Home > NRC Library > ADAMS Public Documents
South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report and Departures Report.
Accession Number: ML16137A173
Date Released: Thursday, June 30, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16137A174 - South Texas Project Units 3 & 4, Revision 13 to Departures Report, Table of Contents. (2 page(s), 4/5/2016)
- ML16137A175 - South Texas Project Units 3 & 4, Revision 13 to Departures Report, Chapter 1.0, Introduction. (4 page(s), 4/5/2016)
- ML16137A176 - South Texas Project Units 3 & 4, Revision 13 to Departures Report, Chapter 2.0, Departures Requiring Prior NRC Approval. (2 page(s), 4/5/2016)
- ML16137A177 - South Texas Project Units 3 & 4, Revision 13 to Departures Report, Chapter 2.1, Tier 1 and Tier 2* Departures from the DCD. (36 page(s), 4/5/2016)
- ML16137A178 - South Texas Project Units 3 & 4, Revision 13 to Departures Report, Chapter 2.2, Departures from the Generic Technical Specifications. (56 page(s), 4/5/2016)
- ML16137A179 - South Texas Project Units 3 & 4, Revision 13 to Departures Report, Chapter 2.3, Tier 2 Departures from DCD Requiring Prior NRC Approval. (2 page(s), 4/5/2016)
- ML16137A180 - South Texas Project Units 3 & 4, Revision 13 to Departures Report, Chapter 3.0, Departures Not Requiring Prior NRC Approval. (154 page(s), 4/5/2016)
- ML16137A181 - South Texas Project Units 3 & 4, Revision 13 to Departures Report, Chapter 4.0, Administrative Departures. (2 page(s), 4/5/2016)
- ML16137A213 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.5, Reactor Servicing Equipment. (2 page(s), 4/5/2016)
- ML16137A197 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.1, Nuclear Steam Supply Systems. (2 page(s), 4/5/2016)
- ML16137A193 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Table of Contents. (2 page(s), 4/5/2016)
- ML16137A194 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 1.0, Introduction. (2 page(s), 4/5/2016)
- ML16137A214 - South Texas Project, Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.6, Reactor Auxiliary Systems. (2 page(s), 4/5/2016)
- ML16137A212 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.4, Core Cooling Systems. (14 page(s), 4/5/2016)
- ML16137A210 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.2, Control and Instrument Systems. (12 page(s), 4/5/2016)
- ML16137A211 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.3, Radiation Monitoring Systems. (4 page(s), 4/5/2016)
- ML16137A196 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 1.2, General Provisions. (2 page(s), 4/5/2016)
- ML16137A195 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 1.1, Definitions. (2 page(s), 4/5/2016)
- ML16137A225 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.16, Yard Structures and Equipment. (2 page(s), 4/5/2016)
- ML16137A224 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.15, Structures and Servicing Systems. (10 page(s), 4/5/2016)
- ML16137A217 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.9, Radioactive Waste System. (2 page(s), 4/5/2016)
- ML16137A218 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.10, Power Cycle Systems. (4 page(s), 4/5/2016)
- ML16137A216 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.8, Nuclear Fuel. (2 page(s), 4/5/2016)
- ML16137A215 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.7, Control Panels. (8 page(s), 4/5/2016)
- ML16137A223 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.14, Containment and Environmental Control Systems. (6 page(s), 4/5/2016)
- ML16137A219 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.11, Station Auxiliary Systems. (4 page(s), 4/5/2016)
- ML16137A222 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.13, Power Transmission. (2 page(s), 4/5/2016)
- ML16137A221 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.12, Station Electrical Systems. (10 page(s), 4/5/2016)
- ML16137A235 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 4.2, Offsite Power System. (2 page(s), 4/5/2016)
- ML16137A227 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 3.1, Human Factors Engineering. (2 page(s), 4/5/2016)
- ML16137A231 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 3.5, Initial Test Program. (2 page(s), 4/5/2016)
- ML16137A226 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 2.17, Emergency Response Facilities. (2 page(s), 4/5/2016)
- ML16137A234 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 4.1, Ultimate Heat Sink. (2 page(s), 4/5/2016)
- ML16137A233 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 4.0, Interface Requirements. (2 page(s), 4/5/2016)
- ML16137A232 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 3.6, Design Reliability Assurance Program. (2 page(s), 4/5/2016)
- ML16137A228 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 3.2, Radiation Protection. (6 page(s), 4/5/2016)
- ML16137A229 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 3.3, Piping Design . (2 page(s), 4/5/2016)
- ML16137A230 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 3.4, Instrumentation and Control. (18 page(s), 4/5/2016)
- ML16137A203 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 4.8, Site Security. (2 page(s), 4/5/2016)
- ML16137A201 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 4.6, Turbine Service Water System. (2 page(s), 4/5/2016)
- ML16137A199 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 4.4, Potable and Sanitary Water System. (2 page(s), 4/5/2016)
- ML16137A202 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 4.7, Communication System. (2 page(s), 4/5/2016)
