Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for documents prepared & made available between Oct 1972-Sept 1973 re Hosgri Fault. Forwards documents listed in App A.
Accession Number: ML20064N618
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20064N614 - Responds to FOIA request for documents prepared & made available between Oct 1972-Sept 1973 re Hosgri Fault. Forwards documents listed in App A. (2 page(s), 8/2/1982)
- ML20064N619 - Discusses ASLB 680220-21 public hearing in San Luis Obispo, CA re util application for provisional CP for PWR in Diablo Canyon,CA. (5 page(s), 3/8/1968)
- ML20064N628 - Trip rept of 731025 site visit to discuss questions re geology & seismology of area.Applicant has initiated further field testing on eastern slope to obtain addl borings. (4 page(s), 10/31/1973)
- ML20064N633 - Summary of 750828 meeting w/PG&E in Bethesda,MD re forthcoming geology/seismology submittal for facilities. Issues addressed would include earthquake relevant to Hosgri Fault & ground response spectrum. (2 page(s), 10/30/1975)
- ML20064N644 - Submits revised schedule for safety review of OL application.Licensing effort scheduled for completion on 760414.Request for addl info encl. (10 page(s), 11/14/1975)
- ML20064N651 - Summary of 760122 meeting w/consultants & USGS re seismic design of facilities.Engineering concerns,while more fully expressed,were not alleviated to any significant degree. (7 page(s), 1/28/1976)
- ML20064N657 - Summary of 760205 meeting w/PG&G & USGS in Menlo Park,CA to discuss geology & seismology of site.Util views re northern end of Hosgri Fault presented. (7 page(s), 3/4/1976)
- ML20064N664 - Summary of ACRS subcommittee meeting on 760521 w/util re capability of site to withstand earthquake.Util determined effective site acceleration of .75 g for use in engineering design calculations. (3 page(s), 6/7/1976)
- ML20064N667 - Responds to 760906 ltr re facility.Util evaluation of local seismology & geology in progress.W/o encl. (2 page(s), 9/30/1976)