Home > NRC Library > ADAMS Public Documents
Fourth partial response to FOIA request for six categories of documents re facilities.Forwards App A documents.App B document entirely withheld (ref FOIA Exemption 5).Review of addl documents subj to request continuing.
Accession Number: ML082840625
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082840648 - Fourth partial response to FOIA request for six categories of documents re facilities.Forwards App A documents.App B document entirely withheld (ref FOIA Exemption 5).Review of addl documents subj to request continuing. (8 page(s), 2/13/1984)
- ML20083L203 - Forwards R Gotchy review of JW Goffman article re radiation causation of cancer in Hanford workers.No new or significant info presented. (1 page(s), 2/7/1980)
- ML20083L752 - Forwards Central Files version of revised page to Revision 2 of emergency plan adding local fire depts within 20 miles of facility to backup fire protection svcs. (2 page(s), 8/5/1982)
- ML20083L632 - Forwards addl info requirements for review of ER for OL application per 820210 request. (3 page(s), 3/2/1982)
- ML20083L621 - Advises that listed info needed to perform acceptance review of fire protection program for conformance w/NUREG-0800, Section 9.5-1. (1 page(s), 2/9/1982)
- ML20083L610 - Requests that Fire Protection Section perform acceptance level review of facilities' revised fire protection program prior to docketing of OL application.Util aware that App R to 10CFR50 will apply. (1 page(s), 1/29/1982)
- ML20083L806 - Forwards Cycle 3 systematic appraisal of licensee performance input for 810701 through 820730 in response to Region 5 820625 request.Strong mgt evident.Resolution of technical issues,responsiveness & staffing satisfactory. (6 page(s), 9/15/1982)
- ML20083L506 - Forwards results of branch review of EPRI/PWR test,per 810602 memo. (1 page(s), 6/12/1981)
- ML20084B825 - Recommends that radiation exposure records be retained for 1 yr prior to disposal.Ref Murphy to Varga 801222. (1 page(s), 4/1/1983)
- ML20083L654 - Notification of 820511 meeting w/util to discuss review process & preliminary identification of any possible unique features. (1 page(s), 4/22/1982)
- ML20083L335 - Responds to ltr forwarding M Hamilton concerns re facilities.CPs issued in Apr 1978 after safety & environ reviews & ASLB public hearings.Public hearings may be requested when util applies for OLs. (1 page(s), 12/16/1980)
- ML20083L618 - Requests assistance in performing acceptance review of environ rept for OL application.Only portions applicable to Unit 1 need be considered since Unit 4 cancelled on 820122. (1 page(s), 2/10/1982)
- ML20083L501 - Concurs w/licensee proposal to ref Sections 2.5.1-2.5.1- 2.5.3 of WPPS-2 FSAR in WPPS-1/4 FSAR since both projects located in close proximity.Mods listed. (2 page(s), 5/15/1981)
- ML20083L178 - Submits rept of time spent since program initiated on WPPSS 3 & 5.Professional time all spent on post-hearing work regarding CP hearing. (3 page(s), 4/11/1978)
- ML20083L569 - Submits names of D Gupa & G Stalley as technical reviewers for facility FSAR per 811023 memo. (1 page(s), 10/30/1981)
- ML20083L326 - Notifies of findings of possible capable fault near facility. (1 page(s), 10/27/1980)
- ML20083L565 - Forwards form which identifies Power Sys Branch electrical & mechanical reviewers for project in accordance w/811023 memo.Requests established review schedule dates when available. (2 page(s), 11/2/1981)
- ML082840624 - Provides status of SER inputs & acceptance reviews for OL & CP applications.Schedule should be met. (1 page(s), 2/6/1980)
- ML20083L186 - Forwards hydrologic engineering questions re proposed waste treatment sys.Response will supply necessary info re design basis for seepage & flooding.Also forwards generic questions re floodplains.Info will assist NRC environ review. (5 page(s), 3/7/1980)
- ML20083L170 - Forwards IE cost data worksheets for facilities.No costs relected for licensee contractor vendor insp repts. (3 page(s), 1/29/1979)