- ML16137A198 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 4.3, Makeup Water Preparation System. (2 page(s), 4/5/2016)
- ML16137A200 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 4.5, Reactor Service Water System. (2 page(s), 4/5/2016)
- ML16137A205 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 4.10, Heating, Ventilating and Air Conditioning System. (2 page(s), 4/5/2016)
- ML16137A204 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 4.9, Circulating Water System. (2 page(s), 4/5/2016)
- ML16137A207 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Appendix A, Legend for Figures. (2 page(s), 4/5/2016)
- ML16137A209 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Appendix C, Conversion to ASME Standard Units. (2 page(s), 4/5/2016)
- ML16137A208 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Appendix B, Abbreviations and Acronyms Used in the ABWR Certified Design Material. (4 page(s), 4/5/2016)
- ML16137A206 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 1, Chapter 5.0, Site Parameters. (4 page(s), 4/5/2016)
- ML16137A283 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.2, Requirements for Determination of ABWR Site Acceptability. (2 page(s), 4/5/2016)
- ML16137A276 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.0, Site Characteristics. (12 page(s), 4/5/2016)
- ML16137A261 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.4, Identification of Agents and Contractors. (6 page(s), 4/5/2016)
- ML16137A256 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Table of Contents. (8 page(s), 4/5/2016)
- ML16137A268 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.9S, Conformance with Regulatory Criteria. (28 page(s), 4/5/2016)
- ML16137A274 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1D, Negation Action Plan. (22 page(s), 4/5/2016)
- ML16137A273 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1C, ABWR Station Blackout Considerations. (10 page(s), 4/5/2016)
- ML16137A272 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1B, Not Used. (2 page(s), 4/5/2016)
- ML16137A264 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.7, Drawings. (6 page(s), 4/5/2016)
- ML16137A266 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.8S, Site Parameters, Interface Requirements, COL License Information Items, and Conceptual Design Information. (4 page(s), 4/5/2016)
- ML16137A275 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1E, Response to NRC Post-Fukushima Recommendations. (16 page(s), 4/5/2016)
- ML16137A259 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.2, General Plant Description. (14 page(s), 4/5/2016)
- ML16137A271 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1AA, Plant Shielding to Provide Access to Vital Areas and Protective Safety Equipment for Post-Accident Operation [II.B.2]. (4 page(s), 4/5/2016)
- ML16137A282 - South Texas Project, Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.0S, Site Characteristics. (38 page(s), 4/5/2016)
- ML16137A281 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.1, Limits Imposed on SRP Section II Acceptance Criteria by ABWR Standard Plant . (6 page(s), 4/5/2016)
- ML16137A270 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1A, Response to TMI Related Matters. (6 page(s), 4/5/2016)
- ML16137A267 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.9, COL License Information. (2 page(s), 4/5/2016)
- ML16137A260 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.3, Comparison Tables. (2 page(s), 4/5/2016)
- ML16137A262 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.5, Requirements for Further Technical Information. (2 page(s), 4/5/2016)
- ML16137A258 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.1, Introduction. (12 page(s), 4/5/2016)
- ML16137A263 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.6, GE Topical Reports and Other Documents. (2 page(s), 4/5/2016)
- ML16137A265 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.8, Conformance with Standard Review Plan and Applicability of Codes and Standards. (10 page(s), 4/5/2016)
- ML16137A269 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 1.10S, Impacts of Construction. (12 page(s), 4/5/2016)
- ML16137A287 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.1, Hydrolflogic Description. (30 page(s), 4/5/2016)
- ML16137A295 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.5S.2, Vibratory Ground Motion. (134 page(s), 4/5/2016)
- ML16137A288 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.2, Floods. (28 page(s), 4/5/2016)
- ML16137A304 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.14, Technical Specifications and Emergency Operation Requirements. (2 page(s), 4/5/2016)
- ML16137A302 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.12, Groundwater. (120 page(s), 4/5/2016)
- ML16137A284 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.2S, Nearby Industrial, Transportation, and Military Facilities. (72 page(s), 4/5/2016)
- ML16137A307 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Figure 2.5S.1-2, Site Vicinity Topographic Map (25-mile radius) - Figure 2.5S.1-9, Regional Mesozoic Stratigraphic Column. (8 page(s), 4/5/2016)
- ML16137A299 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.9, Channel Diversions. (18 page(s), 4/5/2016)
- ML16137A303 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.13, Accidental Releases of Radioactive Liquid Effluents in Ground and Surface Waters. (38 page(s), 4/5/2016)
- ML16137A293 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.6, Probable Maximum Tsunami Hazards. (44 page(s), 4/5/2016)
