2 page(s), 4/7/1986)
- ML20202J331 - Rev 2 to DAP-16, "Audits." (13 page(s), 6/30/1986)
- ML20202J499 - Rev 2 to Quality Instruction QI-047, "Reinsp of Small Bore Pipe Welds/Matl." (17 page(s), 3/18/1986)
- ML20202J464 - Rev 2 to Quality Instruction QI-034, "Documentation Review of Fuel Bldg Fuel Pool Liners." (17 page(s), 6/27/1986)
- ML20202J793 - Rev 1 to Quality Instruction QI-069, "Documentation Review of Epoxy Grout." (5 page(s), 1/29/1986)
- ML20202J615 - Rev 0 to Procedure CPP-011, "Evaluations of Adverse Trend Analyses,Safety Significant Deficiencies & QA/QC Program Deficiencies." (14 page(s), 10/11/1985)
- ML20202J492 - Rev 1 to Quality Instruction QI-035, "Reinsp of HVAC Duct Supports." (48 page(s), 3/19/1986)
- ML20202J349 - Rev 2 to Procedure CPP-005, "Establishing Populations." (14 page(s), 2/18/1986)
- ML20203A019 - Rev 2 to Quality Instruction QI-006, "Reinsp of Type 2 Skewed Welds." (14 page(s), 9/28/1985)
- ML20203A376 - Rev 0 to Procedure CPP-025, "QC Inspector Qualification Evaluation." (5 page(s), 3/31/1986)
- ML20202J848 - Change Notice 001 to Rev 1 to Quality Instruction QI-053, "Reinsp of Category I Conduit Supports/I-S-COSP." (2 page(s), 6/11/1986)
- ML20202J143 - Change Notice 001 to Rev 2 to Procedure CPP-001, "Preparation of Project Procedures & Quality Instructions." (2 page(s), 2/11/1986)
- ML20203A148 - Rev 0 to Procedure CPP-021, "Comanche Peak Steam Electric Station Project Corrective Action." (11 page(s), 1/30/1986)
- ML20203A559 - Rev 2 to Quality Instruction QI-026, "Reinsp of Small Bore Piping Configuration." (21 page(s), 4/21/1986)
- ML20202J528 - Rev 4 to Procedure CPP-009, "Performance of Reinsps & Documentation Reviews." (9 page(s), 1/17/1986)
- ML20202J676 - Rev 2 to Procedure CPP-014, "Collective Evaluation of Const QA/QC Program." (15 page(s), 12/19/1985)
- ML20202J517 - Rev 1 to Quality Instruction QI-066, "Reinsp of Equipment Supports." (33 page(s), 2/11/1986)
- ML20203A053 - Rev 3 to Quality Instruction QI-027, "Reinsp of Large Bore Pipe Supports - Rigid." (116 page(s), 6/27/1986)
- ML20203A221 - Change Notice 001 to Rev 1 to Quality Instruction QI-012, "Reinsp of Instrumentation Equipment/I-E-ININ." (2 page(s), 2/25/1986)
- ML20202J711 - Rev 0 to Quality Instruction QI-050, "Reinsp of Pipe Welds/ Matl." (3 page(s), 3/18/1986)
- ML20202J761 - Rev 4 to Quality Instruction QI-002, "Comanche Peak Response Team Action Item I.a.2,Insp Rept on Butt Splices & Comanche Peak Response Team Action Item I.a.3,Butt Splice Qualifications." (9 page(s), 2/5/1985)
- ML20202J402 - Rev 2 to DAP-20, "DAP Overview of Activities Performed by Comanche Peak Steam Electric Station Project or Other External Organizations." (21 page(s), 4/11/1986)
- ML20203A292 - Change Notice 001 to Rev 0 to Procedure CPP-024, "Issue-Specific Action Plan Revs." (2 page(s), 4/4/1986)
- ML20203A061 - Change Notice 001 to Rev 1 to Procedure CPP-020, "Out-of-Scope Observations." (2 page(s), 4/10/1986)
- ML20202J535 - Change Notice 002 to Rev 1 to Quality Instruction QI-048, "Documentation Review of Tubing Welds/Matl." (3 page(s), 6/6/1986)
- ML20202J444 - Rev 0 to DAP-21, "Homogeneous Design Activity Validation & Selection of Specific Items for Review." (30 page(s), 12/9/1985)
