"Const Progress,Feb 1983."
Accession Number: ML082170543
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082170541 - Responds to FOIA request for Caseload Forecast Panel files in Ofc of Resource Mgt.Forwards listed documents.Documents also available in PDR. (2 page(s), 6/6/1984)
- ML082170544 - Forwards updated const status repts as of 831231 for Watts Bar Units 1 & 2 & Bellefonte Units 1 & 2.Info for inclusion in NUREG-0300.June 1984 & Dec 1985 fuel load dates for Watts Bar Units 1 & 2,respectively. (9 page(s), 1/24/1984)
- ML082170545 - Forwards updated const status repts as of 840331 for Watts Bar Units 1 & 2 & Bellefonte Units 1 & 2.Info for inclusion in NUREG-0030. (9 page(s), 4/25/1984)
- ML082170546 - Forwards updated const status repts as of 830630 for Watts Bar Units 1 & 2 & Bellefonte Units 1 & 2.Info for inclusion in NUREG-0030. (5 page(s), 7/20/1983)
- ML082170548 - Forwards updated const status repts as of 830930 for Watts Bar Units 1 & 2 & Bellefonte Units 1 & 2.Info for inclusion in NUREG-0030. (5 page(s), 10/21/1983)
- ML082170550 - Forwards updated const status repts as of 821231 for Watts Bar Units 1 & 2 & Bellefonte Units 1 & 2.Info for inclusion in NUREG-0030. (2 page(s), 1/21/1983)
- ML082170553 - Forwards updated const status repts for Watts Bar Units 1 & 2 & Bellefonte Units 1 & 2 as of 820930 for inclusion in NUREG-0030.New method of calculating percent complete will be implemented by next reporting period. (5 page(s), 10/15/1982)
- ML082170554 - Forwards updated const status repts for Watts Bar & Bellefonte Nuclear Plants as of 830331,for inclusion in NUREG-0030. (5 page(s), 4/21/1983)
- ML082310422 - "Watts Bar Nuclear Plant Weekly Progress Rept & Analysis 790406-12." (42 page(s), 4/12/1979)
- ML082310454 - "Watts Bar Nuclear Plant Weekly Progress Rept & Analysis 790406-12." Proposed Agenda for Forecast Panel Meeting, May 1, 1979. (38 page(s), 4/12/1979)
- ML082310423 - "Const Progress, Jan 1983." Cover Page through Transfers Required to Support Report, Dated February 28, 1983. (40 page(s), 1/31/1983)
- ML082310457 - "Const Progress, Jan 1983." Transfers Required to Support Report, Dated February 28, 1983. (42 page(s), 1/31/1983)
- ML082310460 - "Const Progress, Jan 1983." Related Documentation. (43 page(s), 1/31/1983)
- ML082310424 - "Const Progress, Feb 1983." Cover Page through Page 15. (44 page(s), 2/28/1983)
- ML082310461 - "Const Progress, Feb 1983." Item VIII through Attachment B of WBNP-QCI-1.40, Rev. 4. (47 page(s), 2/28/1983)
- ML082310462 - "Const Progress, Feb 1983." Attachment B of WBNP-QCI-1.40, Rev. 4. (55 page(s), 2/28/1983)
- ML082310464 - "Const Progress, Feb 1983." Related Documentation. (56 page(s), 2/28/1983)
- ML20114E430 - Summary of 790402-04 site visit to evaluate fire protection program.List of areas of concerns encl. (7 page(s), 5/1/1979)
- ML20114F271 - Discusses estimated const completion schedule for Unit 2. More detailed plant specific best estimate fuel load date analysis for Unit 2 will be performed & results provided to Forecast Panel,util & general counsel. (2 page(s), 3/7/1978)
- ML20114F314 - PNO-III-80-131:on 800710,resident inspector notified that stop work was being placed on all electrical work & that 100 electricians would be laid-off effective 800711.Evaluation of all electrical work for compliance underway. (1 page(s), 7/10/1980)
- ML20115A577 - Summary of 780717 meeting w/utils re status of preoperational testing & Mark II containment fix.Meeting agenda & revised agenda encl. (13 page(s), 7/18/1978)
- ML20115A584 - Forwards updated const status repts as of 830327 for inclusion in const status rept (Yellow Book). (5 page(s), 5/17/1983)
- ML20115A586 - Forwards updated const status rept as of 830331 for inclusion in NUREG-0030. (3 page(s), 4/22/1983)
- ML20115A590 - Forwards updated const status rept as of 830331 for inclusion in NUREG-0030. (2 page(s), 5/3/1983)
- ML20115A592 - Forwards updated const status repts as of 830331 for inclusion in NUREG-0030. (6 page(s), 4/29/1983)
- ML20115A607 - Forwards updated const status repts as of 830331 for inclusion in NUREG-0030,in response to 811030 ltr. (4 page(s), 4/22/1983)
- ML20115A610 - Forwards updated const status repts as of 830331. (5 page(s), 4/29/1983)
- ML20115A613 - Forwards updated const status repts as of 820331 for inclusion in NUREG-0030.Fuel load date projected for Apr 1985.Commercial operation for Unit 1 scheduled for Dec 1985. Unit 2 remains not scheduled. (5 page(s), 4/15/1983)
- ML20115A616 - Forwards updated const status repts as of 830331. (4 page(s), 4/26/1983)
- ML20115A620 - Forwards updated const status rept as of 830331 for inclusion in Yellow Book.Total plant const 65.45% complete through Mar 1983. (3 page(s), 5/13/1983)
- ML20115A626 - Forwards updated const status repts as of 830430 for inclusion in NUREG-0030,per 830314 submittal. (3 page(s), 6/15/1983)
- ML20115A628 - Forwards updated const status rept as of 830331. (5 page(s), 6/6/1983)
- ML20115A634 - Forwards updated const status repts as of 830331 for inclusion in NUREG-0030. (5 page(s), 5/4/1983)
- ML20115A636 - Forwards updated const status rept as of 830331,for inclusion in NUREG-0030.Current project schedule indicates fuel load of Jan 1984.Commercial operation projected for Aug 1984. (6 page(s), 4/18/1983)