- ML16137A297 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.7, Ice Effects. (8 page(s), 4/5/2016)
- ML16137A286 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.3S, Meteorology. (168 page(s), 4/5/2016)
- ML16137A305 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.5S, Geology, Seismology, and Geotechnical Engineering. (4 page(s), 4/5/2016)
- ML16137A290 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.4, Potential Dam Failures. (74 page(s), 4/5/2016)
- ML16137A278 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Figure 2.5S.1-28 Site Area Geological Map (0.6-Mile Radius). (9 page(s), 4/5/2016)
- ML16137A289 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.3, Probable Maximum Flood (PMF) on Streams and Rivers. (46 page(s), 4/5/2016)
- ML16137A310 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Figure 2.5S.1-19, Quaternary Deposits of the Gulf Coastal Plain - Figure 2.5S.1-27, Site Area Geological Map (5-mile radius). (9 page(s), 4/5/2016)
- ML16137A298 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.8, Cooling Water Canals and Reservoirs. (6 page(s), 4/5/2016)
- ML16137A285 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.3, COL License Information. (8 page(s), 4/5/2016)
- ML16137A301 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.11, Low Water Considerations. (10 page(s), 4/5/2016)
- ML16137A294 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Figure 2.5S.1-46, Field Survey Elevation Profiles. (2 page(s), 4/5/2016)
- ML16137A291 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.5, Probable Maximum Surge and Seiche Flooding. (24 page(s), 4/5/2016)
- ML16137A279 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Figure 2.5S.1-37 Structure Contour Map of Stratum C (Silty Sand). (4 page(s), 4/5/2016)
- ML16137A280 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Figure 2.5S.1-41 Structure Contour Map of Stratum H (Silty Sand). (5 page(s), 4/5/2016)
- ML16137A309 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Figure 2.5S.1-10, Geologic Features of the Gulf Coast Region - Figure 2.5S.1-18, Gravity Anomaly and Depth to Base of Mesozoic Sediments. (9 page(s), 4/5/2016)
- ML16137A300 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.4S.10, Flooding Protection Requirements. (2 page(s), 4/5/2016)
- ML16137A306 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.5S.1, Basic Geologic and Seismic Information. (89 page(s), 4/5/2016)
- ML16137A339 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.12, Tunnels. (2 page(s), 4/5/2016)
- ML16137A331 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.6, Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping. (4 page(s), 4/5/2016)
- ML16137A338 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.11, Environmental Qualification of Safety-Related Mechanical and Electrical Equipment. (4 page(s), 4/5/2016)
- ML16137A324 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.5S.5, Stability of Slopes. (2 page(s), 4/5/2016)
- ML16137A328 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.3, Wind and Tornado Loadings. (2 page(s), 4/5/2016)
- ML16137A326 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.1, Conformance with NRC General Design Criteria. (4 page(s), 4/5/2016)
- ML16137A323 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Figure 2.5S.4-48C through Figure 2.5S.4-81. (49 page(s), 4/5/2016)
- ML16137A327 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.2, Classification of Structures, Components, and Systems. (12 page(s), 4/5/2016)
- ML16137A330 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.5, Missile Protection. (6 page(s), 4/5/2016)
- ML16137A325 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2A, Input to CRAC 2 Computer Code for Determination of ABWR Site Acceptability. (2 page(s), 4/5/2016)
- ML16137A315 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.5S.3, Surface Faulting. (12 page(s), 4/5/2016)
- ML16137A329 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.4, Water Level (Flood) Design. (12 page(s), 4/5/2016)
- ML16137A341 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.13, Secondary Containment and Divisional Separation Zones - Barrier Considerations. (2 page(s), 4/5/2016)
- ML16137A340 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.12S, Piping Design Review. (2 page(s), 4/5/2016)
- ML16137A334 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.8, Seismic Category I Structures. (24 page(s), 4/5/2016)
- ML16137A322 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 2.5S.4, Stability of Subsurface Materials and Foundation. (389 page(s), 4/5/2016)
- ML16137A332 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.7, Seismic Design. (36 page(s), 4/5/2016)
- ML16137A336 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.9S, Inservice Testing Program (OM-2004). (46 page(s), 4/5/2016)
- ML16137A335 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.9, Mechanical Systems and Components. (48 page(s), 4/5/2016)
- ML16137A337 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.10, Seismic and Dynamic Qualification of Mechanical and Electrical Equipment. (2 page(s), 4/5/2016)
- ML16137A357 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3M, Resolution of Intersystem Loss of Coolant Accident for ABWR. (4 page(s), 4/5/2016)
- ML16137A359 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 4.0, Reactor. (2 page(s), 4/5/2016)
- ML16137A355 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3K, Designated NEDE-24326-1-P Material Which May Not Change Without Prior NRC Staff Approval. (2 page(s), 4/5/2016)
