Accession Number: ML13247A157
Date Released: Monday, September 23, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12032A047 - FOIA/PA-2012-0121 - Redacted - Any and all records pertaining to the cracking in the concrete shield building/secondary radiological containment structure on October 11, 2011 (5 page(s), 2/26/2012)
- ML12200A199 - E-mail from T. Lupold, NRR to A. Rezai, NRR RE: Davis Besse SB extent of condition. (1 page(s), 11/10/2011)
- ML12200A201 - Discussion points relayed to-the licensee after our internal technical discussion. (1 page(s), 11/12/2011)
- ML12200A198 - E-mail from P. Hernandez, NRR to R. Auluck, NRR et al. Re: Davis Besse Shield Building teleconference. (1 page(s), 11/9/2011)
- ML11336A355 - Ltr 12/2/2011 Davis-Besse CAL 3-11-001. (5 page(s), 12/2/2011)
- ML12200A213 - Email from A. Sheikh, NRR to E. Sanchez Santiago, RilI on Questions for the Conference Call. (1 page(s), 11/22/2011)
- ML12200A189 - Email from P. Hernandez, NRR to E. Thomas, NRR on Davis Besse Shield Building Issue. (1 page(s), 10/21/2011)
- ML11292A005 - G20110747/LTR-11-0568/EDATS: SECY-2011-0556 - Ltr. Rep. Edward J. Markey re: Safe Operation of the Davis-Besse Nuclear Power Plant. (4 page(s), 10/14/2011)
- ML12200A206 - E-mail from P. Hernandez, NRR to M. Evans, NRR et al. RE: Updated Davis-Besse Containment Shield Building POP. (1 page(s), 11/15/2011)
- ML12200A207 - E-mail from P. Hernandez, NRR to M. Evans, NRR et al. on Davis Besse Call Summary. (1 page(s), 11/15/2011)
- ML12200A218 - Email from J. Zimmerman, NRR to D. Hills, Rill on NSLAOrdersCommPlan. (5 page(s), 11/23/2011)
- ML12018A338 - Davis-Besse, Unit 1, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 23. (10 page(s), 1/13/2012)
- ML11294A349 - 2011/10/12 Davis-Besse LR - FW: Davis-Besse Commitment List through LRA Amendment 19 (60 page(s), 10/12/2011)
- ML12200A185 - Email from J. Zimmerman, NRR to P. Hernandez, NRR Re: FYI - Davis Besse Shield Building Issue Update. (1 page(s), 10/18/2011)
- ML12019A378 - 2012/01/10 Davis-Besse LR - Davis Besse 5 Open Items (7 page(s), 1/10/2012)
- ML12010A172 - Motion for Admission of Contention No. 5 on Shield Building Cracking. (61 page(s), 1/10/2012)
- ML12200A196 - E-mail from P. Hernandez, NRR to R. Auluck, NRR on Davis Besse questions for licensee. (1 page(s), 11/8/2011)
- ML12200A203 - E-mail from P. Hernandez, NRR to J. Zimmerman, NRR on Draft e-mail. (1 page(s), 11/15/2011)
- ML12200A208 - E-mail from P. Hernandez, NRR to R. Auluck, NRR et al., on Davis Besse conf call. (1 page(s), 11/16/2011)
- ML12200A215 - Email from A. Howe, NRR to M. Evans, NRR et al., on Call with Steve West on Davis Besse. (1 page(s), 11/23/2011)
- ML12004A010 - Davis-Besse Public Meeting NRC Slides. (24 page(s), 1/4/2012)
- ML12200A222 - Email from R. Haskell, NRR on New OpE Forum Possting: Davis Besse - Cracks Discovered in Shield Building During Reactor Vessel Head Replacement. (1 page(s), 12/1/2011)
- ML12200A187 - Email from T. Lupold, NRR to A. Rezai, NRR RE: Davis Besse Shield Building Call. (1 page(s), 10/19/2011)