- ML20115A641 - Forwards updated const status repts for McGuire Unit 2, Catawba Units 1 & 2 & Cherokee Unit 1 as of 830331,per NUREG-0030.Rept last update for McGuire Unit 2 due to receipt of OL on 830303.Cherokee Unit 1 canceled on 830429. (9 page(s), 5/12/1983)
- ML20115A648 - Forwards updated const status rept as of 830331.Const approx 88% complete. (3 page(s), 4/30/1983)
- ML20115A654 - Forwards updated const status repts for LaSalle Unit 2, Byron Units 1 & 2 & Braidwood Units 1 & 2 as of 830331,for inclusion in NUREG-0030. (9 page(s), 4/27/1983)
- ML20115A657 - Forwards updated const status rept as of 830331.Rept reflects const progress of 62%.All indicate commercial operation date of 860501. (2 page(s), 4/22/1983)
- ML20115A660 - Forwards updated const schedule through Apr 1980.Const 67% complete.Fuel load date of Apr 1982 remains unchanged. (3 page(s), 5/14/1980)
- ML20115A664 - "Oct 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." Related documentation encl. (800 page(s), 10/31/1980)
- ML20115A672 - "Oct 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (7 page(s), 10/31/1980)
- ML20115A678 - "Sept 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (4 page(s), 9/30/1980)
- ML20115A683 - "Sept 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (6 page(s), 9/30/1980)
- ML20115A690 - "Aug 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (4 page(s), 8/31/1980)
- ML20115A693 - "Aug 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (6 page(s), 8/31/1980)
- ML20115A697 - "Jul 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (4 page(s), 7/31/1980)
- ML20115A706 - "Jul 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (8 page(s), 7/31/1980)
- ML20115A711 - "June 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (4 page(s), 6/30/1980)
- ML20115A714 - "June 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (10 page(s), 6/30/1980)
- ML20115A720 - "May 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (4 page(s), 5/31/1980)
- ML20115A723 - "May 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (8 page(s), 5/31/1980)
- ML20115A726 - "Apr 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (4 page(s), 4/30/1980)
- ML20115A731 - "Apr 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (9 page(s), 4/30/1980)
- ML20115A735 - "Mar 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (3 page(s), 3/31/1980)
- ML20115A739 - "Mar 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (8 page(s), 3/31/1980)
- ML20115A744 - "Feb 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (5 page(s), 2/28/1980)
- ML20115A747 - "Feb 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (7 page(s), 2/29/1980)
- ML20115A749 - "Jan 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (9 page(s), 1/31/1980)
- ML20115A754 - "Jan 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project." (6 page(s), 1/31/1980)
- ML20115A756 - PNS-III-81-008:on 810724,bomb threat received at site.Search discovered simulated bomb in sump pump assembly area of turbine bldg.Fingerprinting eliminated due to numerous handlings of device. (1 page(s), 7/27/1981)
- ML20115A761 - "Financing Union Electric Const Program." Viewgraphs encl. (174 page(s), 11/21/1979)
- ML20115A763 - Testimony of WS Lee before Subcommittee on Energy, Conservation & Power of House Committee on Energy & Commerce on 830608 supporting legislation to extend NRC authority to issue temporary OL for plant. (99 page(s), 6/8/1983)
- ML20115A766 - Disagrees w/proposed ltr to util re plant,per 830804 discussion.Draft of acceptable version encl for consideration.W/o encl. (1 page(s), 8/4/1983)
- ML20115A770 - Informs of Caseload Forecast Panel findings from 830727-28 meetings & site visit re const completion schedule May 1984 estimated fuel load date optimistic.Date will be used for planning purposes.Related documentation encl. (99 page(s), 8/4/1983)
- ML20115A774 - Forwards background info on plant for Commissioner Gilinsky trip,in response to request.Info obtained from inspectors, Region II,Ofc of Public Affairs,Ofc of Inspector & Auditor, OELD & Mgt Info Branch. (7 page(s), 9/16/1983)
- ML20115A777 - Summary of Caseload Forecast Panel 830712-14 meeting & site visit re projected fuel load date.Related documents encl. (2600 page(s), 9/26/1983)
- ML20115A781 - Package of documents re NRC Caseload Forecast Panel activities.W/173 oversize drawings.Aperture cards available in PDR. (1725 page(s), 4/19/1983)
- ML20115A792 - Forwards updated const status rept for Unit 1 as of 800201. Correction of discrepancies in 800108 rept also encl.Info for inclusion in NUREG-0030.Fuel load date changed from June 1980 to Sept 1980.Unit 2 schedule under review. (2 page(s), 3/13/1980)
- ML20115A795 - Forwards updated const status repts for LaSalle Units 1 & 2 & Byron Units 1 & 2 as of 791231 for inclusion in NUREG-0030.Status of Braidwood Units 1 & 2 remains unchanged. (7 page(s), 1/8/1980)
- ML20115A802 - Submits IE & NRR daily staff notes for 820312.All const & testing for LaSalle Unit 1 completed. (1 page(s), 3/15/1982)
- ML20115A807 - Agrees w/administratively closing 840209 FOIA-84-103 request for info re NRC Caseload Forecast Panel 830912-14 site visit,per 840223 telcon. (1 page(s), 2/27/1984)
- ML20115A811 - Requests info & documents re K Drey 840209 FOIA-84-103 request re NRC Caseload Forecast Panel 830912-14 site visit. Draft summary of NRC Caseload Forecast Panel 830912-14 site visit encl. (8 page(s), 2/13/1984)
