Partial response to FOIA request for documents re SER - OL stage.Documents listed in Apps A & B available in PDR.Review of remaining documents subj to request incomplete.
Accession Number: ML20105B549
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20112J886 - Partial response to FOIA request for documents re SER - OL stage.Documents listed in Apps A & B available in PDR.Review of remaining documents subj to request incomplete. (7 page(s), 7/5/1984)
- ML20105D150 - Forwards request for addl info re FSAR Sections 3.3,3.4.2, 3.5.3,3.7 & 3.8 for transmittal to applicant. (6 page(s), 4/13/1984)
- ML20113A064 - Forwards final SALP evaluation for Nov 1982 - Oct 1983.W/o encl. (23 page(s), 12/29/1983)
- ML20105C954 - Trip rept of 840305-06 site visit w/util,Bechtel & Southern Co Svcs to upstream dams to become familiar w/features re potential dam failures & flood effects. (2 page(s), 3/6/1984)
- ML20105D169 - Forwards request for addl info based on branch review of appropriate sections of FSAR. (12 page(s), 4/19/1984)
- ML20105D238 - Forwards comments & questions on FSAR Section 4.4, "Thermal- Hydraulic Design." Physics questions sent previously.Fuels questions should be finished by June 1984. (11 page(s), 5/4/1984)
- ML20105D145 - Forwards request for addl info re fire protection program & compliance w/NUREG-0800 guidelines.Info needed by 840701 to meet review schedule. (6 page(s), 4/12/1984)
- ML20105D282 - Forwards branch questions needed to complete evaluation of FSAR,based on review of listed sections. (13 page(s), 5/14/1984)
- ML20105D101 - Forwards FSAR review questions,based on radiological consequence evaluations of Chapter 15,proposed fission product control sys & control room habitability envelope. (4 page(s), 3/30/1984)
- ML20105C608 - Forwards request for addl info based on Chapter 12 & other pertinent sections of FSAR.Site visit planned. (6 page(s), 11/30/1983)
- ML20105D327 - Forwards NRC questions & staff positions re BNWL review of util initial test programs described in Chapter 14.0,Section 14.2 of FSAR.Encl should be forwarded to applicant. (11 page(s), 4/17/1984)
- ML20106A074 - Forwards revised 831129 review schedule.Initiation of review delayed until 840201 to allow higher priority work to be accomplished in timely manner. (3 page(s), 12/16/1983)
- ML20105B546 - Comments on Bechtel Oct 1982 rept, "Studies of Postulated Millett Fault." Conclusion that hydrologic data provide no basis to support or preclude existence of fault acceptable. (1 page(s), 1/12/1983)
- ML20105D317 - Forwards request for addl info re operating & maint procedures,FSAR Section 13.5.2 & 15.8.Requests transmittal of request to applicant. (2 page(s), 4/13/1984)
- ML20112K073 - Forwards Work Assignment 2 for Project 2, "Meteorological Data Tape & Computer Code Support," of technical assistance contract, "Meteorological Data Assessment Program." Work assignment requests specific computer code support. (5 page(s), 3/6/1984)
- ML20105D289 - Forwards summary of 840306-07 site visit & agreements reached on request for addl info re Geotechnical Engineering Branch review.W/o encl. (55 page(s), 5/11/1984)
- ML20105C685 - Forwards request for info re status of unresolved safety issues for facility.Info from applicant should include summary description of relevant programs & interim measures taken pending resolution of issues. (2 page(s), 1/5/1984)
- ML20105C602 - Forwards NRR draft input for SALP for Nov 1982 - Oct 1983. Input based upon input solicited from staff who have contact w/util licensing matl.Comments received by 831209 will be considered in final rept.Overall Category 2 assigned. (5 page(s), 12/1/1983)
- ML20105C617 - Forwards request for addl info on FSAR. (3 page(s), 12/9/1983)