- ML16137A342 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3.13S, Threaded Fasteners - ASME Code Class 1, 2, and 3. (2 page(s), 4/5/2016)
- ML16137A360 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 4.2, Fuel System Design. (2 page(s), 4/5/2016)
- ML16137A344 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3B, Containment Hydrodynamic Loads. (14 page(s), 4/5/2016)
- ML16137A345 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3C, Computer Programs Used in the Design and Analysis of Seismic Category I Structures. (6 page(s), 4/5/2016)
- ML16137A352 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3H, Figure 3H.6-140 through Figure 3H.11-12. (209 page(s), 4/5/2016)
- ML16137A348 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3F, Not Used. (2 page(s), 4/5/2016)
- ML16137A343 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3A, Seismic Soil Structure Interaction Analysis. (92 page(s), 4/5/2016)
- ML16137A349 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3G, Response of Structures to Containment Loads. (2 page(s), 4/5/2016)
- ML16137A346 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3D, Computer Programs Used in the Design of Components, Equipment and Structures. (2 page(s), 4/5/2016)
- ML16137A353 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3I, Equipment Qualification Environmental Design Criteria. (4 page(s), 4/5/2016)
- ML16137A354 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3J, Not Used. (2 page(s), 4/5/2016)
- ML16137A356 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3L, Evaluation of Postulated Ruptures in High Energy Pipes. (2 page(s), 4/5/2016)
- ML16137A347 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3E, Guidelines for LBB Application. (2 page(s), 4/5/2016)
- ML16137A351 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3H, Table 3H.7-1 through Figure 3H.6-139. (291 page(s), 4/5/2016)
- ML16137A358 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3MA, System Evaluation for ISLOCA. (24 page(s), 4/5/2016)
- ML16137A350 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 3H, Details and Evaluation Results of Seismic Category 1 Structures. (236 page(s), 4/5/2016)
- ML16137A361 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 4.3, Nuclear Design. (2 page(s), 4/5/2016)
- ML16137A362 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 4.4, Thermal-Hydraulic Design. (2 page(s), 4/5/2016)
- ML16137A365 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 4A, Typical Control Rod Patterns and Associated Power Distribution for ABWR. (2 page(s), 4/5/2016)
- ML16137A320 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 5.3, Reactor Vessel. (6 page(s), 4/5/2016)
- ML16137A319 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 5.2, Integrity of Reactor Coolant Pressure Boundary. (18 page(s), 4/5/2016)
- ML16137A316 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 4C, Control Rod Licensing Acceptance Criteria. (2 page(s), 4/5/2016)
- ML16137A366 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 4B, Fuel Licensing Acceptance Criteria. (2 page(s), 4/5/2016)
- ML16137A318 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 5.0, Reactor Coolant System and Connected Systems. (2 page(s), 4/5/2016)
- ML16137A317 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 4D, Reference Fuel Design Compliance with Acceptance Criteria. (2 page(s), 4/5/2016)
- ML16137A364 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 4.6, Functional Design of Reactivity Control System. (2 page(s), 4/5/2016)
- ML16137A363 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 4.5, Reactor Materials. (10 page(s), 4/5/2016)
- ML16137A416 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.6, All Other Instrumentation Systems Required for Safety. (20 page(s), 4/5/2016)
- ML16137A428 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 8.3, Onsite Power Systems. (28 page(s), 4/5/2016)
- ML16137A394 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 5B, RHR Injection Flow and Heat Capacity Analysis Outlines. (2 page(s), 4/5/2016)
- ML16137A405 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6B, SRP 6.5.1, Table 6.5.1-1 Compliance Assessment. (2 page(s), 4/5/2016)
- ML16137A422 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7A, Design Response to Appendix B, ABWR LRB Instrumentation and Controls. (22 page(s), 4/5/2016)
- ML16137A420 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.8S, Diverse Instrumentation and Control Systems. (2 page(s), 4/5/2016)
- ML16137A401 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6.5, Fission Products Removal and Control Systems. (2 page(s), 4/5/2016)
- ML16137A418 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.7, Control Systems Not Required for Safety. (58 page(s), 4/5/2016)
- ML16137A415 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.5, Information Systems Important to Safety. (12 page(s), 4/5/2016)
- ML16137A426 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 8.0, Electric Power. (6 page(s), 4/5/2016)
- ML16137A398 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6.2, Containment Systems. (78 page(s), 4/5/2016)
- ML16137A414 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.4, Systems Required for Safe Shutdown. (12 page(s), 4/5/2016)
- ML16137A393 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 5A, Method of Compliance for Regulatory Guide 1.150. (2 page(s), 4/5/2016)
- ML16137A429 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 8.4S, Station Blackout. (2 page(s), 4/5/2016)
