Home > NRC Library > ADAMS Public Documents
Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report.
Accession Number: ML19151A217
Date Released: Monday, September 30, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19151A181 - Beaver Valley Power Station, Unit 2, Submittal of Rev. 24 to Updated Final Safety Analysis Report. (5 page(s), 5/14/2019)
- ML19151A186 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, List of Effective Pages. (77 page(s), 5/14/2019)
- ML19151A187 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (339 page(s), 5/14/2019)
- ML19151A189 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 2, The Site, Part 1 of 2. (723 page(s), 5/14/2019)
- ML19151A191 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 2, The Site, Part 2 of 2. (650 page(s), 5/14/2019)
- ML19151A192 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Part 1 of 2. (537 page(s), 5/14/2019)
- ML19151A193 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Part 2 of 2. (549 page(s), 5/14/2019)
- ML19151A194 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 4, Reactor. (270 page(s), 5/14/2019)
- ML19151A195 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems. (234 page(s), 5/14/2019)
- ML19151A196 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (511 page(s), 5/14/2019)
- ML19151A197 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls. (470 page(s), 5/14/2019)
- ML19151A198 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 8, Electric Power. (172 page(s), 5/14/2019)
- ML19151A199 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (461 page(s), 5/14/2019)
- ML19151A200 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (177 page(s), 5/14/2019)
- ML19151A201 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (188 page(s), 5/14/2019)
- ML19151A204 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection. (160 page(s), 5/14/2019)
- ML19151A205 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations. (34 page(s), 5/14/2019)
- ML19151A206 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program. (162 page(s), 5/14/2019)
- ML19151A207 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis. (471 page(s), 5/14/2019)
- ML19151A208 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications. (5 page(s), 5/14/2019)
- ML19151A209 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance. (3 page(s), 5/14/2019)
- ML19151A210 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering. (6 page(s), 5/14/2019)
- ML19151A211 - Beaver Valley Power Station, Unit 2, Rev. 24 to Updated Final Safety Analysis Report, Chapter 19, Managing the Effects of Component Aging. (61 page(s), 5/14/2019)
- ML19151A212 - Beaver Valley Power Station, Unit 2, Rev 94 to Licensing Requirements Manual. (260 page(s), 5/14/2019)
- ML19151A213 - Beaver Valley Power Station, Unit 2, Rev. 36 to Technical Specification Bases. (696 page(s), 5/14/2019)
- ML19151A214 - Beaver Valley, Units 1 and 2, Davis-Besse, Perry, Rev 24 to Quality Assurance Program Manual. (36 page(s), 3/4/2019)