- ML20115A814 - Marked-up draft summary of NRC Caseload Forecast Panel 840222-24 meeting w/util & site tour.List of attendees, meeting agenda & draft TM Novak ltr encl. (23 page(s), 4/11/1984)
- ML20115A818 - Marked-up draft summary of Caseload Forecast Panel 830111-13 meetings w/util & site visit re assessment of projected fuel load date.Meeting agenda,list of attendees,viewgraphs & News Release L-14 encl. (500 page(s), 1/27/1983)
- ML20115A822 - Summary of NRC Caseload Forecast Panel 801028-30 meetings w/util in Buckeye,AZ & 801029 site visit re plant const status.Meeting agenda,attendees & related info,including startup schedule milestones & NRC 831118 press release encl. (600 page(s), 11/6/1980)
- ML20115A825 - "Presentation to NRC Caseload Forecast Panel," on 820922. Related documentation encl. (600 page(s), 9/22/1982)
- ML20115A829 - Corrects error in 790312 summary of Caseload Forecast Panel 790227 & 28 site visits.Steam generator & reactor vessel placement begins in Aug & Sept 1979,respectively.NRC News Announcements 80-64 & 79-89 encl. (5 page(s), 4/12/1979)
- ML20115A836 - Confirms 790227 discussion re comments on effect of limited work authorizations on project effort & schedule.Facility 1.6% completed at issuance of CP. (2 page(s), 4/5/1979)
- ML20115A838 - Rev 0 to "Amended Statement of Policy During Suspension of Work Activities." List of active procedures & organizational directory encl. (15 page(s), 1/17/1984)
- ML20115A844 - Notifies of 790503 meeting w/J Coughin to reclaim results of Caseload Forecast Panel visit & conclusions & to discuss proposed tendering of FSAR in May.Proposed agenda & related documentation,including project schedule encl. (275 page(s), 4/17/1979)
- ML20115A851 - Suggests Fuel Load Forecast Panel meet w/util on 780826 at site to obtain info re completion of const & preoperational testing.Tentative agenda & related documentation encl. (30 page(s), 8/30/1978)
- ML20115A860 - PNS-V-81-008:on 810805,bomb threat received by telcon to radio station.Security force alerted.Systematic search in progress. (2 page(s), 8/5/1981)
- ML20115A865 - "Bechtel Design,Engineering & Procurement Mgt & Status." Related info encl. (225 page(s), 11/29/1978)
- ML20115A872 - "Limerick Generating Station,NRC Caseload Review,Feb 1984." (400 page(s), 2/29/1984)
- ML20115A877 - Notification of 780726 site visit w/util to discuss Salem Unit 2 fuel load date.Meeting agenda & draft summary of Caseload Forecast Panel 830330-31 meetings in West Feliciana Parish,LA re River Bend Unit 1 encl. (315 page(s), 7/7/1978)
- ML20115A884 - "Unit 1 Status,La Salle County Station,Station Const." Related info encl. (430 page(s), 3/27/1980)
- ML20115A888 - Requests documentation re encl R Sugarman FOIA-83-783 request for three categories of documents on plant.Response requested by 830110. (3 page(s), 12/28/1983)
- ML20115A889 - Informs of telcon w/R Sugarman re FOIA-83-783 request concerning const completeness estimates.Sugarman not interested in backup matl from Caseload Forecast Panel Apr 1983 meeting. (1 page(s), 1/20/1984)
- ML20115A890 - "Limerick Generating Station,Project Status Review Meeting," updated for NRC review.NRC News Announcement I-79-139 re establishment of resident inspector ofc at const site also encl. (850 page(s), 4/13/1983)
- ML20115A896 - Forwards updated const status repts as of 850930.Info for inclusion in NUREG-0030. (6 page(s), 10/31/1983)
- ML20115A901 - "South Texas Project,NRC Caseload Forecast." (73 page(s), 11/30/1983)
- ML20115A905 - "Limerick Generating Station,Facility Turnover,Field Planning & Scheduling." (50 page(s), 2/15/1984)
- ML20115A909 - "NRC Caseload Review,Feb 1984." (350 page(s), 2/29/1984)
- ML20116A880 - News Announcement 83-07 re hearing dates for plant OL/soils settlement proceedings in Midland, MI. (1 page(s), 3/8/1983)
- ML20127A175 - Forwards util 820504 ltr transmitting info re SER open items which will not be completed by core load.Supplemental SER input requested by 820625. (1 page(s), 6/2/1982)
- ML20127A310 - Summary of 821001 meeting w/util in Bethesda,MD re const completion date.Based on present estimated core load date, OL should be issued in mid-Dec. (3 page(s), 10/13/1982)
- ML20127C656 - Summary of 780606 & 07 meetings & site visit re collection of info on const & test completion for use by NRC Caseload Forecast Panel in estimating fuel load date.Related info encl. (175 page(s), 7/7/1978)
- ML20127C663 - Discusses estimates of fuel load date.Util will propose Sept 1983 as fuel load date.Resident inspectors estimate Dec 1983 plus or minus 2 months. (1 page(s), 2/23/1983)
- ML20127C668 - Documents 840504 discussion w/WG Counsil re projected fuel load Sept 1984 fuel load possible if changes made,including rev to existing sys of room turnover to sys turnover. (1 page(s), 5/4/1984)
- ML20127C671 - Notifies of reassignment of OL review from R Naventi,S Varga & M Service to S Burwell,R Baer & J Lee. (1 page(s), 2/1/1979)
- ML20127C674 - Forwards updated const status repts as of 831231 for LaSalle Unit 2,Bryon Units 1 & 2 & Braidwood Units 1 & 2.Info for inclusion in NUREG-0030. (5 page(s), 1/30/1984)