- ML16137A427 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 8.2, Offsite Power Systems. (26 page(s), 4/5/2016)
- ML16137A431 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 9.0, Auxiliary Systems. (74 page(s), 4/5/2016)
- ML16137A400 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6.4, Habitability Systems. (2 page(s), 4/5/2016)
- ML16137A425 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7DS, Digital Instrumentation and Control Design Verification for Safety-Related Systems. (28 page(s), 4/5/2016)
- ML16137A408 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6E, Additional Bypass Leakage Considerations. (2 page(s), 4/5/2016)
- ML16137A417 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.6S, Interlock Systems Important to Safety. (2 page(s), 4/5/2016)
- ML16137A423 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7B, Implementation Requirements for Hardware/Software Development. (2 page(s), 4/5/2016)
- ML16137A403 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6.7, High Pressure Nitrogen Gas Supply System. (2 page(s), 4/5/2016)
- ML16137A410 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.0, Instrumentation and Control Systems. (20 page(s), 4/5/2016)
- ML16137A413 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.3, Engineered Safety Feature Systems, Instrumentation and Control. (38 page(s), 4/5/2016)
- ML16137A402 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6.6, Preservice and Inservice Inspection, and Testing of Class 2 and 3 Components and Piping. (8 page(s), 4/5/2016)
- ML16137A404 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6A, Regulatory Guide 1.52, Section C, Compliance Assessment. (2 page(s), 4/5/2016)
- ML16137A432 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 9.2, Water Systems. (96 page(s), 4/5/2016)
- ML16137A424 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7C, Defense Against Common-Mode Failure in Safety-Related, Software-Based I&C Systems. (6 page(s), 4/5/2016)
- ML16137A421 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.9S, Data Communication Systems. (12 page(s), 4/5/2016)
- ML16137A419 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.8, COL License Information. (4 page(s), 4/5/2016)
- ML16137A399 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6.3, Emergency Core Cooling Systems. (6 page(s), 4/5/2016)
- ML16137A411 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.1S, Instrumentation and Control Systems and Platforms. (10 page(s), 4/5/2016)
- ML16137A395 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6.0, Engineered Safety Features. (2 page(s), 4/5/2016)
- ML16137A406 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6C, Containment Debris Protection for ECCS Strainers. (20 page(s), 4/5/2016)
- ML16137A392 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 5.4, Components and Subsystem Design. (18 page(s), 4/5/2016)
- ML16137A396 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6.1, Engineered Safety Feature Materials. (2 page(s), 4/5/2016)
- ML16137A412 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 7.2, Reactor Protection (Trip) System (RPS)-Instrumentation and Controls. (22 page(s), 4/5/2016)
- ML16137A407 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 6D, HPCF Analysis Outlines. (2 page(s), 4/5/2016)
- ML16137A430 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 8A, Miscellaneous Electrical Systems. (4 page(s), 4/5/2016)
- ML16137A391 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 9D, SRP 6.5.1, Table 6.5.1-1 Compliance Assessment. (2 page(s), 4/5/2016)
- ML16137A436 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 9A, Fire Hazards Analysis. (164 page(s), 4/5/2016)
- ML16137A390 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 9C, Regulatory Guide 1.52, Section C, Compliance Assessment. (2 page(s), 4/5/2016)
- ML16137A439 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 10.0, Steam and Power Conversion System. (8 page(s), 4/5/2016)
- ML16137A434 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 9.4, Air Conditioning, Heating, cooling and Ventilating Systems. (36 page(s), 4/5/2016)
- ML16137A435 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 9.5, Auxiliary Systems. (30 page(s), 4/5/2016)
- ML16137A438 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 9E, Fire Related Administrative Controls. (22 page(s), 4/5/2016)
- ML16137A437 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 9B, Summary of Analysis Supporting Fire Protection Design Requirements. (2 page(s), 4/5/2016)
- ML16137A441 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 10.3, Main Steam Supply System. (6 page(s), 4/5/2016)
- ML16137A433 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 9.3, Process Auxilliaries. (10 page(s), 4/5/2016)
- ML16137A440 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 10.2, Turbine Generator. (22 page(s), 4/5/2016)
- ML16102A087 - South Texas Project, Units 3 and 4 - Submittal of Final Safety Analysis Report, Revision 13. (9 page(s), 4/5/2016)
- ML16139A911 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15.4, Reactivity and Power Distribution Anomalies. (2 page(s), 4/5/2016)
- ML16139A943 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 14.2, Specific Information to be Included in Final Safety Analysis Reports. (26 page(s), 4/5/2016)
- ML16139A942 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 14.1S, Specific Information to be Addressed for the Initial Plant Test Program. (2 page(s), 4/5/2016)