- ML20203A525 - Rev 2 to Quality Instruction QI-023, "Reinsp of HVAC Equipment Installation." (18 page(s), 2/24/1986)
- ML20203A257 - Rev 1 to Quality Instruction QI-012, "Reinsp of Instrumentation Equipment/I-E-ININ." (11 page(s), 1/30/1986)
- ML20203A122 - Change Notice 001 to Rev 0 to Quality Instruction QI-073, "Documentation Review of Pipe Welds/Matl." (2 page(s), 5/22/1986)
- ML20202J812 - Rev 1 to Quality Instruction QI-052, "Documentation Review of Pipe Whip Restraints." (24 page(s), 2/20/1986)
- ML20202J169 - Addendum 1 to Rev 0 to DAP-7, "Trending & Generic Implications Evaluations." (2 page(s), 5/20/1986)
- ML20202J387 - Change Notice 001 to Rev 1 to Quality Instruction QI-033, "Reinsp of Fuel Pool Bldg Pool Liner." (2 page(s), 4/7/1986)
- ML20203A418 - Change Notice 003 to Rev 4 to Quality Instruction QI-015, "Documentation Review of Cables/R-E-CABL." (3 page(s), 5/6/1986)
- ML20203A008 - Rev 1 to Quality Instruction QI-053, "Reinsp of Category I Conduit Supports/I-S-COSP." (106 page(s), 2/26/1986)
- ML20202J255 - Change Notice 002 to Rev 3 to Procedure CPP-003, "Indoctrination,Training & Certification of Personnel." (3 page(s), 4/17/1986)
- ML20202J419 - Addendum 1 to Rev 0 to DAP-21, "Homogeneous Design Activity Validation & Selection of Specific Items for Review." (1 page(s), 1/29/1986)
- ML20202J693 - Change Notice 001 to Rev 2 to Quality Instruction QI-043, "Reinsp of Concrete Placement." (2 page(s), 5/21/1986)
- ML20203A195 - Rev 0 to Quality Instruction QI-073, "Documentation Review of Pipe Welds/Matl." (21 page(s), 5/16/1986)
- ML20202J211 - Rev 0 to DAP-9, "Preparation & Approval of Discipline Specific Results Repts & DAP Collective Evaluation Rept." (17 page(s), 10/4/1985)
- ML20202J604 - Rev 1 to Quality Instruction QI-048, "Documentation Review of Tubing Welds/Matl." (15 page(s), 5/9/1986)
- ML20203A134 - Rev 2 to Quality Instruction QI-055, "Reinsp of Instrument Pipe/Tube Supports/I-S-INSP." (39 page(s), 2/27/1986)
- ML20202J364 - Rev 2 to Quality Instruction QI-032, "Documentation Review of Containment Liner & Tank Stainless Steel Liners." (35 page(s), 6/27/1986)
- ML20202J782 - Change Notice 001 to Rev 1 to Quality Instruction QI-052, "Documentation Review of Pipe Whip Restraints." (2 page(s), 6/3/1986)
- ML20202J086 - Rev 0 to DAP-3, "Development & Validation of Self-Initiated Review Scope." (10 page(s), 9/9/1985)
- ML20203A593 - Change Notice 001 to Rev 0 to Quality Instruction QI-018, "Reinsp of Previously Disassembled Valves." (3 page(s), 9/19/1985)
- ML20202J826 - Rev 4 to Quality Instruction QI-004, "Comanche Peak Response Team Action Item I.b.1 - Flexible Conduit to Flexible Conduit Separation & Comanche Peak Response Team Action Item I.b.2 - Flexible Conduit...." (12 page(s), 3/12/1985)
- ML20203A262 - Rev 0 to Procedure CPP-023, "Category I Programmatic Issue-Specific Action Plan Instructions/Checklists." (4 page(s), 1/30/1986)
- ML20202J149 - Rev 2 to DAP-6, "Review of Drawings,Specs & Other Design Output Documents." (10 page(s), 6/23/1986)
- ML20202J507 - Rev 2 to Procedure CPP-008, "Preparation of Verification Packages." (11 page(s), 1/7/1986)