- ML20083L644 - Informs that sufficient info provided to begin meteorology review.Inappropriate models & diffusion parameters used in Section 6.1.3.2 & accident evaluations. (2 page(s), 3/16/1982)
- ML20083L348 - Forwards action plan for resolution of non-TMI issues for pending CP/mfg license applications,per Ofc of Nuclear Reactor Regulation approach to resumption of licensing. Safety evaluation inputs should be provided by 810601. (1 page(s), 12/31/1980)
- ML20083L436 - Advises that Mechanical Engineering Branch completed review of util request for authorization to use ASME Code Cases N-219 & N-287 for application in design of concrete containments.Code cases acceptable. (1 page(s), 4/29/1981)
- ML20083L310 - Forwards 800625 ltr from constituent E Borhek for response. Requests that duplicate rept be forwarded to 802 United States Courthouse,Seattle,WA 98104. (2 page(s), 7/21/1980)
- ML20083L514 - Forwards info re impact of Mount St Helens eruptions on facilities,for use by SALP review board.Comments prepared by HE Lefevre,geologist. (2 page(s), 6/23/1981)
- ML20083L596 - Forwards Central Files version of "Description of Early Warning Sys for WPPSS Nuclear Plants 1,2 & 4," in response to NRC 810720 ltr re prompt notification in event of emergency.Sys will be in place prior to OL issuance. (1 page(s), 1/11/1982)
- ML20083L573 - Informs of receipt of telcon from Yakamar Indian Nation requesting that tribe be given full rights in facilities proceedings. (1 page(s), 10/21/1981)
- ML20083L625 - Discusses Part 21 rept re UE&C design of structural steel at facility.Generic implications appear to be nonexistent since no similar design concept used at other facilities.Two oversize drawings encl.Aperture cards in Central Files. (2 page(s), 2/24/1982)
- ML20083L563 - Notifies of util intention of sending technical team to present FSAR to review staff during wk of 811130.Reviewers should complete attached form & confirm attendance. (4 page(s), 10/23/1981)
- ML20083L206 - Reviews JW Gofman Nov 1979 article per 791226 request. Analysis statistically weak.Results fall within BEIR rept risk estimates.NIH 800310 & 11 conference will discuss low-level ionizing radiation biological effects. (2 page(s), 2/1/1980)
- ML20083L254 - Forwards airworthiness alert re corrosive & abrasive characteristics of volcanic ash which has fallen in Pacific Northwest.Questions re ash amount,chemistry & size distribution will be forwarded to licensees.W/o encl. (2 page(s), 6/12/1980)
- ML20083L494 - Advises that info provided on 810213 & 0403 re air intake arrangements for diesel generators reviewed.Diesel generator combustion air supply arrangement meets acceptance criteria in Section II of SRP a.5.8.Sys acceptable as designed. (1 page(s), 5/1/1981)
- ML20083L175 - Corrects 781028 memo re WPPSS 3 & 5 being contested.Memo reflecting actual ASLB time spent on case encl. (1 page(s), 2/28/1980)
- ML20083Q715 - Forwards util 830223 submittal in response to telcon during which remaining Phase I open items of "Control of Heavy Loads - Case Reviews," were discussed.W/o encl. (1 page(s), 2/28/1983)
- ML20083L533 - Notification of 810729 meeting w/util & B&W in Bethesda,MD to discuss method util intends to use to fulfill requirments of NUREG-0737 Item II.F.2 (inadequate core cooling instrumentation). (2 page(s), 7/21/1981)
- ML20083L284 - Discusses review of applicant 800814 request for approval of proposal to substitute in-plant tests w/scale model recirculation sump tests.Response to requests deferred pending NRC review of program. (1 page(s), 9/26/1980)
- ML20083L641 - Forwards two relevant documents for FOIA request re WPPSS & Exxon Litigation. (3 page(s), 3/8/1982)
- ML20083L587 - Notification of 811211 meeting w/util in Bethesda,MD to discuss FSAR w/technical review staff at time OL application is tendered. (3 page(s), 11/23/1981)
