Home > NRC Library > ADAMS Public Documents
Watts Bar, Unit 2 - Transmittal of Amendment 98 to Final Safety Analysis Report.
Accession Number: ML101340795
Date Released: Thursday, May 27, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML101340794 - Watts Bar, Unit 2 - Transmittal of Amendment 98 to Final Safety Analysis Report. (16 page(s), 5/7/2010)
- ML101370380 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Table of Contents - Sections 1 through 17. (50 page(s), 5/7/2010)
- ML101370382 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, List of Effective Pages. (82 page(s), 5/7/2010)
- ML101370383 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 1. (106 page(s), 5/7/2010)
- ML101370384 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 2, Table of Contents through Pages 2.3-128 - Figure 2.3-29. (244 page(s), 5/7/2010)
- ML101370385 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 2A, Pages 2.4-1 - Hydrologic Engineering through Page 2.4-165 - Figure 2.4-29. (165 page(s), 5/7/2010)
- ML101370386 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 2B, Pages 2.4-166 through 2.4-241. (76 page(s), 5/7/2010)
- ML101370376 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 2C, Pages 2.5-1 Geology, Seismology, and Geotechnical Engineering Summary of foundation Conditions through Page 2.5-204. (204 page(s), 5/7/2010)
- ML101370378 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 2D Pages 2.5-205 through Page 2.5-466. (262 page(s), 5/7/2010)
- ML101370379 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 2E - Pages 2.5-467 thur 2.5-952. (486 page(s), 5/7/2010)
- ML101370387 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 3A - Table of Contents - Design of Structures, Components, Equipment, and Systems, Pages 3.1-1 thur 3.5A-4. (214 page(s), 5/7/2010)
- ML101370388 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 3B - Pages 3.6-1 thur 3.7-223. (299 page(s), 5/7/2010)
- ML101370395 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 3C - Pages 3.8.1-1 thur 3.8.4-182. (336 page(s), 5/7/2010)
- ML101370396 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 3D - Pages 3.8.5-1 thur 3.11-10. (274 page(s), 5/7/2010)
- ML101370397 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 4 - Reactor, Pages 4.1-1 thur 4.4-52. (280 page(s), 5/7/2010)
- ML101370390 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 5 - Reactor Coolant System, Pages 5.1-1 thur 5.6-8. (286 page(s), 5/7/2010)
- ML101370391 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 6 - Engineered Safety Features, Pages 6.1-1 thur 6.2.6-30. (514 page(s), 5/7/2010)
- ML101370392 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 6A - Emergency Core Cooling System, Pages 6.3-1 thur 6.9-2. (356 page(s), 5/7/2010)
- ML101370393 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 7 - Instrumentation and Controls, Pages 7.0 thur 7A.2.1. (266 page(s), 5/7/2010)
- ML101370394 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Section 8, Electric Power. (330 page(s), 5/7/2010)
- ML101370399 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Section 9, Auxiliary Systems - throught Section 9.3-160. (440 page(s), 5/7/2010)
- ML101370401 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Section 9.4, Air Conditioning, Heating, Cooling, and Ventilation Systems - End. (366 page(s), 5/7/2010)
- ML101370406 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Section 10, Main Steam and Power Conversion Systems. (184 page(s), 5/7/2010)
- ML101370407 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Section 11, Radioactive Waste Management. (152 page(s), 5/7/2010)
- ML101370408 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Section 12, Radiation Protection. (124 page(s), 5/7/2010)
- ML101370410 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Section 13, Conduct of Operations. (32 page(s), 5/7/2010)
- ML101370404 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Section 14, initial Test Program. (184 page(s), 5/7/2010)
- ML101370405 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Section 15, Accident Analyses. (543 page(s), 5/7/2010)
- ML101370411 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Section 16, Technical Specifications. (12 page(s), 5/7/2010)
- ML101370412 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Section 17, Quality Assurance. (10 page(s), 5/7/2010)
- ML101370532 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Figure 2.5-3, Subregional Geologic Section. (1 page(s), 5/7/2010)
- ML101370533 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Figure 2.5-11, Geologic Section Through Plant Area. (1 page(s), 5/7/2010)
- ML101370534 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Figure 2.5-71, Graphic Log & Elastic Moduli STA. L-61+00. (1 page(s), 5/7/2010)
- ML101370535 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Figure 2.5-222, Borrow Investigation. (1 page(s), 5/7/2010)
- ML101370537 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Figure 2.5-281, Category 1 Conduit Banks Section F-F, Sheet 1. (1 page(s), 5/7/2010)
- ML101370531 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Figure 2.5-281, Category I Conduit Banks Section F-F, Sheet 2. (1 page(s), 5/7/2010)
- ML101370538 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Figure 2.5-549, ERCW Pipeline Section A-A, Sheet 1 of 4. (1 page(s), 5/7/2010)
- ML101370539 - Watts Bar, Unit 2, Amendment 98 to Final Safety Analysis Report, Figure 2.5-549, ERCW Pipeline Section A-A, Sheet 2 of 4. (1 page(s), 5/7/2010)
- ML101370540 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-549, ERCW Pipeline, Section A-A. Sheet 3 of 4. (1 page(s), 5/7/2010)
- ML101370542 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-549, ERCW Pipeline, Section A-A. Sheet 4 of 4. (1 page(s), 5/7/2010)
- ML101370545 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-550, ERCW Pipeline, Section B-B. (1 page(s), 5/7/2010)