- ML20127C681 - "Status of Comanche Peak Steam Electric Station Unit 1,Apr 1984." NRC News Announcements 79-22 & 80-14 re reactor vessel support structure misorientation & ASLB 800430 prehearing conference in Fort Worth,TX also encl. (375 page(s), 4/30/1984)
- ML20127C687 - Comments on encl draft rept on Caseload Forecast Panel 790320-21 meeting w/util.Recommends Apr 1981 date be changed to Dec 1981 w/caveat of further changes.Related documents encl. (900 page(s), 4/2/1979)
- ML20127C696 - Notification of 771026 meeting w/util in R Boyd ofc to discuss final resolution of outstanding items.Date & time changed.Related info encl. (130 page(s), 9/26/1977)
- ML20127C703 - "Presentation to NRC Caseload Forecast Panel," on 830126. (240 page(s), 1/31/1983)
- ML20127C709 - Discusses update info re const & testing status of facility. Listing of outstanding items & status encl.Addl items may be identified during insp.Util projects 780424 as fuel load date.Region IV projects 780601.Related info encl. (36 page(s), 3/7/1978)
- ML20127C715 - Forwards updated const status rept as of 831227.Commercial operation scheduled for 860501. (3 page(s), 1/19/1984)
- ML20127C719 - Forwards updated const status rept as of 840331.Info for inclusion in NUREG-0030.Const completed & fuel loading commenced. (3 page(s), 4/6/1984)
- ML20127C723 - Forwards updated const status repts as of 840331.Temporary suspension of const announced 840418. (5 page(s), 5/4/1984)
- ML20127C727 - "TVA,Div of Const,Project Trend Analysis,Manpower/Progress/ Schedule." (200 page(s), 7/30/1981)
- ML20127C732 - Summary of 770706-08 site visit re const progress,schedule & estimated fuel load date. (4 page(s), 8/17/1977)
- ML20127C737 - Notification of 770912 meeting w/util in R Boyd ofc to discuss licensing review schedule. (2 page(s), 8/26/1977)
- ML20127C742 - Summary of 770727 followup site visit re evaluation of const progress & fuel load date. (2 page(s), 8/17/1977)
- ML20127C745 - Requests attendance at 770822 meeting w/util in R Boyd ofc to discuss fuel load date. (1 page(s), 8/10/1977)
- ML20127C748 - Notification of 770822 meeting w/util in R Boyd ofc to discuss const/preoperational testing schedule. (2 page(s), 8/10/1977)
- ML20127C752 - Notification of 771019 meeting w/util in R Boyd ofc to discuss final resolution of outstanding items. (2 page(s), 9/26/1977)
- ML20127C757 - Informs of need to prepare to talk w/Haller. (2 page(s), 6/2/1978)
- ML20127C763 - Notification of 780412-13 site visit w/util to discuss actual fuel load date. (2 page(s), 3/30/1978)
- ML20127C766 - Summary of NRC Caseload Forecast Panel 810921-23 site visit re const progress & current & future const plans.Completion of Unit 1 unlikely before Apr 1984. (11 page(s), 10/29/1981)
- ML20127C772 - Forwards updated const status rept as of 840331. (3 page(s), 4/11/1984)
- ML20127C776 - Forwards updated const status rept as of 840331. (3 page(s), 4/20/1984)
- ML20127C781 - "TVA,Div of Engineering Design,Project Trend Analysis, Manpower/Progress/Schedule," for 810628-0725. (125 page(s), 7/25/1981)
- ML20127C786 - Forwards updated const status rept as of 840331.Info for inclusion in NUREG-0030.Unit 1 const 83.4% completed.Target date for fuel load remains at 860103. (5 page(s), 5/2/1984)
- ML20127C791 - Requests Caseload Forecast Panel site visit be rescheduled for 830324 & 25 due to ASLB request for independent assessment of applicant fuel load date. (390 page(s), 3/18/1983)
- ML20127C800 - Forwards updated const status rept as of 840324.Info for inclusion in NUREG-0030.Unit 1 fuel load date scheduled for Apr 1985.Commercial operation planned for Dec 1985.Unit 2 canceled on 840105. (5 page(s), 4/16/1984)
- ML20127C807 - Forwards updated const status repts as of 840419 for LaSalle Unit 2,Bryon Units 1 & 2 & Braidwood Units 1 & 2.Info for inclusion in NUREG-0030. (11 page(s), 4/19/1984)
- ML20127C814 - Forwards updated const status rept as of 840331.Const 77.5% completed.On 840403 announced that commercial operation delayed until late 1986. (5 page(s), 4/25/1984)
- ML20127C820 - Forwards updated const status rept as of 790831.Specific schedule changes listed.Related info encl.W/o rept. (7 page(s), 9/13/1979)
- ML20127C826 - Forwards updated const status repts as of 790901.Info for inclusion in Yellow Book.Related info encl.Preoperational testing program has been merged for both units. (14 page(s), 9/11/1979)
- ML20127C831 - Provides daily staff notes for 780911.Fault observed in emergency svc water discharge tunnel at Perry.Util review program rejected all installed hangers inspected in May-Aug 1978 at Fermi 2.Stop-work order issued. (2 page(s), 9/12/1978)
- ML20127C834 - Forwards updated const status repts as of 821201.Info for inclusion in NUREG-0030. (3 page(s), 12/3/1982)
- ML20127C839 - Forwards updated const status repts as of 820930. (5 page(s), 10/25/1982)
- ML20127C845 - Notifies of 780606-07 meetings at facility & in Detroit,MI to discuss const status & schedule & to enable NRC Forecast Panel to confirm fuel load date.Agenda & related info encl. (635 page(s), 5/30/1978)
- ML20127C853 - Repts on 770628-30 visit to plant site for evaluation of const & preoperational test progress.Related info encl. (26 page(s), 8/15/1977)
- ML20127C858 - Forwards updated const status rept as of 820930.Info for inclusion in NUREG-0030. (3 page(s), 10/29/1982)