- ML120050146 - Davis-Besse Public Meeting FENOC Slides. (41 page(s), 1/5/2012)
- ML12200A202 - E-mail from W. Jessup, NRR to M. Murphy, NRR on November 13, 2011 Davis-Besse External Call. (1 page(s), 11/14/2011)
- ML12200A192 - Email from P. Hernandez, NRR to E. Sanchez Santiago, Rill on Questions about Davis Besse Shield Building Report from DORL. (2 page(s), 11/4/2011)
- ML12200A184 - Email from P. Hernandez, NRR to J. Zimmerman, NRR RE: 2011-10-13, POP - Davis-Besse Containment Shield Building. (1 page(s), 10/14/2011)
- ML12200A214 - Email from A. Howe, NRR to S. West, Rill et al. on Where do we stand on Davis Besse? (1 page(s), 11/23/2011)
- ML12200A219 - Email from J. Zimmerman, NRR to M. Evans, NRR Re: Davis-Besse Draft CAL. (2 page(s), 11/27/2011)
- ML12200A212 - Davis-Besse Nuclear Power Station Containment Shield Building Issue. (8 page(s), 11/21/2011)
- ML11332A094 - G20110823/LTR-11-0620/EDATS: SECY-2011-0631 - Ltr from Rep. Dennis J. Kucinich re: Cracks in the Concrete Wall of the Shield Building of the Davis-Besse Power Plant. (7 page(s), 11/21/2011)
- ML12200A195 - Davis Besse Shield Building Issue NRC Technical Reviewer Focus Questions. (1 page(s), 11/7/2011)
- ML11348A043 - Email -- Davis-Besse SB Crack RC Investigation RFI. (2 page(s), 12/12/2011)
- ML12200A200 - E-mail from J. Zimmerman, NRR to M. Evans, NRR re: DB shield building. (1 page(s), 11/11/2011)
- ML12200A188 - Email from P. Hernandez, NRR to J. Zimmerman, NRR RE: GT. (1 page(s), 10/20/2011)
- ML11356A037 - 2011/11/30 Davis-Besse LR - DB RAI response letters 1 of 2 (775 page(s), 11/30/2011)
- ML12200A190 - Email from P. Hernandez, NRR to R. Auluck, NRR et al., on Davis Besse SB Dist Group. (3 page(s), 10/28/2011)
- ML12200A211 - Email from P. Hernandez, NRR to M. Evans, NRR et al., on Davis Besse Operability Question. (2 page(s), 11/17/2011)
- ML12200A255 - FOIA/PA-2012-0121 - Resp 1 - Partial. (7 page(s), 6/12/2012)
- ML12019A376 - 2012/01/10 Davis-Besse LR - FW: Davis-Besse Shield Building Confirmatory Action Letter (CAL No. 3-11-001) (7 page(s), 1/10/2012)
- ML12200A224 - Email from D. Morey, NRR to S. CuadradoDeJesus, NRR Re: Davis-Besse Shield Building. (1 page(s), 12/1/2011)
- ML11329A085 - Ltr 11/23/11 Acknowledgement Letter to Mr. Lochbaum Regarding Questions About the Shield Building Design at Davis-Besse. (2 page(s), 11/23/2011)
- ML12200A186 - Email from S. CuardadoDeJesus, NRR to R. Auluck, NRR et al. on Davis-Besse Shield Building Issue Summary. (2 page(s), 10/18/2011)
- ML113360416 - 12/15/2011 Notice of Public Meeting with First Energy Nuclear Operating Company to Discuss Their Technical Analysis Regarding Cracking Identified in the Davis-Besse Shield Building. (3 page(s), 12/2/2011)
- ML12200A197 - E-mail from J. Zimmerman, NRR to P. Hernandez, NRR Query: Letter from UCS. (1 page(s), 11/9/2011)
