Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for documents.App P documents encl & available in PDR.
Accession Number: ML082321542
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082321541 - Partial response to FOIA request for documents.App P documents encl & available in PDR. (8 page(s), 7/18/1988)
- ML20207F051 - Comments on review of draft guidance on post-fire safe shutdown capabilities.No comments offered. (2 page(s), 1/25/1984)
- ML20207F274 - Forwards comments on draft enforcement guidance for fire prevention/protection violations,per 840426 memo. (2 page(s), 5/22/1984)
- ML20207E892 - Forwards proposed Tech Specs for fire protection for consideration. (1 page(s), 7/12/1983)
- ML20207F124 - Forwards list of all attendees at 840223 fire protection meeting at Ramada Inn in Rosemont,IL. (102 page(s), 7/18/1988)
- ML20207F441 - Provides feedback on regional meetings re fire protection per 840518 memo,including comments on interpretations of App R,additions to or expansion of items listed under questions raised & comments on util of meetings. (4 page(s), 6/7/1984)
- ML20151H874 - Recommends that Tech Specs be updated to require surveillance testing of active fire barriers.NRC review of fire protection program completed.Tech Specs for all operating plants should be updated after review completion. (2 page(s), 9/16/1983)
- ML20207E712 - Provides comments & suggested changes to fire protection guidelines & rules. (24 page(s), 8/29/1983)
- ML20207F248 - Comments on revised draft guidance for fire prevention/ protection violations,per 840426 memo. (4 page(s), 5/4/1984)
- ML20151U060 - Discusses comparison of fire protection requirements for operating reactors & near-term OLs. (27 page(s), 10/18/1986)
- ML20207F460 - Forwards addl specific comments on interpretations to App R promulgated at regional workshops on fire protection,per 840518 memo. (3 page(s), 7/27/1984)
- ML20151T835 - Submits quarterly rept of differing prof opinion re fire protection requirements. (1 page(s), 11/9/1984)
- ML20207F415 - Advises that response to 840518 memo re feedback from regional meetings on fire protection will be provided by 840608. (1 page(s), 5/30/1984)
- ML20207F009 - Forwards memo re Region III insp experience in fire protection/prevention area for consideration & use in development of generic ltr. (8 page(s), 12/9/1983)
- ML20207E728 - Forwards comments on SRP 9.5-1 re fire protection requirements.W/o encl. (1 page(s), 8/29/1983)
- ML20151H175 - Forwards correspondence re fire protection for facility. Fire protection program review complete. (1 page(s), 1/21/1982)
- ML20151J010 - Discusses NRC 840504 App R workshop in Atlanta,GA.Next workshop scheduled for June 1984 to discuss insp team review of licensee reevaluation of items deviating from App R requirements. (2 page(s), 5/14/1984)
- ML20207F358 - Provides concerns in fire protection/prevention & App R areas.NRC clearly establish & communicate to industry importance of fire protection requirements. (3 page(s), 5/29/1984)
- ML20151H758 - Responds to Region II 830317 request for comments re fire brigade personnel physical exams & failure of util to specify expiration date on hot work permits. (2 page(s), 4/22/1983)
- ML20207E920 - Forwards proposed STS for fire protection for transmittal to NRR for review. (37 page(s), 7/11/1983)
- ML20151H926 - Forwards response to Region IV request for technical assistance on applicability of 10CFR50,App R to facility. Results of performance goal review for alternate shutdown cooling method expected during upcoming month. (7 page(s), 12/7/1983)
- ML20151H987 - Forwards revised draft guidance for enforcement actions re fire protection requirements & overview of regional comments & IE response for comment.Comments requested by 840504. (7 page(s), 4/28/1984)
- ML20151T980 - Provides understanding of comments by personnel attending NRC Fire Protection Policy Steering Committee 841002 meeting. (7 page(s), 11/28/1984)
- ML20151H353 - Responds to 820309 request for guidance on six unresolved fire protection items.Guidance submitted provides installation stds & codes applicable to mods. (3 page(s), 4/27/1983)
- ML20151U014 - Requests approval in support of semiannual workshop meetings to exchange App R insp experiences & more consistent approach to overall scheme of routine fire protection insp program. (3 page(s), 1/29/1985)
- ML20151H298 - Notifies that usage of automatic depressurization sys in conjunction w/LPCI as proposed shutdown method in event of fire will result in short-term uncovering of upper portion of core at some BWR facilities,but method still acceptable. (3 page(s), 12/3/1982)
- ML20207E805 - Forwards addl comments on proposed changes to SRP 9.5.1, "Fire Protection," per 830719 memo.W/o encl. (1 page(s), 9/16/1983)
- ML20151K598 - Recommends that Allegation IE-84-A-0006,identified in Dow Corning 840606 ltr,be sent to all licensees & applicants as part of info notice.Fire barrier penetration seals may have been installed by unqualified personnel. (1 page(s), 12/28/1984)
