Home > NRC Library > ADAMS Public Documents
Further response to FOIA request for records re Comanche Peak Task Force established in Mar 1984.Forwards App R documents.Portions of Records 224,226-258 & 274 withheld (ref FOIA Exemption 5).
Accession Number: ML19284C882
Date Released: Friday, October 25, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20206U369 - Further response to FOIA request for records re Comanche Peak Task Force established in Mar 1984.Forwards App R documents.Portions of Records 224,226-258 & 274 withheld (ref FOIA Exemption 5). (24 page(s), 6/24/1986)
- ML20206U500 - Partially withheld transcript of 841115 interview providing feedback re Technical Review Team assessment of concerns. (20 page(s), 11/15/1984)
- ML20204J174 - Discusses 841030 feedback interview of Witness SRT-A-2 re assessment of concerns raised to NRC during 840403-13 insp. Witness elected not to sign confidentiality agreement & requested NRC to limit use of name to "need to know" basis. (2 page(s), 11/15/1984)
- ML20206U380 - Partially withheld memo discussing interview of individual to clarify info re allegations made part of Category 32.Trip to Glen Rose,TX,to reiterate alleger response not warranted. Record of interview encl. (29 page(s), 10/29/1984)
- ML20206U579 - Summary of 841107 feedback interview w/Allegers A-44 & A-73 at Fort Worth,TX,to discuss Technical Review Team evaluation & conclusions re mechanical/piping,QA/QC,civil/structural & miscellaneous allegations.Related documentation encl. (19 page(s), 7/17/1985)
- ML20206U518 - Forwards transcript of discussion re concerns & tour of facility w/Comanche Peak Technical Review Team.W/o transcript. (5 page(s), 3/28/1985)
- ML20206U759 - Forwards transcript of 841107 meeting w/Comanche Peak Technical Review Team.W/o encl. (5 page(s), 6/24/1986)
- ML20206U559 - Partially withheld ltr forwarding papers borrowed during 840906 interview.Requests signature on encl confidentiality agreement.W/o papers. (4 page(s), 10/11/1984)
- ML20206U607 - Forwards withheld list of Comanche Peak allegers in civil/mechanical area.Summary of all allegations encl. (175 page(s), 10/17/1984)
- ML20206U668 - Handwritten ltr responding to V Noonan 850129 memo requesting documents in possession of author concerning facility.Cross ref sort of allegations encl. (974 page(s), 2/26/1985)
- ML20206U645 - Partially withheld handwritten ltr commenting on civil/ structural SSERs.Civil/structural SSERs do not identify feedback items to QA/QC. (11 page(s), 11/13/1984)
- ML20206U712 - Partially withheld memo re completion of allegation feedback effort for Witness A-38.Concerns re hanger welding problems in Nov 1983 examined by Region IV & documented in Insp Rept 50-445/84-05.Record of telcon w/A-43 encl. (8 page(s), 11/20/1984)
- ML20206U935 - Partially withheld Draft 7 to SSER re Allegation AC-41 concerning poor workmanship in use of elastic joint filler matl between seismic Category I structures.Related documentation encl. (200 page(s), 12/19/1984)
- ML20206U630 - Partially withheld summary of feedback interview w/Alleger A-32 re Coatings Concerns AQ0-14,16,20 & 21.Alleger satisfied w/results of investigation. (1 page(s), 11/30/1984)
- ML20206U491 - Partially withheld ltr expressing appreciation for allowing technical reviewers to discuss preliminary findings re recipient concerns.Partially withheld transcript of interview encl. (11 page(s), 12/6/1984)
- ML20206U507 - Partially withheld ltr expressing appreciation for participation in telcon to discuss concerns re const activities.Transcript of telcon encl.W/o encl. (5 page(s), 2/7/1985)
