Home > NRC Library > ADAMS Public Documents
Seabrook, 10CFR50.59 Report, Revision 15 to the Updated Final Safety Analysis Report, Revision 12 to Appendix R, Revision 13 to Appendix A, and Revision 135 to the Technical Requirements Manual.
Accession Number: ML131340063
Date Released: Tuesday, April 26, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13134A052 - Seabrook, 10CFR50.59 Report, Revision 15 to the Updated Final Safety Analysis Report, Revision 12 to Appendix R, Revision 13 to Appendix A, and Revision 135 to the Technical Requirements Manual. (20 page(s), 4/26/2013)
- ML13134A054 - Seabrook, Updated Final Safety Analysis Report, Revision 15, List of Effective Pages Through Chapter 1 - Introduction and General Description of Plant. (294 page(s), 4/26/2013)
- ML13134A058 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures 2.3.1 through Figures 2.3-11. (12 page(s), 4/26/2013)
- ML13134A062 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Appendix 2A, Onsite Meteorological Data Summaries November 1971 - March 1973. (101 page(s), 4/26/2013)
- ML13134A063 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Appendix 2B, Onsite Meteorological Data Summaries, April 1979 - March 1980. (41 page(s), 4/26/2013)
- ML13134A064 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Appendix 2C, Geologic Investigations of the Scotland Road Fault (Clinton-Newbury Fault), Newbury, Massachusetts, and Portsmouth Fault Investigations. (145 page(s), 4/26/2013)
- ML13134A065 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area. (116 page(s), 4/26/2013)
- ML13134A066 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Appendix 2E, Historical Earthquakes in the Site Vicinity. (135 page(s), 4/26/2013)
- ML13134A067 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Appendix 2F, Geotechnical Report - Reactor Borings, July 1974. (82 page(s), 4/26/2013)
- ML13134A068 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Appendix 2G, Static Dynamic Rock Properties. (101 page(s), 4/26/2013)
- ML13134A069 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Appendix 2J, Sample Descriptions for Borings Made in November-December 1972. (66 page(s), 4/26/2013)
- ML13134A070 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Appendix 2L, Geologic Investigation of Soils and the Bedrock Surface at Unit 2 Containment Site. (218 page(s), 4/26/2013)
- ML13134A071 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems through Table 3.9(N)-11. (749 page(s), 4/26/2013)
- ML13134A072 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Figures 3.3-1 through Figures 3.6(N)-2. (49 page(s), 4/26/2013)
- ML13134A073 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Figures 3.7(B)-1 through Figures 3.7(N)-1. (53 page(s), 4/26/2013)
- ML13134A074 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Figures 3.8-1 Sheet 1 of 2 through Figures 3.11-1 Sheet 5 of 5. (55 page(s), 4/26/2013)
- ML13134A075 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Appendix 3A, Pipe Break Analysis Summary. (33 page(s), 4/26/2013)
- ML13134A076 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Appendix 3D, Procedures for Calculating Elasto-Plastically Designed Pipe Whip Restraint Loads by Energy Balance Method. (37 page(s), 4/26/2013)
- ML13134A077 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Appendix 3G, Containment Liner Anchor Load Tests. (29 page(s), 4/26/2013)
- ML13134A078 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Appendix C, Load Cell Calibration and Original Data. (33 page(s), 4/26/2013)
- ML13134A079 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Appendix 3I, Report on Analysis of High Energy Line Breaks Outside Containment. (77 page(s), 4/26/2013)
- ML13134A080 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 4 - Reactor. (225 page(s), 4/26/2013)
- ML13134A081 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 5 - Reactor Coolant System and Connected Systems. (219 page(s), 4/26/2013)
- ML13134A082 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 6 - Engineered Safety Features. (497 page(s), 4/26/2013)
- ML13134A083 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 7 - Instrumentation and Controls. (319 page(s), 4/26/2013)
- ML13134A085 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary Systems. (663 page(s), 4/26/2013)
