Home > NRC Library > ADAMS Public Documents
Third partial response to FOIA request for documents re prior hearing for proposed OL amends for 11 reactors, allowing operation w/one recirculation loop out of svc. Forwards App A documents.App B documents in PDR.
Accession Number: ML20099K024
Date Released: Friday, November 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20099K019 - Third partial response to FOIA request for documents re prior hearing for proposed OL amends for 11 reactors, allowing operation w/one recirculation loop out of svc. Forwards App A documents.App B documents in PDR. (9 page(s), 4/19/1984)
- ML20099K199 - Summary of 760129 meeting w/util & GE re Reload 2 & single loop operation. (7 page(s), 2/13/1976)
- ML20099K172 - Proposed Tech Specs changing rod block monitor/rod block setpoint during single loop operation. (3 page(s), 3/1/1976)
- ML20099K053 - Application to amend License DPR-35,changing Tech Specs to allow operation w/single recirculation loop. (2 page(s), 11/17/1975)
- ML20099K349 - Responds to request for addl info re single loop operation. Info provided by GE. (2 page(s), 5/6/1976)
- ML20099K559 - Proposed Tech Spec Change RTS-74,allowing single loop operation w/bypass flow holes plugged. (20 page(s), 1/12/1977)
- ML20099K542 - Responds to 761214 request for addl info re single recirculation pump operation w/equalizer valve closed. (2 page(s), 1/19/1977)
- ML20099K145 - Notice of proposed issuance of amend to License DPR-35. (4 page(s), 10/10/1975)
- ML20099K324 - Responds to 760329 request for addl info re single loop operation.Info provided by GE. (8 page(s), 4/12/1976)
- ML20099K155 - Application to amend License DPR-35,changing Tech Specs to modify rod block monitor/rod block setpoint during single loop operation. (2 page(s), 3/1/1976)
- ML20099K063 - Proposed Tech Specs allowing operation w/single recirculation loop. (9 page(s), 11/17/1975)
- ML20099K512 - Proposed Tech Specs allowing operation at substantial power level w/one recirculation pump in operation & equalizer valve closed. (9 page(s), 9/7/1976)
- ML20099K371 - Responds to 760528 request for addl info re single loop operation.Info provided by GE. (12 page(s), 6/24/1976)
- ML20099K111 - Forwards GE proprietary classification sys,thermal hydraulic analysis & power level profile,LOCA analysis per 10CFR50,App K,proposed Tech Specs revs & failure study on ECCS manually controlled electrically operated valves.W/o encls. (4 page(s), 7/9/1975)
- ML20099K508 - Application to amend License DPR-22,changing Tech Spec to allow operation at substantial power level w/one recirculation pump in operation & equalizer valve closed. (4 page(s), 9/7/1976)
- ML20099K268 - Proposed Tech Specs re boron concentration in moderator water for standby liquid control sys. (26 page(s), 3/19/1976)
- ML20099K086 - Forwards request for addl info required to complete review of ECCS reanalysis to be submitted per 741227 order for mod of license.Some info previously identified. (25 page(s), 6/18/1975)
- ML20099K404 - Forwards notice of proposed issuance of amend to License DPR-35.Proposed amend revises Tech Specs to add operating limits for single loop operation.Safety evaluation will be submitted when completed. (2 page(s), 7/23/1976)
- ML20099K523 - Notice of proposed issuance of amend to License DPR-22. (3 page(s), 9/27/1976)
- ML20099K494 - Forwards application to amend License DPR-22,changing Tech Spec to allow operation at substantial power level w/one recirculation pump in operation & equalizer valve closed. (1 page(s), 9/7/1976)
- ML20099K308 - Suppl to "Pilgrim Nuclear Power Station Unit 1 Amend for Single Loop Operation W/Bypass Holes Plugged." (10 page(s), 1/31/1976)
- ML20099K531 - Forwards request for addl info re operation w/one recirculation pump & equalizer valve closed.Response requested within 45 days of receipt of ltr. (3 page(s), 12/14/1976)
- ML20099K515 - Forwards notice of proposed issuance of amend to License DPR-22.Proposed amend revises Tech Specs to add operating limits for single loop operation. (2 page(s), 9/28/1976)
- ML20099K442 - Notice of proposed issuance of amend to License DPR-35. (3 page(s), 7/23/1976)
- ML20099K129 - Forwards notice of proposed issuance of amend to License DPR-35,incorporating operating limits in Tech Specs based on acceptable evaluation model. (2 page(s), 10/10/1975)
- ML20099K362 - Confirms 760521 oral request for addl info re single loop operation.Info requested by 760601. (3 page(s), 5/28/1976)
- ML20099K116 - "Pilgrim Nuclear Power Station Unit 1 License Amend for Single-Loop Operation." (35 page(s), 10/31/1975)
- ML20099K483 - Initial NSHC determination & noticing action re util 800805 application & 820506 & 0805 mods to application to amend License DPR-46 to provide APRM flux scram trip & rod block settings & increase safety limit min critical power ratio. (4 page(s), 9/1/1983)
- ML20099K556 - Application to amend License DPR-49,consisting of Tech Spec Change Request RTS-74,allowing single loop operation w/bypass flow holes plugged. (1 page(s), 1/12/1977)
- ML20099K232 - Revised application to amend License DPR-35,changing Tech Specs re boron concentration in moderator water,in support of single loop operation. (2 page(s), 3/19/1976)