- ML20202J218 - Change Notice 003 to Rev 3 to Procedure CPP-003, "Indoctrination,Training & Certification of Personnel." (2 page(s), 6/25/1986)
- ML20202J777 - Change Notice 001 to Rev 2 to Quality Instruction QI-044, "Documentation Review of Concrete Placement." (4 page(s), 6/6/1986)
- ML20203A369 - Change Notice 002 to Rev 1 to Quality Instruction QI-014, "Reinsp of Cables/I-E-CABL." (2 page(s), 4/9/1986)
- ML20203A517 - Rev 3 to Quality Instruction QI-016, "Reinsp of Cable Trays/I-E-CATY." (20 page(s), 4/3/1986)
- ML20202J103 - Rev 2 to Procedure CPP-001, "Preparations of Project Procedures & Quality Instructions." (14 page(s), 1/7/1986)
- ML20202J236 - Rev 1 to DAP-11, "Document Control." (9 page(s), 10/29/1985)
- ML20202J306 - Addendum 1 to Rev 1 to DAP-15, "Training & Qualifications." (1 page(s), 4/21/1986)
- ML20202J179 - Rev 0 to DAP-7, "Trending & Generic Implications Evaluations." (70 page(s), 5/5/1986)
- ML20203A045 - Change Notice 001 to Rev 1 to Quality Instruction QI-054, "Documentation Review of Category I Conduit Supports/R-S-COSP." (2 page(s), 6/27/1986)
- ML20203A409 - Rev 1 to Quality Instruction QI-014, "Reinsp of Cables/ I-E-CABL." (43 page(s), 2/19/1986)
- ML20202J667 - Rev 1 to Quality Instruction QI-042, "Documentation Review of Field Fabricated Tanks." (27 page(s), 1/30/1986)
- ML20203A399 - Change Notice 001 to Rev 1 to Quality Instruction QI-014, "Reinsp of Cables/I-E-CABL." (2 page(s), 3/12/1986)
- ML20203A216 - Rev 1 to Quality Instruction QI-056, "Documentation Review of Instrument Pipe/Tube Supports/R-S-INSP." (10 page(s), 2/27/1986)
- ML20202J483 - Change Notice 001 to Rev 2 to Quality Instruction QI-047, "Reinsp of Small Bore Pipe Welds/Matl." (2 page(s), 4/3/1986)
- ML20203A475 - Rev 4 to Quality Instruction QI-015, "Documentation Review of Cables/R-E-CABL." (7 page(s), 2/12/1986)
- ML20203A509 - Change Notice 001 to Rev 2 to Quality Instruction QI-023, "Reinsp of HVAC Equipment Installation." (2 page(s), 3/6/1986)
- ML20202J786 - Rev 0 to Quality Instruction QI-003, "Procedure for Class 1E Heat Shrinkable Cable Insulation Sleeves - Comanche Peak Response Team Action Item I.a.1." (9 page(s), 1/15/1985)
- ML20202J135 - Rev 2 to Quality Instruction QI-058, "Reinsp of Pipe Supports,Technical Review Team Issues - 42 Pipe Supports." (94 page(s), 6/27/1986)
- ML20202J407 - Rev 3 to Quality Instruction QI-045, "Reinsp of Structural Steel." (47 page(s), 6/27/1986)
- ML20202J316 - Rev 1 to DAP-15, "Training & Qualifications." (21 page(s), 2/28/1986)
- ML20202J512 - Rev 1 to Quality Instruction QI-036, "Documentation Review of HVAC Duct Supports." (22 page(s), 3/10/1986)
- ML20203A328 - Rev 5 to Quality Instruction QI-013, "Documentation Review for Instrumentation Equipment/R-E-ININ." (5 page(s), 2/4/1986)
- ML20202J567 - Rev 1 to Quality Instruction QI-039, "Reinsp of HVAC Ducts & Plenums." (77 page(s), 2/20/1986)
- ML20202J224 - Rev 3 to DAP-10, "Development & Use of Procedures & Discipline Instructions." (23 page(s), 6/16/1986)
- ML20203A241 - Rev 2 to Quality Instruction QI-031, "Reinsp of Containment Liner & Tank Stainless Steel Liner." (7 page(s), 2/21/1986)
- ML20202J741 - Rev 2 to Quality Instruction QI-051, "Reinsp of Pipe Whip Restraints." (50 page(s), 6/27/1986)
