Home > NRC Library > ADAMS Public Documents
09/27-28-29/2005-Summary and Meeting Handouts Regarding ESBWR Design Certification Application.
Accession Number: ML052840003
Date Released: Tuesday, October 11, 2005
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML052840004 - ESBWR Drawings for 09/27/2005 Meeting. (10 page(s), 9/27/2005)
- ML052840006 - Chapter 3 - Summary - ESBWR Design Control Document, Tier 2-Design of Structures, Components, Equipment and Systems. (22 page(s), 9/27/2005)
- ML052840007 - ESBWR Structural Design Overview 09/27/2005 Presentation. (24 page(s), 9/27/2005)
- ML052840010 - 09/27/2005 Presentation for Meeting with General Electric - ESBWR Design Control Document Tier 2 - Chapter 4 - Reactor. (19 page(s), 9/27/2005)
- ML052840012 - 09/29/2005 Presentation for Meeting with General Electric, ESBWR Core and Fuel. (45 page(s), 9/29/2005)
- ML052840013 - 09/27/2005 Presentation for Meeting with General Electric, Chapter 5 - Reactor Coolant System and Connected Systems. (12 page(s), 9/27/2005)
- ML052840015 - 09/27/2005 Presentation for Meeting with General Electric, Chapter 5 - Overpressure Protection and Chapter 6 - LOCA Analysis. (48 page(s), 9/27/2005)
- ML052840017 - 09/27/2005 Presentation for Meeting with General Electric, Chapter 6 - Engineered Safety Features. (32 page(s), 9/27/2005)
- ML052840018 - Chapter 8 - ESBWR Electrical Power System Overview. (21 page(s), 9/27/2005)
- ML052840019 - 09/27/2005 Presentation for Meeting with General Electric, Chapter 9 - ESBWR Auxiliary Systems Overview. (28 page(s), 9/27/2005)
- ML052840020 - Chapter 9 - Auxiliary Systems - FAPCS. (7 page(s), 9/28/2005)
- ML052840021 - 09/27/2005 Presentation for meeting with General Electric, Chapter 10 - Steam and Power Conversion System Overview. (18 page(s), 9/27/2005)
- ML052840022 - 09/28/2005 Presentation for Meeting with General Electric, Chapters 11, 12, 13, and 14 - ESBWR DCD. (7 page(s), 9/28/2005)
- ML052840025 - 09/27/2005 Presentation for Meeting with General Electric, ESBWR Core and Fuel. Chapter 15 - Safety Analyses. (100 page(s), 9/28/2005)
- ML052840026 - 09/29/2005 Presentation for Meeting with General Electric, Chapter 18 - Human Factors Engineering. (9 page(s), 9/29/2005)
- ML052840029 - 09/29/2005 Presentation for Meeting With General Electric, Chapter 18 - Human Factors Engineering. (9 page(s), 9/29/2005)
- ML052840033 - 09/29/2005 Presentation for Meeting with General Electric, Chapter 19 - ESBWR Probabilistic Risk Assessment and Severe Accident Treatment. (86 page(s), 9/29/2005)
- ML052840036 - 09/27/2005 Presentation for Meeting with General Electric, NRC Executive Overview of the ESBWR. (67 page(s), 9/27/2005)
- ML052840041 - 09/28/2005 Presentation for Meeting with General Electric, Chapter 7 - Instrumentation and Control Systems Summary. (43 page(s), 9/28/2005)
- ML052840049 - ESBWR Technical Specifications and Tier 1. (9 page(s), 9/28/2005)
- ML053180349 - 09/27-09/29/2005-Summary of Meeting with GE Regarding the ESBWR Design Certification Application. (20 page(s), 11/17/2005)