- ML20105C613 - Forwards appropriate pages from Table 3.2.2-1 of FSAR re safety-related structures sys,components within Meteorology & Effluent Treatment Branch purview,including turbine sealing sys & data collection equipment. (32 page(s), 12/9/1983)
- ML20105D188 - Requests addl info on meteorology resulting from review of FSAR for facility.Process of extracting meteorological data from magnetic tape provided by applicant in progress. Questions encl. (12 page(s), 4/26/1984)
- ML20105C743 - Forwards draft safety questions re design basis groundwater level & site drainage,for transmittal to applicant prior to 840206 site visit. (5 page(s), 1/24/1984)
- ML20105C594 - Submits list of specific safety-related structures,sys & components being reviewed as shown in FSAR Table 3.2.2-1. (3 page(s), 12/7/1983)
- ML20105C880 - Forwards requests for addl info re safety review site visit planned for 840306-09 by Geotechnical Engineering & Reactor Sys Branch. (26 page(s), 2/21/1984)
- ML20113A020 - Forwards requests for addl info developed during review of FSAR Chapter 14 re initial plant test program.Review conducted through Amend 4.Listing of items requiring resolution encl. (13 page(s), 4/4/1984)
- ML20105C802 - Notification of 840321-22 environ site visit.Proposed agenda items should be forwarded to M Miller by 840214. (1 page(s), 2/7/1984)
- ML20106A068 - Discusses Savannah District dam safety plan.Plan & related maps forwarded under separate cover.Plan addresses emergencies re above normal reservoir water levels &/or rapid release of large vol of water past dam. (1 page(s), 1/27/1984)
- ML20105D307 - Forwards request for addl info re seismic & quality group classification of structures,sys & components & compliance w/10CFR50.55a. (5 page(s), 5/16/1984)
- ML20105C923 - Forwards request for addl info re FSAR & TMI Item II.B.3. Response requested by 840715. (2 page(s), 2/27/1984)
- ML20105C873 - Discusses agenda for Mar site visit & visit w/county & local planning officials to discuss socioeconomics,geography & demography in site vicinity. (2 page(s), 2/13/1984)
- ML20105C610 - Forwards branch questions for FSAR review re total peaking factor & control rod withdrawal. (2 page(s), 12/19/1983)
- ML20105D323 - Forwards request for addl info based on review of Chapter 15 of FSAR. (36 page(s), 5/14/1984)
- ML20106A070 - Requests encl questions,prepared by BNWL,on Section 4.2 of FSAR be forwarded to applicant. (2 page(s), 6/18/1984)
- ML20105D173 - Forwards branch request for addl info re Section 6.3 of FSAR.Review being continued. (17 page(s), 4/16/1984)
- ML20105C920 - Advises of review of Q-list in FSAR Table 3.2.2-1.Q-list does not contain hydrogen sulfide,chlorine & radiation monitors for control room air intakes. (1 page(s), 2/15/1984)
- ML20105D229 - Forwards request for addl info covering portions of FSAR, up to & including Amend 5 re fire protection associated circuit review. (23 page(s), 4/30/1984)
- ML20105D397 - Requests resolution of encl comments to assure that identified items are within scope of QA program & in compliance w/10CFR50,App B. (2 page(s), 5/25/1984)
- ML20105C661 - Forwards request for addl info re Sections 6.5.1,10.4.2, 10.4.3,15.7.3 & Chapter 11 of FSAR to complete evaluation. (13 page(s), 12/23/1983)
- ML20105C820 - Forwards request for addl info re FSAR Sections 5.2 & 5.4, for continuing branch review. (20 page(s), 2/7/1984)
- ML20105C723 - Reviews Q-list (FSAR Tables 3.2-1 & 3.2-2),in response to 831129 request.Site drainage sys,roof scuppers & water storage tank dikes should be added to Q-list. (2 page(s), 1/24/1984)
- ML20105D199 - Forwards Hydrologic Engineering Section addl safety & environ questions requiring response. (11 page(s), 4/30/1984)