- ML20202J428 - Rev 1 to Quality Instruction QI-033, "Reinsp of Fuel Bldg Fuel Pool Liners." (4 page(s), 3/7/1986)
- ML20203A234 - Rev 0 to Quality Instruction QI-074, "Documentation Review of Nuclear Instrumentation Sys Cable Terminations/R-E-NIST." (5 page(s), 3/10/1986)
- ML20202J734 - Rev 1 to Procedure CPP-017, "Preparation of QA/QC Program Deviation Repts." (9 page(s), 5/2/1986)
- ML20202J688 - Rev 0 to Procedure CPP-015, "Special Evaluation Team (SET)." (9 page(s), 7/22/1985)
- ML20202J323 - Rev 2 to Procedure CPP-004, "Project Working Files." (11 page(s), 12/17/1985)
- ML20203A173 - Change Notice 001 to Rev 1 to Quality Instruction QI-056, "Documentation Review of Instrument Pipe/Tube Supports/ R-S-INSP." (2 page(s), 6/27/1986)
- ML20203A309 - Change Notice 002 to Rev 5 to Quality Instruction QI-013, "Documentation Review for Instrumentation Equipment/ R-E-ININ." (2 page(s), 6/26/1986)
- ML20202J768 - Rev 1 to Procedure CPP-018, "QA/QC Interface W/Design Adequacy Program." (6 page(s), 1/29/1986)
- ML20202J372 - Rev 3 to Procedure CPP-005, "Establishing Populations." (16 page(s), 5/28/1986)
- ML20203A414 - Change Notice 002 to Rev 2 to Quality Instruction QI-021, "Reinsp of Piping Sys Bolted Joint/Matls." (3 page(s), 5/15/1986)
- ML20203A424 - Change Notice 001 to Rev 2 to Quality Instruction QI-021, "Reinsp of Piping Sys Bolted Joint/Matls." (3 page(s), 5/8/1986)
- ML20202J176 - Rev 3 to Quality Instruction QI-059, "Reinsp of Mechanical Equipment Installation." (21 page(s), 6/13/1986)
- ML20203A452 - Rev 2 to Quality Instruction QI-021, "Reinsp of Piping Sys Bolted Joint/Matls." (20 page(s), 2/5/1986)
- ML20202J250 - Rev 2 to DAP-12, "DAP Interfaces & Communications." (14 page(s), 6/16/1986)
- ML20202J563 - Change Notice 001 to Rev 1 to Quality Instruction QI-048, "Documentation Review of Tubing Welds/Matl." (6 page(s), 5/22/1986)
- ML20203A268 - Rev 0 to Quality Instruction QI-075, "Reinsp of Piping Bend Fabrication." (9 page(s), 5/2/1986)
- ML20202J393 - Rev 2 to Procedure CPP-006, "Sample Selection." (10 page(s), 1/30/1986)
- ML20202J383 - Rev 1 to Quality Instruction QI-063, "Reinsp of Torque for Drilled-In Concrete Expansion Anchors (Hilti Bolts)." (9 page(s), 1/30/1986)
- ML20203A390 - Rev 1 to Quality Instruction QI-020, "Documentation Review of Small Bore Pipe Supports." (18 page(s), 3/3/1986)
- ML20203A029 - Notice of cancellation of Rev 1 to Procedure CPP-019, "Cluster Sampling for Issue-Specific Action Plan VII.b.1." (1 page(s), 5/16/1986)
- ML20202J132 - Rev 2 to DAP-5, "Review of Calculations,Evaluations & Other Implementing Documents." (10 page(s), 6/23/1986)
- ML20202J636 - Rev 1 to Procedure CPP-012, "QA/QC Interface w/Constructor/ Texas Utils Generating Co." (14 page(s), 3/11/1986)
- ML20202J647 - Change Notice 001 to Rev 1 to Quality Instruction QI-042, "Documentation Review of Field Fabricated Tanks." (2 page(s), 6/12/1986)
- ML20202J474 - Change Notice 001 to Rev 1 to Quality Instruction QI-066, "Reinsp of Equipment Supports." (4 page(s), 2/12/1986)
- ML20203A537 - Rev 3 to Quality Instruction QI-025, "Reinsp of Large Bore Piping Configuration." (21 page(s), 4/22/1986)
