Home > NRC Library > ADAMS Public Documents
Forwards application for amend to License DPR-64,revising TS in Table 4.1-1 for extension of surveillance test & calibr intervals for RPS to accomodate 24 month operating cycle. Proprietary info also encl.Proprietary info withheld.
Accession Number: ML093420891
Date Released: Tuesday, June 1, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML093420890 - Forwards application for amend to License DPR-64,revising TS in Table 4.1-1 for extension of surveillance test & calibr intervals for RPS to accomodate 24 month operating cycle. Proprietary info also encl.Proprietary info withheld. (3 page(s), 2/18/1993)
- ML093420892 - Application for amend to License DPR-64,revising TS in Table 4.1-1 for extension of surveillance test & calibr intervals for RPS to accomodate 24 month operating cycle. (1 page(s), 2/18/1993)
- ML093420893 - Proposed tech specs Table 4.1-1 re surveillance requirements for reactor protection sys. (24 page(s), 2/18/1993)
- ML093420894 - Informs that encl 3 page discussion on calibr extensions & NYPA Rept IP3-RPT-RPC-00357 contains proprietary info.Info being used in support of TS changes for facility RPS. Requests that proprietary info be withheld per 10CFR2.790. (13 page(s), 1/25/1993)
- ML093490950 - Nonproprietary "Instrument Drift Analysis for RPS." (87 page(s), 11/10/1992)
- ML093490951 - "Instrument Loop Accuracy/Setpoint Calculation/RC Loop Low Flow." (28 page(s), 8/18/1992)
- ML093490953 - "Instrument Loop Accuracy/Setpoint Calculation SG Low-Level: AFW & Reactor Trip Initiation." (36 page(s), 7/6/1992)
- ML093490954 - "Instrument Loop Accuracy/Setpoint Calculation/6.9 kV Undervoltage & Underfrequency." (30 page(s), 10/20/1992)