Responds to FOIA request for documents addressing completion status of Perry Nuclear Station,Unit 1 in terms of elapsed time,committed capital or by physical insp.Forwards documents listed in App A.
Accession Number: ML20069A103
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20069D628 - Responds to FOIA request for documents addressing completion status of Perry Nuclear Station,Unit 1 in terms of elapsed time,committed capital or by physical insp.Forwards documents listed in App A. (3 page(s), 7/30/1982)
- ML20069D639 - Provides present estimated completion dates for facility. Units 1 & 2 scheduled for completion in Dec 1981 & June 1983,respectively. (1 page(s), 9/13/1976)
- ML20069D642 - "Projected Quantities for Unit 1 & Common Facilities." Related info encl. (24 page(s), 11/14/1978)
- ML20069A099 - Recommends site visit by forecast panel be scheduled by fall of 1979 to determine if util's estimated Jun 1982 date for fuel loading for unit 1 is reasonable. (1 page(s), 1/22/1979)
- ML20069A723 - Notification of 811007-09 meeting w/util at site to discuss const status. (5 page(s), 9/28/1981)
- ML20069D649 - "Case Load Forecast Panel Licensing." (42 page(s), 10/7/1981)
- ML20069C408 - Recommends that facility SER issue date be rescheduled to 820524.Recommendation based on uncompleted staff evaluation input & delays in receipt of evaluation input. (2 page(s), 5/4/1982)
- ML20069C639 - Requests approval to delay issuance of FES from 820705 to 820813.Several comments on DES received late.Psychological stress must be considered in NEPA analysis,fuel cycle costs & cost benefits.Delay will not impact ASLB hearings. (18 page(s), 7/2/1982)