Home > NRC Library > ADAMS Public Documents
Seabrook Station, Revision 14 to the Seabrook Station Updated Final Safety Analysis Report, Revision 11 to Appendix R, "Fire Protection Safe Shutdown Capability," Revision 12 to Appendix A, "Evaluation and Comparison to BTP APCSB 9.5-1, " & Rev. 129...
Accession Number: ML113360342
Date Released: Tuesday, April 26, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11336A288 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 3, Design of Structures, Components, Equipment and Systems, - Page continue. (750 page(s), 11/17/2011)
- ML11336A289 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 3, Design of Structures, Components, Equipment and Systems, Figures, - Page continue. (49 page(s), 11/17/2011)
- ML11336A317 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 3, Design of Structures, Components, Equipment and Systems, Figures, - Page continue. (53 page(s), 11/17/2011)
- ML11336A318 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 3, Design of Structures, Components, Equipment and Systems, Figures - Page continue. (50 page(s), 11/17/2011)
- ML11336A320 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Appendix 3D, Procedure for Calculating Elasto-Plastically Designed Pipe Whip Restraint Loads by Energy Balance Method. (37 page(s), 11/17/2011)
- ML11336A321 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Appendix 3G, Containment Liner Anchor Load Tests. (29 page(s), 11/17/2011)
- ML11336A313 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 3 Appendix 3I - Report on Analysis of High Energy Line Breaks Outside Containment. (77 page(s), 11/17/2011)
- ML16117A566 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 3, Drawings, Part 1 of 3 - Redacted. (18 page(s), 11/17/2001)
- ML16117A568 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 3, Drawings, Part 2 of 3 - Redacted. (11 page(s), 11/17/2001)
- ML16117A571 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 3, Drawings, Part 3 of 3 - Redacted. (15 page(s), 11/17/2011)
- ML16201A155 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 2.4, Figures 2.4-1 Through Figures 2.4-32 - Redacted. (33 page(s), 11/17/2001)
- ML16201A152 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 2, Site Characteristics - Redacted. (605 page(s), 11/17/2011)
- ML16201A341 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 2.5, Figures Part 1 2.5-1 Through Figures 2.5-49, Sheet 2 of 2 - Redacted. (50 page(s), 11/17/2011)
- ML16201A343 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 2.5, Figures Part 2 2.5-50 Through 2.5-71, Sheet 1 of 2 - Redacted. (23 page(s), 11/17/2011)
- ML16201A359 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 2.1, Figures 2.1-1 Through Figures 2.1-32 - Redacted. (33 page(s), 11/17/2011)
- ML16201A156 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 8 - Electric Power - Redacted. (272 page(s), 11/17/2011)
- ML16201A366 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 1, Drawings, Part 1 of 6 - Redacted (10 page(s), 11/17/2011)
- ML16201A374 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 8, Drawings - Redacted (71 page(s), 11/17/2011)
- ML16201A387 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 9, Drawings, Part 1 of 2 - Redacted (83 page(s), 11/17/2011)
- ML16201A406 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 6, Drawings - Redacted. (14 page(s), 11/17/2011)
- ML16201A408 - Seabrook Station - Updated Final Safety Analysis Report, Revision 14, Chapter 12, Drawings - Redacted (21 page(s), 11/17/2011)
- ML16201A160 - Seabrook Station - Evaluation and Comparison to BTP APCSB 9.5-1, Appendix A, Revision 12 - Redacted (581 page(s), 11/17/2011)