- ML113560164 - 01/05/2012 Meeting Notice with Davis-Besse to Discuss Present the Results of its Evaluation of Shield Building Cracking and for the NRC to Present the Results of its Independent Assessment of that Evaluation. (4 page(s), 12/22/2011)
- ML12200A221 - Email from B. Lehman, NRR to S. CuadradoDeJesus, NRR RE: Shield Building Discussion with Melanie Next Week. (1 page(s), 11/28/2011)
- ML12200A183 - Davis-Besse Nuclear Power Plant, Unit Licensing Basis Seismic Ground Motion Concern. (3 page(s), 6/12/2012)
- ML12200A210 - Davis-Besse Containment System Primary Steel Containment an Shield Building. (1 page(s), 11/17/2011)
- ML12200A223 - Email from B. Lehman, NRR to A. Sheikh, NRR et al., on Davis-Besse Shield Building. (1 page(s), 12/1/2011)
- ML12200A209 - Email from P. Hernandez, NRR to E. Sanchez Santiago, Rill on Davis Besse Operability question. (1 page(s), 11/17/2011)
- ML12200A249 - Presentation Slides on Shield Building /Containment Delamination. (11 page(s), 12/22/2011)
- ML12200A243 - Email from M. Galloway, NRR to A. Sheikh, NRR et al., RE: Davis-Besse Shield Building. (1 page(s), 12/13/2011)
- ML12200A245 - Email from P. Hernandez, NRR to E. Sanchez Santiago, Rill et al., FW: ET/LT Brief 12-22-11 - Containment Delamination Davis-Besse/ CR-3. (1 page(s), 12/14/2011)
- ML12200A226 - Email from B. Lehman, NRR to S. Sakai, NRR et al. FW: Davis Besse POP. (2 page(s), 12/2/2011)
- ML12200A251 - Davis-Besse Root Cause Review - Status Call 1/19/2012. (3 page(s), 1/19/2012)
- ML12200A238 - Email from B. Lehman, NRR to S. Sakai, NRR et al., on Davis-Besse Shield Building Brief- Lehman.pptx. (1 page(s), 12/5/2011)
- ML12200A247 - Email from P. Hernandez, NRR to A. Erickson, NRR, FW: ET/LT Brief 12-22-11 - Containment Delamination Davis-Besse/ CR-3. (5 page(s), 12/15/2011)
- ML12200A228 - Email from V. Mitlyng, Rill to T. Briley, Rill et al. on Davis-Besse coverage. (3 page(s), 12/5/2011)
- ML12200A240 - Presentation Slides on Davis-Besse Shield Building Crack. (6 page(s), 2/23/2012)
- ML12200A241 - Email from M. Murphy, NRR to W. Jessup, NRR et al., FW: ET Significant Topic: Containment Delamination. (2 page(s), 12/8/2011)
- ML12200A250 - Email from D. Morey, NRR to M. Galloway, NRR et al., FW: Summary of Meeting With OGC to Discuss Davis Besse's New Contention on the Shield Building Crack. (2 page(s), 1/12/2012)
- ML12200A253 - Email from P. Hiland, NRR to M. Murphy, NRR RE: Without the Root Cause. (1 page(s), 1/19/2012)
- ML12200A227 - Email from J. Zimmerman, NRR to M. Evans, NRR et al. Fw: Press Release has been issued. Attachment is publicly available. (3 page(s), 12/3/2011)
- ML12200A239 - E-mail from B. Lehman, NRR to S. Sakai, NRR et al., on Davis-Besse Shield Building Brief- Lehman. (1 page(s), 12/6/2011)
- ML12200A244 - Email from A. Sheikh, NRR to B. Lehman, NRR et al RE: Davis-Besse Shield Building RAI. (2 page(s), 12/13/2011)
- ML12200A242 - Email from M. Murphy, NRR to C. Roquecruz, NRR RE: G20110823 - Cracks in the Concrete Wall of the Shield Building of the Davis-Besse Power Plant. (1 page(s), 12/13/2011)