- ML20127C863 - Forwards updated const status rept as of 830930.Info for inclusion in NUREG-0030.Related info encl. (48 page(s), 11/7/1983)
- ML20127C870 - Provides daily staff notes for 811106.Sequoyah 2 achieved initial criticality.Util informed NRC that Brown & Root has withdrawn completely from South Texas Project. (1 page(s), 11/9/1981)
- ML20127C876 - Forwards annotated corrected const status repts as of 820930.Info for inclusion in NUREG-0030. (6 page(s), 10/27/1982)
- ML20127C880 - Summary of 770912 meeting w/util re resolution of outstanding issues.Attendance list encl. (4 page(s), 9/26/1977)
- ML20127C884 - Forwards updated const status rept as of 820930.Info for inclusion in NUREG-0030. (2 page(s), 10/27/1982)
- ML20127C890 - Notification of 771020 meeting w/util in R Boyd ofc to discuss final resolution of outstanding items.Time & date changed. (4 page(s), 9/26/1977)
- ML20127C895 - Provides daily staff notes for 810925.Notices of violation issued to utils for failure to notify NRC by 810701 of inability to complete implementation of prompt public notification sys. (1 page(s), 9/28/1981)
- ML20127C900 - Forwards updated const status repts as of 820930.Info for inclusion in NUREG-0030.Unit 1 has loaded fuel & in operations startup mode. (5 page(s), 11/16/1982)
- ML20127C905 - Forwards agenda for 771025 meeting w/util to discuss SER open items. (3 page(s), 10/24/1977)
- ML20127C910 - Forwards updated const status rept as of 830630.Related info also encl. (250 page(s), 8/8/1983)
- ML20127C915 - Forwards updated const status repts as of 821003.Info for inclusion in Yellow Book. (5 page(s), 10/13/1982)
- ML20127C918 - Forwards updated const status rept as of 830630.Const approx 90.5% complete.Related info also encl. (125 page(s), 7/27/1983)
- ML20127C925 - Forwards updated const status repts as of 820930.Info for inclusion in NUREG-0030. (5 page(s), 10/25/1982)
- ML20127C933 - Forwards updated const status repts as of 830630.Info for inclusion in NUREG-0030. (5 page(s), 7/29/1983)
- ML20127C936 - Forwards updated const status repts as of 830630.Info for inclusion in NUREG-0030. (5 page(s), 7/15/1983)
- ML20127C941 - Forwards updated const status repts as of 830630 for LaSalle Unit 2,Byron Units 1 & 2 & Braidwood Units 1 & 2.Info for inclusion in NUREG-0030.Related documentation also encl. (300 page(s), 7/26/1983)
- ML20127C949 - Forwards corrected pages from Oct 1982 const status rept for update of NUREG-0030 through Third Quarter 1983.Dec 1982, Mar,June & Sept 1983 repts not yet received. (6 page(s), 10/31/1983)
- ML20127C957 - Forwards updated const status repts as of 830630. (4 page(s), 7/8/1983)
- ML20127C963 - Notifies of util 780419 telcon informing of in-depth audit of const schedule re submittal of FSAR.Util will inform of results. (1 page(s), 4/19/1978)
- ML20127C970 - Forwards updated const status rept as of 830630.Info for inclusion in Yellow Book.Const 72.53% completed. (3 page(s), 8/15/1983)
- ML20127C977 - Notifies that util informed B Perch that ltr sent to H Denton stating that commercial operation scheduled for Dec 1985.Fuel load date expected to slip to Apr or June 1985. Related documents encl. (127 page(s), 11/13/1981)
- ML20127C983 - Requests work w/M Licitra to arrange proposal of visit on 841213-15. (1 page(s), 10/4/1978)
- ML20127C987 - Forwards updated const status repts as of 830731.Info for inclusion in NUREG-0030. (5 page(s), 9/15/1983)
- ML20127C994 - Forwards background info for Gilinsky trip to facility in response to request. (7 page(s), 8/17/1983)
- ML20127D000 - Notifies of agreement to postpone visit two to three months to allow completion of util reassessment of const schedule. NRC 781228 press release re 780111 scheduled NRC prehearing conference in Houston,TX on facilities encl. (3 page(s), 10/3/1978)
- ML20127D004 - Forwards updated const status repts as of 830630.Info for inclusion in NUREG-0030. (5 page(s), 8/16/1983)
- ML20127D007 - "Startup Program Rept,Jul 1982." Incomplete 791031 Press Release I-79-144 encl. (44 page(s), 8/3/1982)
- ML20127D013 - Forwards util ltr formalizing new fuel load dates of Nov 1981 & Nov 1982 for Units 1 & 2,respectively.Dates consistent w/Caseload Forecast Panel dates. (1 page(s), 10/30/1978)
- ML20127D017 - Notification of 780405-06 meetings w/util & Brown & Root in Wadsworth,TX to review const status & obtain info for independent estimate of fuel load date for Unit 1.Related documents encl. (270 page(s), 3/30/1978)
- ML20127D025 - Notification of 820930 meeting w/util in Bethesda,MD re const completion date. (1 page(s), 9/27/1982)
- ML20127D030 - Forwards const/start-up progress rept update for Feb 1982. (2 page(s), 3/16/1982)
- ML20127D034 - Forwards updated const status rept as of 830630.Const 67.8% completed.Commercial operation planned for 860501. (5 page(s), 7/18/1983)
- ML20127D039 - Forwards updated const status rept as of 830927.Const 73.1% completed.Commercial operation planned for 860501. (3 page(s), 10/12/1983)
- ML20127D043 - Forwards documents borrowed previous Friday.Related documents encl. (1300 page(s), 2/8/1984)
- ML20127D052 - Forwards updated const status repts as of 830930 for LaSalle Unit 2,Bryon Units 1 & 2 & Braidwood Units 1 & 2.Info for inclusion in NUREG-0030. (9 page(s), 10/27/1983)
- ML20127D056 - "WH Zimmer Nuclear Power Station Unit 1 Mgt Summary Analysis 810210." (560 page(s), 2/10/1981)
