Home > NRC Library > ADAMS Public Documents
Peach Bottom Unit 2 and 3, Response to Request for Additional Information Concerning License Amendment - Application of Alternative Source Team.
Accession Number: ML080670277
Date Released: Monday, March 17, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML080670041 - Peach Bottom, Unit 2 and 3, Response to Request for Additional Information Concerning License Amendment - Application of Alternative Source Team. (9 page(s), 2/28/2008)
- ML080670043 - Peach Bottom, Units 2 and 3, PBAPS Calculation 1-1, Revision 1, "Stress Analysis for Main Steam Outside Containment". (236 page(s), 2/28/2008)
- ML080670044 - Peach Bottom, Units 2 and 3, PBAPS Calculation PS-049, Revision 2, "Seismic Evaluation of Consoles 2(3)OCO5A, 2(3)OCO4A and 2(3)0C03 for Mod 955". (81 page(s), 2/28/2008)
- ML080670045 - Peach Bottom, Units 2 and 3, PBAPS Calculation G-0106-002, Revision 4, "Control Room Upgrading HVAC Duct Supports". (87 page(s), 2/28/2008)
- ML080670265 - Peach Bottom, Units 2 and 3, PBAPS Calculation 23-4/X-1, Revision 0, "Reactor Building - H&V Ducts, Seismic Analysis". (34 page(s), 2/28/2008)
- ML080670192 - Peach Bottom, Units 2 and 3, PBAPS Calculation 49-48/H-, Revision 0, "Heating and Ventilation - Seismic Analysis for Anchor Bolts". (40 page(s), 2/28/2008)