- ML12200A246 - Email from R. Auluck, NRR to S CuadradoDeJesus, NRR et al., on DB Containment Crack RAI Abdul-RA. (2 page(s), 12/14/2011)
- ML12200A254 - Davis-Besse Root Cause Review - Status Call 1-26-2012. (3 page(s), 1/26/2012)
- ML12200A225 - Email from D. Morey, NRR to B. Lehman, NRR et al RE: Davis-Besse Shield Building. (1 page(s), 12/2/2011)
- ML070850183 - NUREG/CR-6927 "Primer on Durability of Nuclear Power Plant Reinforced Concrete Structures - A Review of Pertinent Factors." (130 page(s), 2/28/2007)
- ML11329A033 - Documentation of Commitments for the Davis-Besse Nuclear Power Station, Unit 1 (4 page(s), 11/23/2011)
- ML113360677 - Press Release-iiii-11-036: NRC Concludes Davis-Besse Nuclear Plant Safe to Restart and Issues Confirmatory Action Letter (5 page(s), 12/2/2011)
- ML11293A092 - PNO-III-11-014, Davis-Besse Shield Building Indications. (4 page(s), 10/20/2011)
- ML11294A331 - 2011/10/11 Davis-Besse LR - FW: FENOC Letter L-11-292 Davis-Besse License Renewal RAI Responses (73 page(s), 10/11/2011)
- ML11307A318 - G20110747/LTR-11-0568/EDATS: SECY-2011-0556 - Ltr. to Rep. Edward J. Markey from Chairman Jaczko re: Safe Operation of the Davis-Besse Nuclear Power Plant (1 page(s), 11/9/2011)
- ML112070867 - Containment Liner Corrosion Operating Experience Summary Technical Letter Report - Revision 1. (56 page(s), 8/2/2011)
- ML12198A073 - FOIA/PA-2012-0121 - Resp 2 - Partial. (3 page(s), 7/12/2012)
- ML11318A021 - Davis-Besse, Unit 1, Reply to Request for Additional Information for the Review of License Renewal Application. (4 page(s), 11/9/2011)
- ML11333A396 - Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station License Renewal Application (TAC No. ME4640). (9 page(s), 12/27/2011)
- ML113320148 - Documentation of Commitments for the Davis-Besse Nuclear Power Station, Unit 1. (3 page(s), 11/23/2011)
- ML12213A354 - E-mail from P. Hernandez to M. Hamm, Subject; RE: DB Containment (system) Writeup. (2 page(s), 11/18/2011)
- ML12213A370 - E-mail from M. Holmberg to S. CuadradoDeJesus, Subject: RE: Status Call Results - DB SB Cracking. (2 page(s), 1/23/2012)
- ML12213A352 - E-mail from E. Sanchez Santiago to M. Murphy, et al, Subject: FW: Davis Besse Shield Building: Technical Review Discussion Items. (2 page(s), 11/16/2011)
- ML12213A353 - Davis-Besse Shield Building Laminar Cracking. (12 page(s), 11/15/2011)
- ML12213A360 - E-mail from J. Neurauter to W. Jessup, et al, Subject: RE: Davis-Besse Functionality Review Criteria Summary. (3 page(s), 12/15/2011)
- ML12213A348 - Table of Contents to Isolated Crack Indication Identified by Impulse Response Testing of the Shield Building. (16 page(s), 10/28/2011)
- ML12213A340 - E-mail from S. CuadradoDeJesus to B. Jose, et al, RE: Daily Morning Meeting Minutes - October 11 th - 2011 - Forgot Davis-Besse Text in Original. (1 page(s), 10/11/2011)
- ML12213A332 - Questions on CR-2011-03346 (Mold Hold Restraint). (3 page(s), 7/27/2012)
- ML12213A378 - White Paper: Review of Technical Report No: 25539-200-COR-0000-00001, Structural Evaluation of Shield Building, Davis-Bess Nuclear Plant. (3 page(s), 7/27/2012)