- ML20127D064 - Forwards updated const status rept as of 830930.Unit 1 const approx 92.6% completed. (3 page(s), 10/28/1983)
- ML20127D067 - "WH Zimmer Nuclear Power Station Schedule Analysis 781107." (150 page(s), 11/7/1978)
- ML20127D073 - Confirms 781122 telcons re discrepancies between Sys Const CPM Network Schedules,Sheets 44 & 45 & Computer I-J 781108 listing.Summary of discussions & resulting actions presented.Related documents encl. (325 page(s), 11/27/1978)
- ML20127D083 - Requests approval of Caseload Forecast Panel visit to facility on 820707-08. (300 page(s), 6/7/1982)
- ML20127D092 - "Project Status Rept," for period ending 791031.Rept presented at monthly const coordination 781107 meeting. (54 page(s), 11/7/1978)
- ML20127D097 - Forwards updated const status repts as of 830925.Info for inclusion in NUREG-0030. (5 page(s), 11/15/1983)
- ML20127D101 - "WH Zimmer Nuclear Power Station Schedule Analysis,781107." (300 page(s), 11/7/1978)
- ML20127D109 - "Level I Mgt Info Rept." (62 page(s), 1/31/1980)
- ML20127D115 - Forwards updated const status rept as of 830930.Info for inclusion in NUREG-0030.Unit 2 canceled on 831014.Unit 1 const 81.7% completed.Target date for fuel load remains at 860103. (5 page(s), 10/27/1983)
- ML20127D118 - Provides daily staff notes for 790629.Reinspection found improper installation of concrete anchors at WPPS 2.Fatal const accident occurred at Indian Point 2.Shoreham fuel load date slipped five months to Nov 1980. (1 page(s), 7/2/1979)
- ML20127D123 - Forwards updated const status repts as of 830630.Info for inclusion in NUREG-0030. (8 page(s), 7/25/1983)
- ML20127D130 - Responds to 781211 ltr re application of open meeting policy to facility review meetings.Notices & summaries of all meetings falling within open meeting policy will be provided. (1 page(s), 1/16/1979)
- ML20127D135 - Confirms 810121 telcon re electrical installation rates. Refinements to 810115 calculations encl.Related documentation re const schedule encl. (1000 page(s), 1/21/1981)
- ML20127D143 - "Independent Design Review,Shoreham Nuclear Power Station." (31 page(s), 3/10/1983)
- ML20127D150 - Requests response to listed questions re K Drey FOIA-84-103 request concerning Caseload Forecast Panel assessment of observations & analyses of util presentations during 830912-14 site visit by 840221. (3 page(s), 2/13/1984)
- ML20127D155 - FOIA request for documents re NRC Caseload Forecast Panel 830912-14 site visit. (1 page(s), 2/9/1984)
- ML20127D163 - Forwards Insp Rept 50-322/77-14 on 770801-04.No noncompliance noted. (2 page(s), 8/19/1977)
- ML20127D169 - Confirms 840223 telcon re administrative closing of 840209 FOIA request re Caseload Forecast Panel 830912-14 site visit.Panel review incomplete.NRC analysis of util const schedule requested. (1 page(s), 2/27/1984)
- ML20127D175 - Forwards updated const status repts as of 830930.Info for inclusion in NUREG-0030. (5 page(s), 10/21/1983)
- ML20127D180 - "Preoperational Test Schedule." (35 page(s), 10/13/1982)
- ML20127D184 - "Preoperational & Acceptance Test Schedule." Related documentation encl. (650 page(s), 10/11/1982)
- ML20127D190 - Forwards updated const status rept as of 830930. (5 page(s), 11/15/1983)
- ML20127D198 - Insp Rept 50-322/77-14 on 770801-04.No noncompliance noted. Major areas inspected:review of const & startup schedule, procedures,work performance & test records.Related documents encl. (530 page(s), 8/18/1977)
- ML20127D209 - Forwards updated const status rept as of 830930.Info for inclusion in Yellow Book.Const 78.82% completed. (3 page(s), 11/14/1983)
- ML20127D216 - Forwards updated const status repts as of 830930. (4 page(s), 11/3/1983)
- ML20127D222 - Marked-up draft summaries of Caseload Forecast Panel 830927-29 meetings w/util & site tour re projection of fuel load date. (375 page(s), 10/18/1983)
- ML20127D227 - Provides daily staff notes for 780913.Meeting held w/Nuclear Fuel Svcs re inventory differences at Erwin,TN facility. Operating engineers went on strike,stopping work at site. NRC 810812 press release encl. (2 page(s), 9/14/1978)
- ML20127D233 - Forwards exerpts from util monthly repts re const scheduling since Jan 1980.Util can supply repts on regular basis upon request.NRC News Announcement 81-45 re ASLB plans to conduct public hearing on OL also encl.W/o rept excerpts. (2 page(s), 11/26/1980)
- ML20127D238 - Forwards updated const status repts as of 830930.Info for inclusion in NUREG-0030.Unit fuel load currently projected for Apr 1985 w/commercial operation by Dec 1985.Unit 2 remains "not scheduled." (5 page(s), 10/14/1983)
- ML20127D243 - Provides const status update rept as of 790122.No milestone activities started or completed during Jan 1979. (2 page(s), 2/5/1979)
- ML20127D249 - Conveys thanks for info re inservice date of plant.Updates of info requested.NRC News Announcements 79-88,79-99,81-90 & 81-91 re emergency planning,ASLB 791114-16 hearings in Cincinnati,OH & const problems encl. (5 page(s), 9/13/1979)
- ML20127D255 - News Announcement 83-03 re 830208 public meeting w/util in Midland,MI to discuss proposed const completion program. Incomplete News Announcement 83-08 & related info encl. (1050 page(s), 1/29/1983)
- ML20127D265 - Forwards updated const status repts as of 830930. (6 page(s), 11/3/1983)