- ML13134A086 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 10 - Steam and Power Conversion System. (148 page(s), 4/26/2013)
- ML13134A087 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 11 - Radioactive Waste Management. (195 page(s), 4/26/2013)
- ML13134A088 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 12 - Radiation Protection. (206 page(s), 4/26/2013)
- ML13134A089 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 13 - Conduct of Operations. (38 page(s), 4/26/2013)
- ML13134A090 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 14 - Initial Test Program. (153 page(s), 4/26/2013)
- ML13134A091 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 15 - Accident Analyses. (462 page(s), 4/26/2013)
- ML13134A053 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 16 - Technical Specifications through Chapter 17, "Quality Assurance. (70 page(s), 4/26/2013)
- ML13134A105 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 5 - Reactor Coolant System and Connected Systems, Drawing 1-RC-B20840 through Drawing 1-RH-B20660. (15 page(s), 4/26/2013)
- ML13134A107 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 7 - Instrumentation and Controls, Drawing 1-NHY-509041 through Drawing 1-NHY-509049. (18 page(s), 4/26/2013)
- ML13134A110 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary Systems, Drawing PID - 1-CBA-B20300 through Drawing PID - 1-DG-B20467. (53 page(s), 4/26/2013)
- ML13134A111 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 10 - Steam and Power Conversion System, Drawing 1-NHY-202116 through Drawing PID - 1-CPS-B20152. (44 page(s), 4/26/2013)
- ML13134A112 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 11 - Radioactive Waste Management, Drawing PID - 1-WL-B20828 through Drawing 1-NHY-500015. (23 page(s), 4/26/2013)
- ML13134A125 - Seabrook, Revision 12 to Appendix R, "Fire Protection of Safe Shutdown Capability." (745 page(s), 4/26/2013)
- ML13134A122 - Seabrook, Revision 135 to the Technical Requirements Manual. (209 page(s), 4/26/2013)
- ML16117A573 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Drawing 9763-F-101696 through Drawing 9763-F-101463 - Redacted. (17 page(s), 4/26/2013)
- ML16117A575 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Drawing 9763-F-101438 through Drawing 9763-F-101635 - Redacted (11 page(s), 4/26/2013)
- ML16117A577 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Drawing 9763-F-101303 through Drawing 9763-F-202118 - Redacted. (11 page(s), 4/26/2013)
- ML16201A297 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics through Table 2R-3 - Redacted. (605 page(s), 4/26/2013)
- ML16201A304 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 8 - Electric Power - Redacted. (258 page(s), 4/26/2013)
- ML16201A305 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary Systems, Drawing PID - 1-SF-B20480 through Drawing PID - 1-VG-B20782 - Redacted. (83 page(s), 4/26/2013)
- ML16201A309 - Seabrook, Revision 13 to Appendix A, "Evaluation and Comparison to BTP APCSB 9.5-1." - Redacted. (567 page(s), 4/26/2013)
- ML16202A192 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures 2.1-1 through Figures 2.1-32 - Redacted. (33 page(s), 4/26/2013)
- ML16202A196 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures 2.4-1 through Figures 2.4-32 - Redacted. (36 page(s), 4/26/2013)
- ML16202A210 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures 2.5-1 through Figures 2.5-49, Sheet 2 of 2 - Redacted. (50 page(s), 4/26/2013)
- ML16202A214 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures 2.5-50, Sheet 1 of 2 through Figures 2.5-71 - Redacted. (23 page(s), 4/26/2013)
- ML16202A215 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 1 - Introduction and General Description of Plant, Drawing PID - Legend1, Sheet 1 of 2 through Drawing 1-NHY-805062 - Redacted. (10 page(s), 4/26/2013)
- ML16202A431 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 6 - Engineered Safety Features, Drawing PID - 1-CBS-B20233 through Drawing PID - 1-FW-B20688 - Redacted. (14 page(s), 4/26/2013)
- ML16202A442 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 8 - Electric Power, Drawing 9763-F-309826 through Drawing 1-NHY-310107 Sheet E2Ua - Redacted. (72 page(s), 4/26/2013)
- ML16202A444 - Seabrook, Updated Final Safety Analysis Report, Revision 15, Chapter 12 - Radiation Protection, Drawing 9763-F-805184 through Drawing 1-NHY-500016-2 - Redacted. (21 page(s), 4/26/2013)