- ML20083L536 - Notification of 810820 meeting w/util in Bethesda,MD to discuss proposed independent design review programs. (3 page(s), 7/30/1981)
- ML20083L669 - Forwards list of sys to be added to Q-list.Sys provides ongoing knowledge of changes in radiation environ & ability to deal effectively w/unusually high radiation & radioactivity levels. (2 page(s), 3/23/1982)
- ML20083L639 - Advises that environ rept is acceptable re radiological impacts. (1 page(s), 3/2/1982)
- ML20087A875 - Forwards summary of review costs & supporting documentation from program ofcs. (1 page(s), 3/3/1980)
- ML20083L190 - Discusses suspension of facility preoperational aquatic monitoring program.Suspension approved.Operational monitoring program results should not be affected by suspension. (2 page(s), 2/29/1980)
- ML20083L432 - Responds to 810414 memo re util request for clarification in use of ASME code cases.Util use of code cases w/o prior NRC approval is inadvisable due to potential hardship for user. (1 page(s), 4/21/1981)
- ML20083L880 - Ack receipt of 821109 ltr re Target Rock environ qualification testing program.Info re valve upgrade & retest anticipated. (1 page(s), 12/1/1982)
- ML20083L517 - Forwards Ofc of Nuclear Reactor Regulation performance evaluation in compliance w/810604 memo re systematic assessment of licensee performance Cycle 2.Notifies that review board meeting for facility scheduled for 810723. (1 page(s), 6/30/1981)
- ML20083L368 - Forwards short & long-term OL & CP review schedules,in response to 801216 meeting w/USGS.List of OL plant reviews for which NRC tentatively plans to seek USGS assistance is provided. (5 page(s), 1/21/1981)
- ML20083L167 - Submits review costs for facilities.Hearing was uncontested.Billing procedure may be completed. (1 page(s), 2/22/1980)
- ML20084B632 - Requests search for documents re govt litigation w/util on five specific issues. (1 page(s), 3/23/1983)
- ML20083L630 - Recommends environ rept be accepted.Addl questions re external appearance,plant layout & socioeconomics of single unit operation will be submitted. (1 page(s), 2/25/1982)
- ML20083L529 - Accepts use of ASME Code Case N-242-1 dtd 800410 for application in const of pipe support frames in pipe chases located in two lower elevations of reactor auxiliary bldg. Conditions of use discussed. (1 page(s), 7/21/1981)
- ML20083L497 - Forwards ltr from util requesting concurrence by NRC to omit Subsections 2.5.1-2.5.3 of FSAR.Review & comments requested by 810622. (1 page(s), 5/12/1981)
- ML20083L510 - Requests that appropriate comments re Cycle 2 evaluations, per Eisenhut 810604 memo,be submitted by 810623. (1 page(s), 6/18/1981)
- ML20083L109 - Notifies that NRC has amended regulations re implementation of resident insp program.Expresses gratitude for assistance rendered.Forwards final rule.W/o encl. (1 page(s), 11/19/1979)
- ML20083L519 - Forwards Geosciences Branch input for use by facility systematic assessment of licensee performance review board, per 810618 request. (3 page(s), 6/23/1981)
- ML20083L556 - Requests that comparison of fire protection program to App R of 10CFR50 be included in overall fire protection program submittal.W/o encl FR notice. (2 page(s), 9/30/1981)
- ML20083L417 - Concludes that Table 3.2-2 of PSAR,re safety-related structures,sys & components,is incomplete from Geotechnical Engineering Branch viewpoint. (2 page(s), 4/8/1981)
- ML20083L256 - Responds to 800702 ltr re E Borhek concern about ultimate responsibility for civil penalities proposed against util. Civil penalties are imposed as enforcement action.State agencies should be contacted re responsibility for payment. (4 page(s), 8/26/1980)
- ML20083L699 - Lists info not yet addressed for OL application.Recommends general info be accepted for docketing. (1 page(s), 6/18/1982)
- ML20083L552 - Discusses proposal to use IDRs in licensing process.IDRs may be useful in certain areas,but clarification of role needed. (1 page(s), 9/23/1981)