- ML20127D269 - Forwards updated const status rept as of 821231.Commercial operation scheduled for 860501. (5 page(s), 1/20/1983)
- ML20127D275 - Forwards updated const status rept.Info for inclusion in NUREG-0030.W/o encl. (1 page(s), 8/7/1979)
- ML20127D279 - Forwards annotated corrected pages to Oct 1982 const status repts updating NUREG-0030 through Third Quarter 1983. (6 page(s), 10/31/1983)
- ML20127D282 - Forwards updated const status repts as of 821226.Info for inclusion in Yellow Book. (5 page(s), 2/14/1983)
- ML20127D287 - Forwards updated const status rept as of 821231.Info for inclusion in NUREG-0030. (3 page(s), 2/24/1983)
- ML20127D293 - Forwards updated const status repts as of 830930.Info for inclusion in NUREG-0030. (3 page(s), 11/14/1983)
- ML20127D298 - Summarizes Fuel Load Panel 780504 & 05 meetings w/util & Bechtel & site trip re const status.Related documents encl. (900 page(s), 8/22/1978)
- ML20127D310 - Forwards updated const status repts as of 821231.Info for inclusion in NUREG-0030. (6 page(s), 1/28/1983)
- ML20127D314 - Forwards updated const status repts as of 831231.Info for inclusion in NUREG-0030.Unit 1 const 82.6% completed.Target date for fuel load remains at 860103. (5 page(s), 1/26/1984)
- ML20127D318 - Forwards updated const status rept as of 821231.Info for inclusion in NUREG-0030. (3 page(s), 1/27/1983)
- ML20127D325 - Forwards updated const status repts as of 821231.Info for inclusion in NUREG-0030. (9 page(s), 1/14/1983)
- ML20127D331 - Forwards updated const status repts as of 831231.Info for inclusion in NUREG-0030. (5 page(s), 2/20/1984)
- ML20127D336 - Forwards updated const status repts as of 821231.Info for inclusion in Yellow Book.Const 60.09% complete. (3 page(s), 2/9/1983)
- ML20127D343 - Forwards updated const status repts as of 830101.Info for inclusion in Yellow Book. (5 page(s), 1/14/1983)
- ML20127D349 - Forwards updated const status repts as of 830130.Info for inclusion in NUREG-0030. (3 page(s), 3/14/1983)
- ML20127D354 - Forwards updated const status repts as of 831231.Info for inclusion in NUREG-0030.Unit 1 fuel load date currently projected for Apr 1985.Commercial operation scheduled for Dec 1985.Util voted on 840105 not to build Unit 2. (5 page(s), 1/13/1984)
- ML20127D361 - Forwards updated const status repts as of 830101.Info for inclusion in NUREG-0030.Unit 1 fuel load date advanced to 840801.Unit 2 target fuel load date remains at 880401. (7 page(s), 1/28/1983)
- ML20127D367 - Forwards annotated corrected pages to June 1982 const status repts updating NUREG-0030 through Fourth Quarter 1983. (6 page(s), 2/29/1984)
- ML20127D373 - Forwards updated const status repts as of 821231 for LaSalle Unit 2,Byron Units 1 & 2 & Braidwood Units 1 & 2.Info for inclusion in NUREG-0030. (11 page(s), 1/26/1983)
- ML20127D378 - Forwards updated const status repts as of 830925.Info for inclusion in Yellow Book. (5 page(s), 10/28/1983)
- ML20127D382 - Forwards updated const status rept as of 830930.Info for inclusion in NUREG-0030. (4 page(s), 10/20/1983)
- ML20127D387 - Forwards updated const status rept as of 831231. (3 page(s), 1/28/1983)
- ML20127D392 - Forwards updated const status repts as of 821231.Info for inclusion in NUREG-0030. (5 page(s), 1/27/1983)
- ML20127D395 - Forwards updated const status repts as of 821231.Info for inclusion in NUREG-0030.Unit 1 const 87% complete.Target date of 840103 for fuel load unchanged. (6 page(s), 1/26/1983)
- ML20127D401 - Forwards updated const status rept as of 831231.Info for inclusion in NUREG-0030. (4 page(s), 1/25/1984)
- ML20127D407 - Forwards updated const status rept as of 831231.Info for inclusion in NUREG-0030. (3 page(s), 2/14/1984)
- ML20127D413 - Forwards updated const status repts as of 831130. (6 page(s), 2/3/1984)
- ML20127D419 - Forwards updated const status rept as of 831231.Info for inclusion in Yellow Book.Const 80% completed. (3 page(s), 2/15/1984)
- ML20127D423 - Forwards updated const status rept as of 831231. (3 page(s), 1/20/1984)
- ML20127D427 - Clarifies 830126 ltr re const status.Const schedule under evaluation.Revised schedule anticipated by June 1983. (1 page(s), 2/3/1983)
- ML20127D431 - Forwards updated const status rept as of 831231.Unit 2 canceled on 831221. (5 page(s), 1/23/1984)
- ML20127D435 - Forwards updated const status repts as of 821231.Info for inclusion in NUREG-0030.Fuel load target date for Catawba Unit 1 May 1984. (11 page(s), 2/3/1983)
- ML20127D438 - Forwards updated const status rept as of 831231.Unit 1 const approx 95% completed. (7 page(s), 1/20/1984)
- ML20127D452 - Forwards updated const status rept as of 821228.Unit 1 const approx 86% complete. (3 page(s), 1/20/1983)
- ML20127D458 - Forwards updated const status rept as of 820930.Info for inclusion in NUREG-0030. (4 page(s), 9/30/1982)
- ML20127D463 - Forwards updated const status rept as of 821231.Info for inclusion in NUREG-0030. (4 page(s), 2/7/1983)
- ML20127D470 - Forwards updated const status repts as of 830630. (6 page(s), 7/29/1983)
- ML20127D477 - Forwards updated const status rept as of 830630.Info for inclusion in NUREG-0030. (4 page(s), 7/25/1983)
- ML20127D482 - Forwards updated const status repts as of 830619.Info for inclusion in Yellow Book. (8 page(s), 8/15/1983)