- ML16139A946 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 14.3S, Inspections, Tests, Analyses and Acceptance Criteria (ITAAC). (2 page(s), 4/5/2016)
- ML16139A941 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 14.0, Initial Test Program. (2 page(s), 4/5/2016)
- ML16139A918 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 11.2, Liquid Waste Management System. (26 page(s), 4/5/2016)
- ML16139A938 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 13.6, Physical Security. (2 page(s), 4/5/2016)
- ML16139A913 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15.6, Decrease in Reactor Coolant Inventory. (6 page(s), 4/5/2016)
- ML16139A922 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 11.6, Offsite Radiological Monitoring Program. (2 page(s), 4/5/2016)
- ML16139A935 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 13.4, Review and Audit. (2 page(s), 4/5/2016)
- ML16139A925 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 12.2, Radiation Sources. (48 page(s), 4/5/2016)
- ML16139A933 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 13.2, Training. (2 page(s), 4/5/2016)
- ML16139A950 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15.2, Increase in Reactor Pressure. (2 page(s), 4/5/2016)
- ML16139A939 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 13.7, Fitness for Duty. (2 page(s), 4/5/2016)
- ML16139A945 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 14.3, Tier 1 Selection Criteria and Processes. (2 page(s), 4/5/2016)
- ML16139A923 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 11A, Radioactive Waste Management - Additional Information. (2 page(s), 4/5/2016)
- ML16139A948 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15.1, Decrease in Reactor Coolant Temperature. (2 page(s), 4/5/2016)
- ML16139A914 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15.7, Radioactive Release from Subsystems and Components. (4 page(s), 4/5/2016)
- ML16139A949 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15.1S, Transient and Accident Classification. (2 page(s), 4/5/2016)
- ML16139A928 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 12.5, Health Physics Program. (2 page(s), 4/5/2016)
- ML16139A932 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 13.0, Conduct of Operations. (22 page(s), 4/5/2016)
- ML16139A927 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 12.4, Dose Assessment. (4 page(s), 4/5/2016)
- ML16139A920 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 11.4, Solid Waste Management System. (20 page(s), 4/5/2016)
- ML16139A930 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 12A, Appendix 12A Calculation of Airborne Radionuclides. (2 page(s), 4/5/2016)
- ML16139A916 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 10.4, Other Features of Steam and Power Conversion. (30 page(s), 4/5/2016)
- ML16139A937 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 13.5, Plant Procedures. (14 page(s), 4/5/2016)
- ML16139A931 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 12B, Spent Fuel Pool Geometry and Dose Rate Calculation. (14 page(s), 4/5/2016)
- ML16139A929 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 12.5S, Operational Radiation Protection Program. (2 page(s), 4/5/2016)
- ML16139A915 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15.8, Anticipated Transients Without Scram. (2 page(s), 4/5/2016)
- ML16139A926 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 12.3, Radiation Protection Design Features. (22 page(s), 4/5/2016)
- ML16139A951 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15.3, Decrease in Reactor Coolant System Flow Rate. (2 page(s), 4/5/2016)
- ML16139A934 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 13.3, Emergency Planning. (2 page(s), 4/5/2016)
- ML16139A912 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15.5, Increase in Reactor Coolant Inventory. (2 page(s), 4/5/2016)
- ML16139A924 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 12.0, Radiation Protection. (4 page(s), 4/5/2016)
- ML16139A921 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 11.5, Process and Effluent Radiological Monitoring and Sampling Systems. (18 page(s), 4/5/2016)
- ML16139A940 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 14.0S, Verification Programs. (2 page(s), 4/5/2016)
- ML16139A947 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15.0, Accident and Analysis. (2 page(s), 4/5/2016)
- ML16139A917 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 11.0, Radioactive Waste Management. (2 page(s), 4/5/2016)
- ML16139A936 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 13.4S, Operational Program Implementation. (10 page(s), 4/5/2016)
- ML16139A944 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 14.2S, Initial Plant Test Program. (10 page(s), 4/5/2016)
- ML16139A919 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 11.3, Gaseous Waste Management System. (16 page(s), 4/5/2016)
- ML16139A976 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18B, Differences Between BWROG EPG Revision 4 and ABWR EPG. (4 page(s), 4/5/2016)
- ML16139A955 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15D, Probability Analysis of Pressure Regulator Downscale Failure. (2 page(s), 4/5/2016)
- ML16139A957 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15F, LOCA Inventory Curves. (2 page(s), 4/5/2016)
- ML16139A984 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.1S, Additional Information to Support the COL Application (24 page(s), 4/5/2016)
- ML16139A977 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18C, Operator Interface Equipment Characterization (4 page(s), 4/5/2016)
