Home > NRC Library > ADAMS Public Documents
South Texas Project Units 1 and 2, Addition of Welded Attachments to Piping Systems from which Arbitrary Intermediate Breaks were Previously Eliminated.
Accession Number: ML051450432
Date Released: Friday, June 3, 2005
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML051450436 - South Texas Project, Units 1 and 2 - Addition of Welded Attachments to Piping Systems from which Arbitrary Intermediate Breaks were Previously Eliminated. (7 page(s), 11/18/2004)
- ML051450460 - Calculation RC5035-P-200 RO, "Evaluation of NFW Piping System Due to SGR (UNIT 1 LOOP B). (152 page(s), 7/21/1998)
- ML051450492 - Calculation RC5037-P-400 RO, Evaluation of NFW Piping System Due to SGR (UNIT I LOOP D). (132 page(s), 7/21/1998)
- ML051450607 - Calculation RC9585-P-906 RO, Evaluation of Generic IWA Calculation. (24 page(s), 3/13/1998)
- ML051450609 - Calculation RC5035-P-200, Rev 1, Evaluation of MFW Piping System Due to SGR (Unit 2 Loop B). (138 page(s), 7/19/2002)
- ML051450610 - Calculation RC5037-P-400, Rev 1, Evaluation of MFW Piping System Due to SGR (Unit 2 Loop D). (109 page(s), 7/19/2001)