- ML20206U716 - Forwards CASE Exhibits 498 & 497,NRC M-1802 & M-1802 R1,per 841126 discussion & 841107 meeting.Agreement on sufficient info does not imply satisfaction or agreement w/Technical Review Team position. (24 page(s), 12/1/1984)
- ML20206U384 - Partially withheld ltr forwarding transcript of 841127 interview re investigation into allegations.SER will be provided.W/partially withheld affidavit & records of 840914 & 850124 telcons. (39 page(s), 12/3/1984)
- ML20206U925 - Partially withheld Rev 1 to SSER re Allegation AE-17, alleging field run conduit,drywall & lighting installed above ceiling panels in control room classified as nonseismic. (7 page(s), 12/19/1984)
- ML20206U564 - Partially withheld memo describing effort to conduct feedback interview w/Alleger AC-30 by telephone.Alleger AR-30 advised NRC that Alleger AC-30 had no further concerns or desire for feedback interviews. (1 page(s), 11/30/1984)
- ML20206U506 - Partially withheld memo discussing telcon w/util mgt re Technical Review Team (TRT) interview w/allegers.Util attempting to interfere w/TRT insp of allegation.Advice re changes to procedures to address issue requested. (2 page(s), 11/16/1984)
- ML20206U452 - Expresses appreciation for allowing Technical Review Team to discuss concerns re Comanche Peak Steam Electric Station. Transcript of interview encl.SER will be forwarded when published.W/o encl. (2 page(s), 4/9/1985)
- ML20206U412 - Transcript of Comanche Peak Technical Review Team 850509 discussion w/N Harris in Glen Rose,TX.Pp 1-16. (16 page(s), 5/9/1985)
- ML20204J151 - Advises that Alleger A-27 contacted on 841107 by R Wessman. Arrangements made to conduct feedback interview on 841115 re concerns raised on const of facilities.Alleger spouse informed Wessman A-27 unable to attend interview. (3 page(s), 11/29/1984)
- ML20206U686 - Partially withheld memo discussing declined feedback interview for Alleger A-33.Alleger accepted offer to receive applicable SSER when published. (2 page(s), 12/7/1984)
- ML20206U546 - Partially withheld record of 850320 telcon w/Alleger SRT-A-1 re feedback on concern addressed in 840713 SIT rept. (1 page(s), 3/23/1985)
- ML20206U456 - Partially withheld ltr forwarding transcript of interview re preliminary findings on recipient concerns.W/o transcript. (7 page(s), 11/26/1984)
- ML20206U408 - Partially withheld handwritten memo re working coatings allegations into Allegations Tracking Sys database.Feedback interview w/alleger suggested. (1 page(s), 6/28/1985)
- ML20206U774 - Provides policy for processing investigation repts received from Ofc of Investigations. (14 page(s), 6/20/1983)
- ML20206U524 - Forwards complete transcript of two tapes made during Technical Review Team 850110 tour of facility w/ H & D Stiner.Tapes also encl.W/o tapes. (1 page(s), 3/26/1985)
- ML20206U726 - Requests facts re J Ellis 850201 telcon concerning second failure of reactor coolant pump motor & util cutting spent fuel pool liners in Unit 2 to look at concrete.Response requested by 850208. (3 page(s), 2/6/1985)
- ML20206U544 - Partially withheld ltr forwarding SSER 8 (NUREG-0797) re Comanche Peak Technical Review Team evaluation & resolution of 86 technical concerns & allegations.W/o encl. (9 page(s), 5/6/1985)
- ML20206U555 - Partially withheld memo re assignment of Allegation Tracking Sys cross refs. (1 page(s), 4/1/1985)
- ML20206U600 - Handwritten ltr commenting on Comanche Peak Response Team action plan.More than one strength of concrete may have been placed between Jan 1976 & Feb 1977. (23 page(s), 10/17/1984)
- ML20205B090 - Summary of 850323 feedback interview w/Allegers A-44 & A-73 re NRC evaluation & conclusions of allegers concerns in mechanical/piping,QA/QC,civil/structural & miscellaneous areas. (2 page(s), 7/17/1985)