- ML12213A377 - E-mail from P. Cooper to P. Chandrathil, et al, Subject: Re: Davis-Besse Draft SEIS is delayed. (4 page(s), 1/26/2012)
- ML12213A355 - E-mail from J. Zimmerman to M. Evans, et al, Subject: FYI: Davis-Besse Draft CAL. (4 page(s), 11/26/2011)
- ML12213A342 - E-mail from T. Lupold to P. Hiland, et al, FW: Davis-Besse Shield Building Crack (Identified During RPV Head Replacement). (3 page(s), 10/12/2011)
- ML12213A356 - E-mail from P. Hernandez to E. Sanchez-Santiago, Subject:FW: C-1 11A Drawing Inconsistency? (1 page(s), 11/29/2011)
- ML12213A364 - E-mail from A. Stone to S. CuadradoDeJesus, et al, Subject: RE: Davis Besse Shield Building - License Renewal. (5 page(s), 1/17/2012)
- ML12213A362 - E-mail from J. Neurauter to M. Murphy, et al, Subject: Davis Besse shield building issue documents. (1 page(s), 1/4/2012)
- ML12213A350 - E-mail from E. Sanchez Santiago to M. Murphy, et al, Subject: FW: NRC Technical Reviewer Focus Questions. (2 page(s), 11/9/2011)
- ML12213A334 - SB-0034 - Bechtel Response to Calculation C-CSS-099.20-054, Revision 0. (1 page(s), 7/27/2012)
- ML12213A346 - E-mail from A. Sheikh to S. CuadradoDeJesus, et al,: RE: DB Presentation. (1 page(s), 10/18/2011)
- ML12213A349 - E-mail from E. Sanchez Santiago to M. Murphy, et al, Subject: 11-2-2011 Conference Call Summary. (1 page(s), 11/4/2011)
- ML12213A367 - E-mail from M. Holmberg to S. CuadradoDeJesus, Subject: RE: Davis Besse Shield Building - License Renewal. (3 page(s), 1/18/2012)
- ML12213A366 - E-mail from P. Hernandez to S. CuadradoDeJesus, Subject: RE: Davis Besse Shield Building. (2 page(s), 1/18/2012)
- ML12213A343 - E-mail from D. Hills to T. Lupold, et al, RE: Davis-Besse Shield Building Crack (Identified During RPV Head Replacement. (3 page(s), 10/12/2011)
- ML12213A386 - FOIA/PA-2012-0121 - Resp 3 - Partial. (1 page(s), 7/27/2012)
- ML12213A338 - Communications Plan - Reactor Pressure Vessel Head Replacement. (12 page(s), 10/31/2011)
- ML12213A376 - E-mail from B. Jose to S. CuadradoDeJesus, et al, Subject: FW: Davis-Besse Draft SEIS is delayed. (1 page(s), 1/26/2012)
- ML12213A374 - E-mail from M. Holmberg to S. CuadradoDeJesus, Subject Bridge line for Thursdays Call? (1 page(s), 1/25/2012)
- ML12213A336 - C-CSS-099.20054, Rev. 000. (3 page(s), 7/27/2012)
- ML12213A375 - E-mail from D. Morey to A. Stone, et al, Subject: RE: Decision on releasing draft SER. (1 page(s), 1/26/2012)
- ML12213A351 - Davis-Besse Nuclear Power Station Containment Shield Building Issue. (2 page(s), 11/10/2011)
- ML12213A357 - E-mail from S. Sakai to A. Erickson, Subject: FW: Licensee Projected Timeline. (2 page(s), 12/2/2011)
- ML12213A365 - E-mail from D. Hills to S. CuadradoDeJesus, et al, Subject: RE: Davis Besse Shield Building - License Renewal. (5 page(s), 1/17/2012)
- ML12213A380 - E-Mail from E. Sanchez-Santiago, RIII, to M. Murphy, NRO/DORL, et. Al., Subject: FW: Davis Besse Shield Building Technical Review Discussion Items (2 page(s), 11/16/2011)
