Home > NRC Library > ADAMS Public Documents
Davis-Besse Nuclear Power Station, Unit No. 1 - Submittal of the Updated Final Safety Analysis Report, Revision 32.
Accession Number: ML18283B087
Date Released: Wednesday, April 24, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18284A317 - Davis-Besse Nuclear Power Station, Unit No. 1 - Submittal of the Updated Final Safety Analysis Report, Revision 32. (36 page(s), 9/24/2018)
- ML18283A892 - Davis-Besse Nuclear Power Station, Unit No. 1 - Updated Final Safety Analysis Report, Revision 32, List of Effective Pages. (37 page(s), 9/24/2018)
- ML18283A895 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 1, Introduction and General Description of Station. (67 page(s), 9/24/2018)
- ML18283A898 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 2, Site Characteristics. (560 page(s), 9/24/2018)
- ML18283A901 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 3, Design Criteria - Structures, Components, Equipment, and Systems. (503 page(s), 9/24/2018)
- ML18283A905 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 4, Reactor. (272 page(s), 9/24/2018)
- ML18283A907 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 5, Reactor Coolant System. (155 page(s), 9/24/2018)
- ML18283A911 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 6, Engineered Safety Features. (277 page(s), 9/24/2018)
- ML18283A913 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 7, Instrumentation and Control. (183 page(s), 9/24/2018)
- ML18283A916 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 8, Electrical Power. (119 page(s), 9/24/2018)
- ML18283A921 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 10, Steam and Power Conversion System. (64 page(s), 9/24/2018)
- ML18283A923 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 11, Radioactive Waste Management. (263 page(s), 9/24/2018)
- ML18283A926 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 12, Radiation Protection. (64 page(s), 9/24/2018)
- ML18283A928 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 13, Conduct of Operations. (26 page(s), 9/24/2018)
- ML18283A931 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 14, Initial Tests and Operation. (133 page(s), 9/24/2018)
- ML18283A933 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 15, Accident Analysis. (264 page(s), 9/24/2018)
- ML18283A936 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 16, Technical Specifications. (2 page(s), 9/24/2018)
- ML18283A939 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 17, Quality Assurance Program for Station Operation. (2 page(s), 9/24/2018)
- ML18283A941 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 18, Managing the Effects of Component Aging. (111 page(s), 9/24/2018)
- ML18283A943 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), List of Effective Pages. (20 page(s), 9/24/2018)
- ML18283A946 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Section 1, Introduction and Summary. (27 page(s), 9/24/2018)
- ML18283A948 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Section 2, References. (7 page(s), 9/24/2018)
- ML18283A950 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Section 3, Safe Shutdown Systems, Components and Circuits. (28 page(s), 9/24/2018)
- ML18283A953 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Section 4, Appendix 4, Section III.G. Evaluation and Fire Hazard Evaluation. (982 page(s), 9/24/2018)
- ML18283A956 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Section 5, Associated Circuits. (6 page(s), 9/24/2018)
- ML18283A959 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Section 6, Emergency Lighting and Communications. (7 page(s), 9/24/2018)
- ML18283A961 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Section 7, Oil Collection System For Reactor Coolant Pumps. (3 page(s), 9/24/2018)
- ML18283A963 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Section 8, Operating Specifications. (34 page(s), 9/24/2018)
- ML18283A965 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Section 9, Fire Protection Safety Analysis. (27 page(s), 9/24/2018)
- ML18283A968 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Appendix A, Safe Shutdown Components List. (44 page(s), 9/24/2018)
- ML18283A970 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Appendix B-1, Circuit/Component Location Summary by System. (499 page(s), 9/24/2018)
- ML18283A972 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Appendix C-1, Associated Circuit Location Summary by Power Source. (63 page(s), 9/24/2018)
- ML18283A975 - Davis-Besse Nuclear Power Station, Unit 1, Revision 27 to Fire Hazards Analysis Report (FHAR), Appendix D, BTP-APCSB 9.5-1, Appendix Response. (90 page(s), 9/24/2018)
- ML18283A977 - Davis-Besse Nuclear Power Station, Unit 1, Revision 18 to Technical Requirements Manual. (150 page(s), 9/24/2018)
- ML18283A979 - Davis-Besse Nuclear Power Station, Unit 1, Revision 26 to Technical Specification Bases. (584 page(s), 9/24/2018)
- ML18283A981 - Davis-Besse Nuclear Power Station, Unit 1, Revision 23 to Quality Assurance Program Manual. (36 page(s), 9/24/2018)
- ML18283A986 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Drawings, Part 1 of 7. (100 page(s), 9/24/2018)
- ML18283A989 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Drawings, Part 2 of 7. (80 page(s), 9/24/2018)
- ML18283A993 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Drawings, Part 3 of 7. (65 page(s), 9/24/2018)
- ML18283A998 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Drawings, Part 4 of 7. (60 page(s), 9/24/2018)
- ML18283B002 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Drawings, Part 5 of 7. (65 page(s), 9/24/2018)
- ML18283B003 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Drawings, Part 6 of 7. (65 page(s), 9/24/2018)
- ML18283B004 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Drawings, Part 7 of 7. (128 page(s), 9/24/2018)
- ML19106A419 - Davis-Besse Nuclear Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Section 9, Auxiliary Systems. (237 page(s), 9/24/2018)