Home > NRC Library > ADAMS Public Documents
Third partial response to Freedom of Information Act (FOIA) /Privacy Act (PA) Request. Records in App D available for public inspection, Apps E and F being released in entirety & records in App F being withheld in part.
Accession Number: ML993510030
Date Released: Tuesday, December 14, 1999
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML993500305 - Third partial response to Freedom of Information Act (FOIA) /Privacy Act (PA) Request. Records in App D available for public inspection, Apps E and F being released in entirety & records in App F being withheld in part. (6 page(s), 12/9/1999)
- ML993500312 - FOIA Request regarding large and small bore piping, and Stone & Webster Engineering Corporation. (62 page(s), 9/15/1999)
- ML993500314 - FORTHCOMING MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY ON PIPE STRESS ANALYSIS FOR SURRY POWER STATION (1 page(s), 5/8/1979)
- ML993500316 - FORTHCOMING MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY AND STONE AND WEBSTER ENGINEERING CORPORATION ON PIPE STRESS ANALYSIS FOR SURRY POWER STATION (2 page(s), 5/8/1979)
- ML993500319 - Response to letter regarding orders by NRC on 03/13/79 to shut down 5 nuclear power plants in eastern US because of questions about ability of piping systems to withstand earthquakes. (6 page(s), 5/17/1979)
- ML993500333 - Letter expressing concerns regarding potential cost impact of NRC's recent order requiring shutdown of Virginia Electric & Power Company's Surry Nuclear Station to insure that certain piping can withstand earthquake conditions. (3 page(s), 3/26/1979)
- ML993500337 - Washington Post Article Dated March 14, 1979 "5 Nuclear Power Plants Ordered Closed" (1 page(s), 3/14/1979)
- ML993500340 - SURRY 1 & 2 SER INPUT FOR SOIL-STRUCTURE INTERACTION (SEB: 1139) (1 page(s), 6/11/1979)
- ML993500344 - OVERVIEW OF THE SURRY SITE (1 page(s), 6/15/1979)
- ML993500381 - FORTHCOMING MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY AND EBASCO ON PIPE STRESS ANALYSIS FOR SURRY POWER STATION, UNIT 2 (1 page(s), 8/13/1979)
- ML993500400 - COMPARISON OF OLD AND NEW DESIGN CRITERIA FOR BEAVER VALLEY AND SURRY 1 & 2 (7 page(s), 8/28/1979)
- ML993500422 - SURRY POWER STATION, UNIT NO. 1 - RESOLUTION OF MARCH 13, 1979 SHOW CAUSE ORDER (TAC 14431) (1 page(s), 9/13/1979)
- ML993500430 - SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION, UNIT NO. 1 DOCKET NO. 50-280. (15 page(s), 8/22/1979)
- ML993500436 - OPERATING BASIS EARTHQUAKE REVIEW - RE ANALYSIS OF PIPING SYSTEMS OF SURRY POWER STATION UNITS 1 AND 2 (3 page(s), 10/4/1979)
- ML993500456 - OPERATING BASIS EARTHQUAKE REVIEW-REANALYSIS OF PIPING SYSTEMS OF SURRY POWER STATION UNITS 1 AND 2 (2 page(s), 10/23/1979)
- ML993510001 - OPERATING BASIS EARTHQUAKE REANALYSIS OF PIPING SYSTEMS, SURRY POWER STATION UNITS 1 AND 2 (TAC NOS. 11542, 11543) (2 page(s), 10/30/1979)
- ML993510003 - OPERATING BASIS EARTHQUAKE REANALYSIS OF PIPING SYSTEMS, SURRY POWER STATION UNITS 1 AND 2 (TAC NOS. 11542, 11543) (2 page(s), 10/30/1979)
- ML993510006 - Letter providing 120 day response re IEB 79-14 "Seismic Analyses for As-Built Safety-Related Piping Systems," Revision 1 dated 07/18/79, Supplement 1 dated 08/15/79 & Supplement 2 dated 09/07/79 for Surry Power Station Units 1 & 2. (2 page(s), 10/30/1979)
- ML993510009 - SURRY POWER STATION UNIT 2 I.E. BULLETIN NO. 79-14 (3 page(s), 12/31/1980)
- ML993510010 - Letter referring to March 18, 1980 letter serial number 195 requesting extension to May 31, 1980 for completion of IEB 79-14 analyses for Surry 1. (1 page(s), 5/29/1980)
- ML993510011 - Confirmation of Action, referring to RC Lewis telephone conversation on July 21, 1980 with JH Ferguson concerning the completion of IE Bulletin 79-14 actions and startup of Surry 2. (2 page(s), 7/24/1980)
- ML993510013 - Letter forwarding IEB-79-14 pages 1, 2 & 3 including revision 1 to page 2 of 3. (15 page(s), 7/27/1979)
- ML993510014 - Letter forwarding Supplement 2 to IE Bulletin 79-14. (3 page(s), 9/7/1979)
- ML993510016 - IEB-79-14 (1 page(s), 8/1/1979)
- ML993510018 - Partially deleted letter expressing objections regarding shutdown of five nuclear reactor powered generating stations - protest of order (2 page(s), 3/15/1979)
- ML993510020 - Partially deleted letter responding to letter regarding orders by NRC on March 13, 1979 to shutdown five nuclear power plants in eastern US because of questions about the ability of their piping systems to withstand earthquakes. (3 page(s), 5/9/1979)
- ML993510025 - Partially deleted letter discussing article in newspaper regarding earthquakes. (2 page(s), 3/14/1979)
- ML993510027 - Partially deleted letter responding to March 18 letter to the President regarding orders by NRC on March 13 to shutdown five nuclear power plants in eastern US because of questions about the ability of their piping systems to withstand earthquakes. (4 page(s), 6/6/1979)