- ML20203A469 - Rev 1 to Quality Instruction QI-022, "Documentation Review of Piping Sys Bolted Joints/Matls." (9 page(s), 2/5/1986)
- ML20202J540 - Rev 1 to Quality Instruction QI-037, "Reinsp of Pipe Supports,Technical Review Team Issues - Pipe Supports in Room 77N,Safeguards Bldg,Unit 1." (15 page(s), 3/21/1986)
- ML20202J729 - Rev 3 to Quality Instruction QI-001, "Procedure for Class 1E Cable Terminations Insp - Comanche Peak Response Team Action Item I.a.4." (5 page(s), 12/28/1984)
- ML20202J434 - Change Notice 002 to Rev 1 to Quality Instruction QI-066, "Reinsp of Equipment Supports." (2 page(s), 4/3/1986)
- ML20202J457 - Rev 0 to DAP-22, "Preparation of Safety Significance Evaluations." Related documentation encl. (21 page(s), 3/26/1986)
- ML20202J097 - Rev 6 to Quality Instruction QI-057, "Documentation Review of Fill & Backfill Placement." (21 page(s), 6/27/1986)
- ML20203A574 - Change Notice 002 to Rev 0 to Quality Instruction QI-018, "Reinsp of Previously Disassembled Valves." (2 page(s), 3/21/1986)
- ML20202J339 - Change Notice 001 to Rev 1 to Quality Instruction QI-063, "Reinsp of Torque for Drilled-In Concrete Expansion Anchors (Hilti Bolts)." (2 page(s), 2/10/1986)
- ML20203A360 - Rev 4 to Quality Instruction QI-019, "Reinsp of Small Bore Pipe Supports." (148 page(s), 6/27/1986)
- ML20202J670 - Change Notice 002 to Rev 1 to Quality Instruction QI-069, "Documentation Review of Epoxy Grout." (2 page(s), 3/18/1986)
- ML20203A128 - Rev 2 to Quality Instruction QI-009, "Document Review of Conduit/R-E-CDUT." (5 page(s), 2/24/1986)
- ML20203A439 - Change Notice 002 to Rev 4 to Quality Instruction QI-015, "Documentation Review of Cables/R-E-CABL." (3 page(s), 5/2/1986)
- ML20202J724 - Rev 2 to Quality Instruction QI-043, "Reinsp of Concrete Placement." (11 page(s), 2/20/1986)
- ML20202J377 - Rev 2 to DAP-19, "Processing & Review of Info Between Quality of Const,QA/QC Adequacy Program & Design Adequacy Program." (31 page(s), 1/15/1986)
- ML20202J162 - Rev 1 to Procedure CPP-002, "Correspondence Control." (6 page(s), 1/7/1986)
- ML20202J066 - Rev 3 to DAP-1, "Preparation & Review of Criteria Lists." (18 page(s), 6/19/1986)
- ML20203A096 - Rev 4 to Quality Instruction QI-008, "Reinsp of Conduit/ I-E-CDUT." (22 page(s), 3/18/1986)
- ML20202J719 - Change Notice 001 to Rev 1 to Quality Instruction QI-069, "Documentation Review of Epoxy Grout." (2 page(s), 2/24/1986)
- ML20202J344 - Rev 1 to DAP-17, "Corrective Actions." (15 page(s), 1/27/1986)
- ML20202J628 - Change Notice 003 to Rev 1 to Quality Instruction QI-069, "Documentation Review of Epoxy Grout." (2 page(s), 4/14/1986)
- ML20202J286 - Change Notice 001 to Rev 3 to Procedure CPP-003, "Indoctrination,Training & Certification of Personnel." (2 page(s), 3/24/1986)
- ML20202J118 - Rev 3 to DAP-4, "Preparation of Checklists." (24 page(s), 1/15/1986)
- ML20202J301 - Rev 1 to DAP-14, "Design Adequacy Program Records." (16 page(s), 6/16/1986)
- ML20203A545 - Change Notice 001 to Rev 1 to Quality Instruction QI-017, "Documentation Review of Cable Tray/R-E-CATY." (2 page(s), 2/19/1986)
- ML20203A280 - Change Notice 001 to Rev 5 to Quality Instruction QI-013, "Documentation Review for Instrumentation Equipment/ R-E-ININ." (3 page(s), 6/4/1986)
