Home > NRC Library > ADAMS Public Documents
Shearon Harris Nuclear Power Plant, Unit 1 - Resubmittal of Amendment 62 to Final Safety Analysis Report.
Accession Number: ML19102A137
Date Released: Tuesday, September 24, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19102A136 - Shearon Harris Nuclear Power Plant, Unit 1, Resubmittal of Amendment 62 to Final Safety Analysis Report. (19 page(s), 3/29/2019)
- ML19102A086 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Cover Sheet. (1 page(s), 3/29/2019)
- ML19102A087 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, List of Effective Pages. (85 page(s), 3/29/2019)
- ML19102A089 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (146 page(s), 3/29/2019)
- ML19102A101 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 2, Site Characteristics [Redacted]. (1201 page(s), 3/29/2019)
- ML19102A104 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 3, Conformance with NRC General Design Criteria [Redacted]. (1163 page(s), 3/29/2019)
- ML19102A105 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 4, Reactor. (181 page(s), 3/29/2019)
- ML19102A106 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems. (191 page(s), 3/29/2019)
- ML19102A107 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features [Redacted]. (738 page(s), 3/29/2019)
- ML19102A108 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls. (324 page(s), 3/29/2019)
- ML19102A110 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 8, Electric Power. (168 page(s), 3/29/2019)
- ML19102A111 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 9, New and Spent Fuel Storage and Handling [Redacted]. (473 page(s), 3/29/2019)
- ML19102A090 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (186 page(s), 3/29/2019)
- ML19102A091 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (160 page(s), 3/29/2019)
- ML19102A092 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 12 - Radiation Protection [redacted] (198 page(s), 3/29/2019)
- ML19102A093 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 13 - Conduct of Operations. (39 page(s), 3/29/2019)
- ML19102A094 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 14 - Initial Test Program. (126 page(s), 3/29/2019)
- ML19102A095 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 15 - Accident Analysis. (500 page(s), 3/29/2019)
- ML19102A096 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 16 - Preliminary Technical Specification (PSAR). (13 page(s), 3/29/2019)
- ML19102A097 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 17 - Quality Assurance during Design and Construction. (4 page(s), 3/29/2019)
- ML19102A098 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Chapter 18 - Final Safety Analysis Report Supplement for License Renewal. (40 page(s), 3/29/2019)
- ML19102A088 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report - TMI Appendices. (70 page(s), 3/29/2019)
- ML19102A150 - Shearon Harris Nuclear Power Plant, Unit 1, Technical Specification Equipment List Program, Rev. 069. (259 page(s), 3/29/2019)
- ML19102A151 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Drawings, Part 1 of 3. (28 page(s), 3/29/2019)
- ML19102A152 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Drawings, Part 2 of 3. (28 page(s), 3/29/2019)
- ML19102A153 - Shearon Harris Nuclear Power Plant, Unit 1, Amendment 62 to Final Safety Analysis Report, Drawings, Part 3 of 3. (23 page(s), 3/29/2019)