- ML12213A368 - E-mail from M. Holmberg to S. CuadradoDeJesus, et al, Subject: RE: Status Call Results - DB SB Cracking. (2 page(s), 1/20/2012)
- ML12213A333 - SB-0033 - Calculation C-CSS-099.20-054, Revision 0. (4 page(s), 7/27/2012)
- ML12213A335 - Review of Technical Assessment Report No. 25539-200 COR-0000-00001. (2 page(s), 7/27/2012)
- ML12213A344 - E-mail from S. Cuadrado DeJesus to R. Auluck, et al, FW: Davis-Besse Plant to Contact Media. (1 page(s), 10/12/2011)
- ML12213A337 - SB-00-20: CR-2011-03346 Evaluation. (5 page(s), 7/27/2012)
- ML12213A381 - E-Mail from E. Sanchez-Santiago, RIII to M. Murphy, NRO/DORL, et. Al., Subject: Davis Besse shield building issue evaluation. (1 page(s), 11/21/2011)
- ML12213A379 - E-Mail from V. Meghani, RIII, to H. Graves, RES/DE/SGSEB, et. Al., Subject: RE: Davis Besse shield building cracks. (1 page(s), 11/14/2011)
- ML12213A363 - E-mail from R. Auluck to D. Hills, et al, Subject: RE: Davis Besse Shield Building - License Renewal. (5 page(s), 1/17/2012)
- ML12213A359 - E-mail from V. Mitlyng to T. Briley, et al, Subject: PRESS RELEASE HAS BEEN ISSUED. (1 page(s), 12/2/2011)
- ML12213A341 - E-mail from S. Cuadrado DeJesus to A. Sheikh, et al, FW: Davis-Besse Shield Building Crack. (2 page(s), 10/11/2011)
- ML12213A369 - E-mail from M. Holmberg to J. Neurauter, et al, Subject: SB Root Cause Effort. (1 page(s), 1/20/2012)
- ML12213A339 - Addendum to the Reactor Vessel Head Replacement Communication Plan. (8 page(s), 10/31/2011)
- ML12213A345 - E-mail from A. Rezai to D. Hills, et al, RE: Davis-Besse Shield Building Crack (Identified During RPV Head Replacement). (4 page(s), 10/12/2011)
- ML12213A373 - E-mail from M. Holmberg to S. CuadradoDeJesus, et al, Subject: RE: (1 page(s), 1/23/2012)
- ML12213A371 - E-mail from A. Sheikh to S. CuadradoDeJesus, et al, Subject: RE: Status Call Results - DB SB Cracking. (3 page(s), 1/23/2012)
- ML12213A347 - E-mail from E. Sanchez Santiago to M. Murphy, et al,: FW: Davis Besse Phone Call Feedback. (11 page(s), 10/19/2011)
- ML12213A361 - E-mail from P.. Hernandez to M. Mahoney, et al, Subject: Q & A assignments for Davis Besse. (17 page(s), 1/3/2012)
- ML12213A358 - E-mail from T. Briley to M. Murphy, et al, Subject: Davis-Besse Shield Building. (1 page(s), 12/2/2011)
- ML12213A382 - E-Mail from T. Briley, RIII, to M. Murphy, NRO/DORL, et. Al., Subject: Davis-Besse Shield Building Calculation References. (1 page(s), 12/1/2011)
- ML12213A383 - E-Mail from J. Rutkowski, RIII, to T. Briley, RIII et. Al., Subject: Licensee Project Timeline. (2 page(s), 12/2/2011)
- ML12213A384 - E-Mail from P. Hernandez, OE/CRB, to M. Evans, NRR/DORL, et. Al., Subject: RE: Davis-Besse POP. (2 page(s), 12/2/2011)
- ML12213A385 - E-mail from E. Williamson, OGC to L. Subin, OGC Subject: FW: Davis Besse Shield Building Path Forward Discussion w/attached meeting scheduler. (2 page(s), 11/22/2011)
- ML13241A073 - FOIA/PA-2012-0121 - Resp 4- Final. (2 page(s), 8/28/2013)