- ML20206U396 - Partially withheld ltr providing telephone numbers & requesting addl info re electrical const concerns at facility.Partially withheld record of 841109 telcon encl. (3 page(s), 8/30/1984)
- ML20206U588 - Forwards transcript of 841108 feedback interview w/Witness A-22 re Technical Review Team investigations into Mechanical/Piping Concerns AW-66 & AW-70.W/o encl. (2 page(s), 12/3/1984)
- ML20206U624 - Summary of 841031 feedback rept to Alleger A-23 re Technical Review Team disposition of Issues AC-22 & AC-23.Alleger felt that Technical Review Team correctly interpreted & resolved concerns. (2 page(s), 3/13/1985)
- ML20206U635 - Partially withheld Rev 1 to SSER re Allegations AQC-13, AQC-14,AQC-15,AC-18 & AC-40,alleging unauthorized & undocumented holes drilled through reinforcing steel. (8 page(s), 12/19/1984)
- ML20206U374 - Partially withheld ltr forwarding SSER 9 (NUREG 0797) re Comanche Peak Technical Review Team evaluation & resolution of 62 technical concerns & allegations in coatings area,per agreement.W/o encl. (2 page(s), 7/18/1985)
- ML20206U732 - Requests status of listed subjs from J Ellis 850112 & 15 telcons,including questions re Region IV Insp Rept 84-29, trend analysis,recent interview w/Stiners & util news ltr exhibiting intimidation,by 840208. (1 page(s), 2/7/1985)
- ML20207A571 - Partially withheld transcript of 841115 interview to provide feedback re Technical Review Team assessment of concerns. (11 page(s), 11/15/1984)
- ML20206U572 - Discusses loss of transcript.Transcript last seen during Technical Review Team investigative work in Texas in Fall 1984. (2 page(s), 2/22/1985)
- ML20206U417 - Forwards transcript of 841107 meeting to discuss concerns re facility.W/o transcript. (3 page(s), 11/30/1984)
- ML20206U745 - Record of 850215 telcon w/J Ellis re upcoming meeting w/ Walsh & Doyle. (1 page(s), 2/22/1985)
- ML20206U692 - Summary of 840803 feedback rept to Alleger A-24 re results of Technical Review Team investigation.Technical Review Team unable to substantiate any allegations due to general nature. (5 page(s), 3/13/1985)
- ML20204J162 - Discusses unsuccessul attempts to contact Alleger A-29 re concerns raised regarding const at facilities. (3 page(s), 11/29/1984)
- ML20206U533 - Partially withheld ltr expressing appreciation for allowing Technical Review Team opportunity to discuss concerns re facility.Forwards transcript.SER will be forwarded.W/o encl. (1 page(s), 11/30/1984)
- ML20206U551 - Summary of Technical Review Team 850325 feedback interview w/Alleger SRT-A-1 re Concerns AQ-121 & 122.Alleger concerns based on lack of familiarity w/non-ASME procedures. (2 page(s), 4/15/1985)
- ML20206U620 - Partially withheld ltr expressing appreciation for allowing Technical Review Team opportunity to discuss concerns re facility.Forwards transcript.SER will be forwarded.W/o encl. (5 page(s), 2/11/1985)
- ML20206U603 - Record of 850127 telcon w/Alleger A-31 to discuss concern re const of facility. (1 page(s), 1/27/1985)
- ML20206U435 - Forwards partially withheld allegations & transcript from meeting w/util employees.Feedback requested by 860726.W/o transcript. (4 page(s), 7/10/1985)
- ML20206U706 - Summary of 841114 feedback interview w/Alleger A-28 re results of Technical Review Team investigation into Coatings Concerns AQ0-16 & AQ0-20 through AQ0-25.Alleger satisfied w/results of investigation. (18 page(s), 12/3/1984)
- ML20206U739 - Forwards transcripts of 850109-10 interviews w/H Stiner & D Stiner.W/o encl. (3 page(s), 2/7/1985)
