Home > NRC Library > ADAMS Public Documents
Forwards 180 day response to NRC GL 95-07, "Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves" for plants.Pressure locking & thermal binding calculations for Quad-Cities also encl.
Accession Number: ML17187A311
Date Released: Monday, July 31, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17187A310 - Forwards 180 day response to NRC GL 95-07, "Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves" for plants.Pressure locking & thermal binding calculations for Quad-Cities also encl. (234 page(s), 2/13/1996)
- ML17187A312 - Rev 0 to "Pressure Locking Calculation for RHR Sys Valve MOV 1-1001-29A." (21 page(s), 11/9/1995)
- ML17187A313 - Rev 0 to "Pressure Locking Calculation for Core Spray Sys Valve MOV 1-1402-25A." (21 page(s), 11/9/1995)
- ML17187A314 - Rev 0 to "Pressure Locking Calculation for Core Spray Sys Valve 1-1402-25B." (21 page(s), 11/9/1995)
- ML17187A315 - Rev 0 to "Pressure Locking Calculation for RHR Sys Valve MOV 2-1001-29A." (21 page(s), 11/9/1995)
- ML17187A316 - Rev 0 to "Pressure Locking Calculation for RCIC Sys Valve MOV 1-1301-49." (17 page(s), 11/9/1995)
- ML17187A317 - Rev 0 to "Pressure Locking Calculation for RHR Sys Valve MOV 1-1001-29B." (19 page(s), 11/9/1995)
- ML17187A318 - Rev 0 to "Pressure Locking Calculation for HPCI Sys Valve MOV 1-2301-8." (17 page(s), 11/9/1995)
- ML17187A319 - Rev 0 to "Pressure Locking & Thermal Binding Review Guideline." (9 page(s), 10/31/1995)