- ML16139A989 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.5, Source Term Sensitivity Studies. (2 page(s), 4/5/2016)
- ML16139A975 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18A, Emergency Procedure Guidelines. (4 page(s), 4/5/2016)
- ML16139A987 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.4, External Event Analysis and Shutdown Risk Analysis. (4 page(s), 4/5/2016)
- ML16139A983 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.0, Response to Severe Accident Policy Statement. (2 page(s), 4/5/2016)
- ML16139A972 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18.6, Systems Integration. (2 page(s), 4/5/2016)
- ML16139A997 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.13, Summary of Insights Gained from the PRA. (2 page(s), 4/5/2016)
- ML16139A964 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 17.4S, Reliability Assurance Program. (16 page(s), 4/5/2016)
- ML16139A981 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18G, Design Development and Validation Testing. (2 page(s), 4/5/2016)
- ML16139A993 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.9, COL License Information. (16 page(s), 4/5/2016)
- ML16139A998 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19A Response to CP/ML Rule 10 CFR 50.34(f). (6 page(s), 4/5/2016)
- ML16139A952 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15A, Plant Nuclear Safety Operational Analysis (NSOA). (24 page(s), 4/5/2016)
- ML16139A954 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15C, Not Used. (2 page(s), 4/5/2016)
- ML16139A969 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18.3, Planning, Development, and Design. (2 page(s), 4/5/2016)
- ML16139A985 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.2, Introduction. (40 page(s), 4/5/2016)
- ML16139A988 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.4S, PRA Maintenance. (4 page(s), 4/5/2016)
- ML16139A982 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18H, Supporting Analysis for Emergency Operation Information and Controls. (2 page(s), 4/5/2016)
- ML16139A994 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.10, Assumptions and Insights Related to Systems Outside of ABWR Design Certification. (2 page(s), 4/5/2016)
- ML16139A996 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.12, Input to the Reliability Assurance Program. (2 page(s), 4/5/2016)
- ML16139B000 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19C, Design Considerations Reducing Sabotage Risk. (2 page(s), 4/5/2016)
- ML16139A962 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 17.2, Quality Assurance During the Operations Phase. (2 page(s), 4/5/2016)
- ML16139A992 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.8, Important Features Identified by the ABWR PRA. (6 page(s), 4/5/2016)
- ML16139A980 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18F, Emergency Operation Information and Controls. (2 page(s), 4/5/2016)
- ML16139A971 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18.5, Remote Shutdown System. (2 page(s), 4/5/2016)
- ML16139A990 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.6, Measurement Against Goals. (2 page(s), 4/5/2016)
- ML16139A991 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.7, PRA as a Design Tool. (2 page(s), 4/5/2016)
- ML16139A973 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapeter 18.7, Detailed Design of the Operator Interface System (2 page(s), 4/5/2016)
- ML16139A966 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 17.6S, Maintenance Rule Program. (2 page(s), 4/5/2016)
- ML16139A968 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18.2, Design Goals and Design Bases. (2 page(s), 4/5/2016)
- ML16139B001 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19D, Probabilistic Evaluations. (2 page(s), 4/5/2016)
- ML16139A965 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 17.5S, Quality Assurance Program Guidance. (2 page(s), 4/5/2016)
- ML16139A958 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 16.0, Technical Specifications. (2 page(s), 4/5/2016)
- ML16139A986 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.3, Internal Event Analysis. (6 page(s), 4/5/2016)
- ML16139B002 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19E, Deterministic Evaluations. (20 page(s), 4/5/2016)
- ML16139A960 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 17.1, Quality Assurance During Design and Construction. (2 page(s), 4/5/2016)
- ML16139A953 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15B, Failure Modes and Effects Analysis (FMEA). (4 page(s), 4/5/2016)
- ML16139A967 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18.0, Human Factors Engineering. (2 page(s), 4/5/2016)
- ML16139A978 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18D, Emergency Procedures Guidelines - Input Data and Calculation Results (2 page(s), 4/5/2016)
- ML16139A970 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18.4, Control Room Standard Design Features. (4 page(s), 4/5/2016)
- ML16139A974 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18.8, COL License Information. (6 page(s), 4/5/2016)
- ML16139A959 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 17, Quality Assurance. (2 page(s), 4/5/2016)
- ML16139A995 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19.11, Human Action Overview. (2 page(s), 4/5/2016)
- ML16139A956 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 15E, ATWS Performance Evaluation. (4 page(s), 4/5/2016)
- ML16139A999 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19B, Resolution of Applicable Unresolved Safety Issues and Generic Safety Issues. (8 page(s), 4/5/2016)
