Home > NRC Library > ADAMS Public Documents
Brunswick Steam Electric Plant, Units 1 and 2 - Submittal of Revision 26 to the Updated Final Safety Analysis Report.
Accession Number: ML18249A165
Date Released: Wednesday, March 20, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18249A122 - Brunswick Steam Electric Plant, Units 1 and 2 - Submittal of Revision 26 to the Updated Final Safety Analysis Report. (6 page(s), 8/13/2018)
- ML18249A125 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Cover Page. (2040 page(s), 8/13/2018)
- ML18249A126 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary, Figures. (11 page(s), 8/13/2018)
- ML18249A128 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures. (75 page(s), 8/13/2018)
- ML18249A129 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A Figures. (3 page(s), 8/13/2018)
- ML18249A130 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Additional Geophysical Information, Appendix 2B. (4 page(s), 8/13/2018)
- ML18249A131 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Pertinent Portions of BSEP Structural Fill Quality Assurance Specifications, Appendix 2C. (5 page(s), 8/13/2018)
- ML18249A133 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Representative Examples of Backfill Progress Sketches and field and Laboratory Test Data Summary Sheet, Appendix 2D. (8 page(s), 8/13/2018)
- ML18249A134 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Representative Excavation and Stockpiling Summary Sheets, Appendix 2E. (3 page(s), 8/13/2018)
- ML18249A135 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Figures. (Redacted) (250 page(s), 8/13/2018)
- ML18249A140 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 4, Reactor, Figures. (46 page(s), 8/13/2018)
- ML18249A142 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures. (Redacted) (23 page(s), 8/13/2018)
- ML18249A143 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Figures. (37 page(s), 8/13/2018)
- ML18249A145 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures. (64 page(s), 8/13/2018)
- ML18249A146 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Figures. (3 page(s), 8/13/2018)
- ML18249A147 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures. (36 page(s), 8/13/2018)
- ML18249A148 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Figures. (16 page(s), 8/13/2018)
- ML18249A149 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Figures (Redacted). (9 page(s), 8/13/2018)
- ML18249A150 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures. (5 page(s), 8/13/2018)
- ML18249A151 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Figures. (4 page(s), 8/13/2018)
- ML18249A153 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Figures. (42 page(s), 8/13/2018)
- ML18249A154 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 15A, Operational Safety Analysis, Figures. (39 page(s), 8/13/2018)
- ML18249A155 - Brunswick Steam Electric Plant, Units 1 & 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 17A, Quality Assurance, Figures. (4 page(s), 8/13/2018)
- ML18249A158 - Duke Energy Transmittal of Topical Report DUKE-QAPD-001-A, Amendment 43. (154 page(s), 8/13/2018)
- ML18249A159 - Brunswick Steam Electric Plant, Unit 1, Technical Requirements Manual, Revision 73. (292 page(s), 8/13/2018)
- ML18249A160 - Brunswick Steam Electric Plant, Unit 2, Technical Requirements Manual, Revision 66. (293 page(s), 8/13/2018)