- ML101370546 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-551, ERCW Pipeline, Section C-C. (1 page(s), 5/7/2010)
- ML101370543 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-554, Category I Electrical Conduits, Section F-F. Sheet 1 of 2. (1 page(s), 5/7/2010)
- ML101370544 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-554, Category I Electrical Conduits, Section F-F. Sheet 2 of 2. (1 page(s), 5/7/2010)
- ML101370547 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-555, Category I Electrical Conduits, Section G-G. (1 page(s), 5/7/2010)
- ML101370548 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-556, Category I Electrical Conduits, Section H-H. (1 page(s), 5/7/2010)
- ML101370549 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-571, ERCW Pipeline, Section A-A. Sheet 1 of 4. (1 page(s), 5/7/2010)
- ML101370550 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-571, ERCW Pipeline, Section A-A. Sheet 2 of 4. (1 page(s), 5/7/2010)
- ML101370551 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-571, ERCW Pipeline, Section A-A. Sheet 3 of 4. (1 page(s), 5/7/2010)
- ML101370552 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-571, ERCW Pipeline, Section A-A. Sheet 4 of 4. (1 page(s), 5/7/2010)
- ML101370587 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-572, ERCW Pipeline, Section B-B. (1 page(s), 5/7/2010)
- ML101370588 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-573, ERCW Pipeline, Section C-C. (1 page(s), 5/7/2010)
- ML101370589 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-576 Category I Electrical Conduits Section F-F. Sheet 1 of 2. (1 page(s), 5/7/2010)
- ML101370590 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-576, Category I Electrical Conduits Section F-F. Sheet 2 of 2. (1 page(s), 5/7/2010)
- ML101370591 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-577, Category I Electrical Conduits, Section G-G. (1 page(s), 5/7/2010)
- ML101370592 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-578, Category I Electrical Conduits Section H-H. (1 page(s), 5/7/2010)
- ML101370593 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-579, Miscellaneous ERCW Piping and IE Conduit Soil Borings. (1 page(s), 5/7/2010)
- ML101370594 - Watts Bar Unit 2 - Amendment 98 to Final Safety Analysis Report, Figure 2.5-583, Remedial Treatment for Potential Soil Liquefaction Stability Analysis Summary. (1 page(s), 5/7/2010)
- ML101370595 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Figure 2.5-588. (1 page(s), 5/7/2010)
- ML101370584 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Figure 2.5-589. (1 page(s), 5/7/2010)
- ML101370585 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Figure 2.5-594, Underground Barrier Trench A STA 1+ 78. (1 page(s), 5/7/2010)
- ML101370586 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Figure 2.5-595, Underground Barrier Trench A STA 3+ 78. (1 page(s), 5/7/2010)
- ML101370596 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Figure 2.5-596, Underground Barrier Trench A STA 5+78. (1 page(s), 5/7/2010)
- ML101370597 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Figure 2.5-597, Underground Barrier Trench A STA 7+ 78. (1 page(s), 5/7/2010)
- ML101370598 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Figure 2.5-602, Underground Barrier Trench B STA 1+00. (1 page(s), 5/7/2010)
- ML101370599 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Figure 2.5-603, Underground Barrier Trench B STA 2+50. (1 page(s), 5/7/2010)
- ML101370600 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Figure 2.5-604, Underground Barrier Trench B STA 3-1-00. (1 page(s), 5/7/2010)
- ML101370601 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Figure 2.5-605, Underground Barrier Trench B STA 4 + 50. (1 page(s), 5/7/2010)
- ML101370649 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Table 6.2.4-1, Containment Penetrations and Barriers. (64 page(s), 5/7/2010)
- ML101370674 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Section 1.0, Introduction and General Description of Plant. (50 page(s), 5/7/2010)
- ML101370675 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, List of Effective Pages. (82 page(s), 5/7/2010)
- ML101370670 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Section 2 C, Geology, Seismology, and Geotechnical Engineering Summary of Foundation Conditions. (204 page(s), 5/7/2010)
- ML101370672 - Watts Bar Unit 2 Amendment 98 to Final Safety Analysis Report, Section 2 D, Geology, Seismology, and Geotechnical Engineering Summary of Foundation Conditions. (262 page(s), 5/7/2010)
- ML101370696 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 4, Reactor. (280 page(s), 5/7/2010)
- ML101370697 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 5, Reactor Coolant System. (286 page(s), 5/7/2010)
- ML101370689 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 6, Emergency Core Cooling System, Page 6.3-1 through 6.9-2. (356 page(s), 5/7/2010)
- ML101370690 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 7, Instrumentation and Controls. (266 page(s), 5/7/2010)
- ML101370717 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 10, Main Steam and Power Conversion Systems. (184 page(s), 5/7/2010)
- ML101370704 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 11, Radioactive Waste Management. (152 page(s), 5/7/2010)
- ML101370706 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 13, Conduct of Operations. (32 page(s), 5/7/2010)
- ML101370702 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 14, Initial Test Program. (184 page(s), 5/7/2010)
- ML101370707 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 15, Accident Analyses. (543 page(s), 5/7/2010)
- ML101370708 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 16, Technical Specifications. (12 page(s), 5/7/2010)
- ML101370709 - Watts Bar, Unit 2 - Amendment 98 to Final Safety Analysis Report, Section 17, Quality Assurance. (10 page(s), 5/7/2010)