- ML16139A963 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 17.3, Reliability Assurance Program During Design Phase. (2 page(s), 4/5/2016)
- ML16139A979 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 18E, ABWR Human-System Interface Design Implementation Process. (2 page(s), 4/5/2016)
- ML16139B041 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 14. (23 page(s), 4/5/2016)
- ML16139B006 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19ED, Corium Shield. (2 page(s), 4/5/2016)
- ML16139B035 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 08. (29 page(s), 4/5/2016)
- ML16139B016 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19M, Fire Protection Probabilistic Assessment. (4 page(s), 4/5/2016)
- ML16139B042 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 15. (13 page(s), 4/5/2016)
- ML16139B032 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 05. (28 page(s), 4/5/2016)
- ML16139B009 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19FA, Containment Ultimate Strength. (2 page(s), 4/5/2016)
- ML16139B007 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19EE, Suppression Pool Bypass. (2 page(s), 4/5/2016)
- ML16139B019 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19P, Evaluation of Potential Modifications to the ABWR Design. (2 page(s), 4/5/2016)
- ML16139B033 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 06. (25 page(s), 4/5/2016)
- ML16139B004 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19EB, Fuel Coolant Interactions. (2 page(s), 4/5/2016)
- ML16139B030 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 03. (28 page(s), 4/5/2016)
- ML16139B015 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19L, ABWR Shutdown Risk Evaluation. (6 page(s), 4/5/2016)
- ML16139B013 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19J, Not Used. (2 page(s), 4/5/2016)
- ML16139B011 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19H, Seismic Capacity Analysis. (4 page(s), 4/5/2016)
- ML16139B044 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 17. (20 page(s), 4/5/2016)
- ML16139B036 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 09. (19 page(s), 4/5/2016)
- ML16139B034 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 07. (21 page(s), 4/5/2016)
- ML16139B045 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 18. (15 page(s), 4/5/2016)
- ML16139B038 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 11. (24 page(s), 4/5/2016)
- ML16139B037 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 10. (20 page(s), 4/5/2016)
- ML16139B048 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 21. (15 page(s), 4/5/2016)
- ML16139B023 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19QC, Review of Significant Shutdown Events: Electrical Power and Decay Heat Removal. (2 page(s), 4/5/2016)
- ML16139B027 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21.0, Large-Scale Drawings. (18 page(s), 4/5/2016)
- ML16139B003 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19EA, Direct Containment Heating. (2 page(s), 4/5/2016)
- ML16139B039 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 12. (9 page(s), 4/5/2016)
- ML16139B022 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19QB, DHR Reliability Study. (2 page(s), 4/5/2016)
- ML16139B024 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19R, Probabilistic Flooding Analysis. (24 page(s), 4/5/2016)
- ML16139B031 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 04. (28 page(s), 4/5/2016)
- ML16139B008 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19F, Containment Ultimate Strength. (2 page(s), 4/5/2016)
- ML16139B040 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 13. (29 page(s), 4/5/2016)
- ML16139B028 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 01. (15 page(s), 4/5/2016)
- ML16139B025 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19S, Aircraft Impact Assessment. (2 page(s), 4/5/2016)
- ML16139B020 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19Q, ABWR Shutdown Risk Assessment. (12 page(s), 4/5/2016)
- ML16139B014 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19K, PRA-Based Reliability And Maintenance. (18 page(s), 4/5/2016)
- ML16139B046 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 19. (28 page(s), 4/5/2016)
- ML16139B012 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19I, Seismic Margins Analysis. (2 page(s), 4/5/2016)
- ML16139B010 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19G, Not Used. (2 page(s), 4/5/2016)
- ML16139B018 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19O, Not Used. (2 page(s), 4/5/2016)
- ML16139B021 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19QA, Fault Trees. (2 page(s), 4/5/2016)
- ML16139B026 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 20.0, Question and Response Guide. (2 page(s), 4/5/2016)
- ML16139B043 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 16. (22 page(s), 4/5/2016)
- ML16139B017 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19N, Analysis of Common-Cause Failure of Essential Communications Equipment. (18 page(s), 4/5/2016)
- ML16139B029 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 02. (16 page(s), 4/5/2016)
- ML16139B047 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 21, Part 20. (21 page(s), 4/5/2016)
- ML16139B005 - South Texas Project Units 3 & 4, Revision 13 to Final Safety Analysis Report, Tier 2, Chapter 19EC, Debris Coolability and Core Concrete Interaction. (2 page(s), 4/5/2016)