- ML20202J469 - Rev 2 to Procedure CPP-007, "Preparation of Checklists & Data Base Repts." (11 page(s), 1/7/1986)
- ML20203A025 - Rev 1 to Quality Instruction QI-071, "Reinsp of Lighting Cable/I-E-LITG." (9 page(s), 1/28/1986)
- ML20202J550 - Rev 1 to Quality Instruction QI-067, "Documentation Review of Equipment Supports." (12 page(s), 4/30/1986)
- ML20202J841 - Rev 2 to Quality Instruction QI-070, "Reinsp of Tubing Welds/Matl." (11 page(s), 3/19/1986)
- ML20202J193 - Rev 2 to DAP-8, "Preparation of Engineering Evaluations." (17 page(s), 3/18/1986)
- ML20203A342 - Change Notice 003 to Rev 1 to Quality Instruction QI-014, "Reinsp of Cables/I-E-CABL." (6 page(s), 4/18/1986)
- ML20203A209 - Change Notice 001 to Rev 2 to Quality Instruction QI-031, "Reinsp of Containment Liner & Tank Stainless Steel Liner." (3 page(s), 4/24/1986)
- ML20202J487 - Change Notice 001 to Rev 2 to Procedure CPP-008, "Preparation of Verification Packages." (2 page(s), 6/30/1986)
- ML20203A005 - Rev 3 to Quality Instruction QI-005, "Evaluation of Inspector Performance." (7 page(s), 4/23/1986)
- ML20202J749 - Change Notice 002 to Rev 2 to Quality Instruction QI-044, "Documentation Review of Concrete Placement." (2 page(s), 6/26/1986)
- ML20203A093 - Rev 1 to Quality Instruction QI-028, "Documentation Review of Large Bore Pipe Supports - Rigid." (19 page(s), 3/6/1986)
- ML20203A564 - Rev 1 to Quality Instruction QI-017, "Documentation Review of Cable Tray/R-E-CATY." (6 page(s), 2/12/1986)
- ML20202J073 - Rev 3 to DAP-2, "Documentation & Tracking of Issues & Discrepancies." (46 page(s), 6/19/1986)
- ML20203A166 - Rev 3 to Quality Instruction QI-010, "Reinsp of Electrical Equipment/I-E-EEIN." (7 page(s), 2/21/1986)
- ML20203A189 - Rev 1 to Quality Instruction QI-030, "Documentation Review of Large Bore Pipe Supports - Nonrigid." (19 page(s), 3/7/1986)
- ML20202J310 - Rev 3 to Procedure CPP-003, "Indoctrination,Training & Certification of Personnel." (24 page(s), 12/10/1985)
- ML20202J608 - Rev 1 to Quality Instruction QI-040, "Documentation Review of HVAC Ducts & Plenums." (21 page(s), 2/20/1986)
- ML20202J715 - Rev 2 to Procedure CPP-016, "Safety Significance Evaluations of Deviation Repts." (16 page(s), 1/28/1986)
- ML20202J243 - Change Notice 001 to Rev 0 to Quality Instruction QI-062, "Insp of Nonpressure Boundary Welds for Supplementary Evaluation of Visual Welding Insp Techniques." (2 page(s), 12/18/1985)
- ML20202J282 - Rev 1 to DAP-13, "Preparations of Calculations." (20 page(s), 5/28/1986)
- ML20203A039 - Rev 4 to Quality Instruction QI-007, "Reinsp of Plug Welds." (10 page(s), 4/24/1986)
- ML20202J682 - Rev 1 to Quality Instruction QI-049, "Reinsp of Large Bore Pipe Welds/Matl." (16 page(s), 3/18/1986)
- ML20203A141 - Rev 3 to Quality Instruction QI-029, "Reinsp of Large Bore Pipe Supports - Nonrigid." (152 page(s), 6/27/1986)
- ML20202J641 - Change Notice 001 to Rev 1 to Quality Instruction QI-049, "Reinsp of Large Bore Pipe Welds/Matl." (2 page(s), 4/3/1986)
- ML20203A531 - Change Notice 002 to Rev 1 to Quality Instruction QI-017, "Documentation Review of Cable Tray/R-E-CATY." (2 page(s), 6/23/1986)