- ML20206U615 - Handwritten ltr commenting on electrical/instrumentation group SSERs. "Action required" in Section 6 of SSERs should be consistent w/840918 ltr to util. (9 page(s), 10/29/1984)
- ML20206U662 - Forwards Civil/Mechanical Group input to 10CFR50.57 ltr,per request. (8 page(s), 10/9/1984)
- ML20206U753 - Provides addl info re J Ellis 850201 telcon concerning reactor coolant pump motor failure & cutting of spent fuel pool liner. (21 page(s), 4/19/1985)
- ML20206U478 - Partially withheld ltr forwarding tentative conclusions on concerns re const of facility.Rept on results of evaluations of concerns raised by many individuals will be released on 850101. (9 page(s), 12/3/1984)
- ML20206U422 - Forwards partially withheld summaries of 841108-14 interviews w/allegers re mechanical & piping areas. (2 page(s), 6/24/1986)
- ML20206U651 - Handwritten ltr commenting on Test Program Group SSERs.SSERs do not reflect discussion w/allegers.Inclusion of statements re implied significance of allegations probably unnecessary. (5 page(s), 11/14/1984)
- ML20206U537 - Partially withheld ltr forwarding transcripts of feedback meetings conducted by telcon on 850502 & 0617. (61 page(s), 7/25/1985)
- ML20206U445 - Partially withheld ltr forwarding SSER 10 (NUREG-0797). (2 page(s), 6/24/1985)
- ML20204J047 - Discusses efforts to interview Witnesses SRT-A-5,SRT-A-6 & SRT-A-38 to provide feedback to concerns raised re const of facility.SRT-A-5 & A-38 failed to appear for scheduled interviews. (2 page(s), 11/6/1984)
- ML20206U465 - Summary of telcon interview w/Allegers re Technical Review Team disposition of Allegations AC-22 & AC-23 concerning Category 2 of civil/structure SSER. (2 page(s), 7/7/1986)
- ML20206U484 - Partially withheld handwritten record of telcon w/ Individual L.Info re Allegation 62 concerning where contaminated paint used could not be provided. (3 page(s), 9/11/1984)
- ML20206U429 - Partially withheld memo forwarding SSER 8 (NUREG-0797). (8 page(s), 5/6/1985)
- ML20206U389 - Partially withheld memo re interview w/Alleger A-36 to provide feedback on Technical Review Team assessment of concern.Transcript of interview will be forwarded to alleger. (2 page(s), 12/7/1984)
- ML20206U592 - Describes computer search indicating that no investigation repts written using Batch 9H5381M.Searches cannot be performed by type of coating unless batch numbers known. (2 page(s), 9/11/1984)
- ML20206U640 - Partially withheld summary of feedback interview w/Alleger A-31 re results of Technical Review Team investigation into Coating Issues AQ0-7 & 11.Alleger satisfied w/results of investigation. (1 page(s), 2/7/1985)
- ML20206U657 - Handwritten ltr commenting on Electric/Instrumentation Group SSERs.Actions required not identical to 840918 ltr. (10 page(s), 11/28/1984)
- ML20206U403 - Transcript of Comanche Peak Technical Review Team 860509 discussion w/C Welch in Glen Rose,TX.Pp 1-23. (24 page(s), 5/9/1985)
- ML20206U529 - Transcript of 850110 site tour w/Technical Review Team, H & D Stiner.Pp 1-12.Supporting documentation encl. (25 page(s), 1/10/1985)
- ML20206U700 - Partially withheld summary of feedback interview w/Alleger A-34 re results of Technical Review Team investigation into Coatings Concerns AQ0-16,19 & 25.Alleger satisfied w/results of interview. (2 page(s), 11/29/1984)
- ML20206U513 - Discusses two instances of potential alleger harassment. Flight reservations canceled by telephone on 850109 & 0324 for Allegers A-51 & A-4,respectively.M Lamastra pursuing idea of using security code when making reservations. (1 page(s), 4/3/1985)
- ML20206U441 - Partially withheld transcript of 850205 telephone interview. Pp 1-5. (7 page(s), 2/5/1985)