- ML20127D489 - Forwards updated const status repts as of 820930.Info for inclusion in NUREG-0030.Unit 1 fuel load date projected for Apr 1985 w/commercial operation by Dec 1985.Unit 2 remains unscheduled. (10 page(s), 10/13/1982)
- ML20127D493 - Forwards updated const status repts as of 820930. (4 page(s), 10/13/1982)
- ML20127D497 - Forwards updated const status rept as of 821029.Info for inclusion in NUREG-0030. (3 page(s), 10/27/1982)
- ML20127D501 - Forwards updated const status rept as of 820930 for inclusion in Yellow Book.Plant const 56.7% complete. (4 page(s), 11/15/1982)
- ML20127D505 - Forwards updated const status rept as of 820930 for inclusion in NUREG-0030. (3 page(s), 10/6/1982)
- ML20127D510 - Forwards updated const status repts as of 821001 for inclusion in Yellow Book.Const 83% complete. (5 page(s), 10/25/1982)
- ML20127D513 - Forwards updated const status repts as of 820930 for inclusion in NUREG-0030. (3 page(s), 10/29/1982)
- ML20127D520 - Forwards updated const status repts as of 821001 for inclusion in NUREG-0030.Unit 2 fuel load date currently under review due to ruling to defer/cancel facility by Pennsylvania Public Util Commission. (5 page(s), 10/19/1982)
- ML20127D526 - Forwards updated const status repts as of 820930 for inclusion in NUREG-0030. (7 page(s), 10/20/1982)
- ML20127D532 - Forwards updated const status repts as of 820930 for inclusion in NUREG-0030.Unit 1 const estimated at 85.8% complete w/fuel load targeted for 840103. (6 page(s), 10/25/1982)
- ML20127D539 - Forwards updated const status rept as of 820930.Fuel load date rescheduled for 840402.Commercial operation will occur in late 1984 or early 1985. (13 page(s), 10/25/1982)
- ML20127D543 - Forwards updated const status repts for LaSalle Units 1 & 2, Byron Units 1 & 2 & Braidwood Units 1 & 2 as of 820930 for inclusion in NUREG-0030. (9 page(s), 10/27/1982)
- ML20127D549 - Forwards updated const status rept as of 820930,reflecting const progress of 60.1%.Commercial operation date of 860531 remains unchanged. (4 page(s), 10/28/1982)
- ML20127D552 - Forwards updated const status rept as of 830331 for inclusion in NUREG-0030,per RA Hartfield 811030 request. (8 page(s), 4/22/1983)
- ML20127D584 - Repts on 770629-30 visit to facility for review of const activities & schedules to determine if schedules for completion,testing & fuel load realistic.Apr 1978 fuel load date realistic.Related info encl. (190 page(s), 7/12/1977)
- ML20132A903 - Discusses differences between caseload forecast panel visits & mgt meetings.Project managers should plan mgt level meetings w/listed plants to resolved differences in const completion estimates. (3 page(s), 1/25/1982)
- ML20261C150 - "Reactor Building Network." Status as of 831121 Drowing date illegible. (1 page(s), 6/6/1984)
- ML20261C155 - "Preliminary Operations Network Level II Detroit Edison Company Enrico Fermi Unit 2." Drawing consists of two aperture cards. (1 page(s), 7/2/1981)
- ML20261C160 - "Project Summary Network." Status as of 820911.Drawing consists of three aperture cards. (1 page(s), 9/11/1982)
- ML20261C164 - "Startup Sequence Schedule Balance of Plant HVAC Electrical." Sheet 1 of 2. (1 page(s), 6/14/1982)
- ML20261C170 - "Startup Sequence Schedule NSSS Const & W.P. System." Sheet 2 of 2. (1 page(s), 6/14/1982)
- ML20261C176 - "Construction Schedule." (1 page(s), 7/5/1978)
- ML20261C182 - "Integrated Milestone Schedule Clinton Power Station Status As of July 31,1983." Sheet 1 of 1.Drawing consists of two aperture cards. (1 page(s), 8/7/1983)
- ML20261C186 - "Plant Startup Schedule Turnover/Performance Tests Unit 1 and Common." Drawing consists of two aperture cards. (1 page(s), 12/7/1981)
- ML20261C192 - "Startup Summary Schedule Unit 2 Status as of:May 1,1983." Sheet 1 of 1. (1 page(s), 7/21/1983)
- ML20261C198 - "HOT OPS Milestone." Sheet 1 of 1. (1 page(s), 8/8/1980)
- ML20261C203 - "Fuel Receipt Milestone." Sheet 1 of 1. (1 page(s), 7/15/1980)
- ML20261C208 - "Project Schedule." Sheet 1 of 3. (1 page(s), 7/24/1980)
- ML20261C213 - "Project Schedule." Sheet 2 of 3. (1 page(s), 7/24/1980)
- ML20261C220 - "Project Schedule." Sheet 3 of 3. (1 page(s), 7/24/1980)
- ML20261C225 - "Turbine Generator Milestone." Sheet 1 of 1. (1 page(s), 9/11/1980)
- ML20261C230 - "RPV Hydro Milestone." Sheet 1 of 1. (1 page(s), 7/24/1980)
- ML20261C236 - "Integrated Emergency Core Cooling Loss-Of-Power Preoperational Testing." Sheet 1 of 1. (1 page(s), 4/16/1980)
- ML20261C240 - "Condenser Vacuum Milestone." Sheet 1 of 1. (1 page(s), 4/1/1980)
- ML20261C245 - "Containment SIT/ILRT." Sheet 1 of 1. (1 page(s), 4/24/1980)
- ML20261C251 - "Radwaste Milestone." Sheet 1 of 1. (1 page(s), 4/16/1980)
- ML20261C256 - "Project Milestone Schedule PWR 1300 MW Unit 1." (1 page(s), 9/30/1980)
- ML20261C261 - "Project Master Schedule." (1 page(s), 8/8/1980)
- ML20261C266 - "EBASCO Site Construction Organization." (1 page(s), 7/16/1982)
- ML20261C271 - "Fuel Load Milestone." Sheet 1 of 1.Drawing date illegible. (1 page(s), 6/6/1984)
- ML20261C277 - "Wolf Creek Start-Up Schedule." Sheet 1 of 4.No drawing date. (1 page(s), 6/6/1984)
- ML20261C282 - "Wolf Creek Start-Up Schedule." Sheet 2 of 3.No drawing date. (1 page(s), 6/6/1984)
- ML20261C286 - "Wolf Creek Start-Up Schedule." Sheet 3 of 4.No drawing date. (1 page(s), 6/6/1984)
- ML20261C292 - "Wolf Creek Start-Up Schedule." Sheet 4 of 4.No drawing date. (1 page(s), 6/6/1984)