Home > NRC Library > ADAMS Public Documents
Interim Stabilization Plan for the American Nuclear Corporation Site in Wyoming
Accession Number: ML17278A065
Date Released: Monday, October 16, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17278A068 - American Nuclear Corporation (ANC) Tailings Pond #1 Interim Stabilization Plan Design Memorandum. (85 page(s), 10/2/2017)
- ML17278A076 - Project Drawings for Wyoming Department of Environmental Quality Land Quality Division American Nuclear Corporation (ANC) Tailings Pond #1 Interim Site Stabilization Plan. (1 page(s), 10/2/2017)
- ML17278A078 - American Nuclear Corporation TP-1 Interim Stabilization Plan - General Notes, Sheet No. G-002. (1 page(s), 8/29/2017)
- ML17278A079 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Site Overview, Sheet No. C-101. (1 page(s), 8/31/2017)
- ML17278A080 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Overall Site Grading Plan, Sheet No. C-102. (1 page(s), 9/18/2017)
- ML17278A081 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Interim Grading Plan, Sheet No. C-103. (1 page(s), 9/28/2017)
- ML17278A082 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Material Borrow Plan, Sheet No. C-104. (1 page(s), 9/28/2017)
- ML17278A083 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Cut and Fill Plan, Sheet No. C-105. (1 page(s), 9/18/2017)
- ML17278A084 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Borrow Area Grading Plan, Sheet No. C-106. (1 page(s), 9/28/2017)
- ML17278A085 - American Nuclear Corporation TP-1 Interim Stabilization Plan - TP-1 Cover Plan, Sheet No. C-107. (1 page(s), 9/28/2017)
- ML17278A086 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Willow Springs Draw Plan and Profile, Sheet No. C-201. (1 page(s), 9/28/2017)
- ML17278A087 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Drainage Plan and Profiles, Sheet No. C-202. (1 page(s), 9/28/2017)
- ML17278A089 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Drainage Channel Profiles, Sheet No. C-203. (1 page(s), 9/26/2017)
- ML17278A090 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Cross Sections, Sheet No. C-204. (1 page(s), 9/26/2017)
- ML17278A091 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Details, Sheet No. C-501. (1 page(s), 9/28/2017)
- ML17278A092 - American Nuclear Corporation TP-1 Interim Stabilization Plan - Details, Sheet No. C-502. (1 page(s), 9/28/2017)