- ML20207F353 - Comments on three items in 840518 memo re feedback from Region II workshop meeting on interpretations of App R. (2 page(s), 5/25/1984)
- ML20151U027 - Forwards comments on proposed changes to fire protection STS,per 850201 memo. (5 page(s), 2/22/1985)
- ML20151H151 - Notifies that review of fire protection program per 810217 fire protection rule is complete. (1 page(s), 12/31/1981)
- ML20151K363 - Forwards addl info re insp finding to support Commissioners request in response to 840724 informal request.Total of 783 fire protection deficiencies identified in 1977-1984 insp repts. (18 page(s), 7/27/1984)
- ML20151H330 - Discusses NRC position on oil collection sys capacity required by 10CFR50,App R,Section III.O to hold entire lube inventory.Exemption to Section III.O may be granted in cases where lube oil contained within pump casing. (16 page(s), 4/1/1983)
- ML20151U076 - Forwards comments on proposed changes to STS on fire protection. (15 page(s), 7/18/1988)
- ML20151U051 - Forwards mgt resolutions of outstanding differing prof opinions re fire protection issues. (4 page(s), 12/12/1985)
- ML20151H856 - Reviews licensee short-term & long-term compensatory actions on insp findings re 10CFR50,App R shutdown/fire protection deficiencies.Short-term actions acceptable. (6 page(s), 9/19/1983)
- ML20151K289 - Recommends Commission authorize Director of IE to issue encl notice of violation & proposed imposition of civil penalties in amount of $440,000 & encl order for mod of license,based on matl false statements. (60 page(s), 6/21/1984)
- ML20207F078 - Provides Commission w/info re results & actions arising from NRC initial insp of licensee compliance w/provisions of 10CFR50.48 & requirements of safe shutdown portion of fire protection rule. (3 page(s), 2/14/1984)
- ML20151U046 - Forwards JM Ulie & C Ramsey 851025 memos in response to Commission request to obtain views of individuals having differing opinions on certain fire protection issues. (1 page(s), 10/25/1985)
- ML20151J042 - Expresses concern re NRC use of contractors w/o American Nuclear Insurers approved fire barrier sealing sys to perform penetration sealing at nuclear powered generation facilities. (2 page(s), 6/6/1984)
- ML20151H833 - Opposes inclusion of physical separation barriers described in Reg Guide 1.75 in Tech Specs,in response to Task Interface Agreement 83-53, "Physical Independence of Electrical Sys." (3 page(s), 7/22/1983)
- ML20151U005 - Forwards comments on draft procedures for insp of 10CFR50, App R requirements for safe shutdown. (2 page(s), 1/4/1985)
- ML20207F188 - Provides no comments on proposed enforcement guidance for fire prevention/protection violations. (1 page(s), 5/4/1984)
- ML20151U067 - Forwards instructions for 1987-88 upcoming App R insps for review. (9 page(s), 2/3/1987)
- ML20207E669 - Forwards general comments on Draft Temporary Instructions 2515/XX, "Insp of Fire Protection Backfit Requirements of 10CFR50,App R." (4 page(s), 7/15/1982)
- ML20207E792 - Provides addl changes to fire protection guidelines & rules. (2 page(s), 9/12/1983)
- ML20151K302 - Responds to 831221 request for review of BNL submittals re fire causing current transformer secondary leads to open & possible adverse effects on primary electrical sys.BNL assessment overly conservative & lacks substantiation. (3 page(s), 6/27/1984)
- ML20207E860 - Requests that encl proposed surveillance testing requirements be included in proposed STS for fire protection. (1 page(s), 11/4/1983)
- ML20207F294 - Provides supporting info for differing opinion on 10CFR50, App R.Basic premise to App R compliance is assurance that fire protection features provided for structures,sys & components important to safe shutdown. (28 page(s), 5/24/1984)
- ML20207E883 - Forwards revised proposed STS for fire protection for review. (6 page(s), 11/4/1983)
- ML20207F150 - Forwards overview of regional comments & IE response re enforcement guidance for fire prevention/protection violations.Draft guidance should be reviewed & ready for discussion at regional administrators 840329 meeting. (8 page(s), 3/19/1984)
- ML082321544 - Insp Repts 50-390/84-55 & 50-391/84-43 on 840716-20.No violations noted.Major areas inspected:compliance to 10CFR50,App R,Sections III.G & III.L & licensee identified items. (23 page(s), 8/21/1984)
- ML20207F176 - Requests sign-in list from Region III workshop on 10CFR50, App R. (1 page(s), 4/30/1984)
- ML20151T984 - Forwards evaluation of std fire protection Tech Specs. Encl changes should be incorporated into future revs. (8 page(s), 11/23/1984)
- ML082321543 - Forwards Insp Repts 50-390/84-55 & 50-391/84-43 on 840716-20.No violations noted. (2 page(s), 8/27/1984)
- ML20207E697 - Understands Div of Engineering will have insp/evaluation responsibility for Temporary Instructions 2515/61 & 2515/62 & IE Bulletin 83-03. (1 page(s), 3/20/1983)