Nine Mile Point, Unit 2, Submittal of Revision 25 to Updated Safety Analysis Report (USAR) and Reference Figures, 1 O CFR 50.59 Evaluation Summary Report, Technical Specifications Bases, Technical Requirements Manual Changes, and 10 CFR 54.37(b)
Accession Number: ML22292A107
Date Released: Thursday, May 18, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML22292A061 - Nine Mile Point, Unit 2, Submittal of Revision 25 to Updated Safety Analysis Report (USAR) and Reference Figures, 1 O CFR 50.59 Evaluation Summary Report, Technical Specifications Bases, Technical Requirements Manual Changes, and 10 CFR 54.37(b) (13 page(s), 10/5/2022)
- ML22292A070 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 1, Introduction And General Description Of The Plant (421 page(s), 10/5/2022)
- ML22292A082 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.1-1 thru 1.2-19 Sheet 2 (39 page(s), 10/5/2022)
- ML22292A065 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 1, Figures (23 page(s), 10/5/2022)
- ML22292A110 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2-33 Through End (23 page(s), 10/5/2022)
- ML22292A088 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Table of Contents (10/5/2022)
- ML22292A079 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Sections 2.1 Through 2.4 (171 page(s), 10/5/2022)
- ML22292A062 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering (305 page(s), 10/5/2022)
- ML22292A117 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Figures (200 page(s), 10/5/2022)
- ML22292A105 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-110 Through 2H-42. (199 page(s), 10/5/2022)
- ML22292A101 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Figures 2H.43 Through 2K-27F (146 page(s), 10/5/2022)
- ML22292A109 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Figures 2K.28A Through End (147 page(s), 10/5/2022)
- ML22292A086 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Hazardous Materials Data Collection (261 page(s), 10/5/2022)
- ML22292A103 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Tables 2B-8 Through 2B-38 (224 page(s), 10/5/2022)
- ML22292A098 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-35, Joint Distribution of Wing Direction and Speed (126 page(s), 10/5/2022)
- ML22292A116 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-38, Joint Distribution of Wind Direction and Speed Location 100 Ft (108 page(s), 10/5/2022)
- ML22292A073 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 02, Appendix 2B Table 2B-39 (108 page(s), 10/5/2022)
- ML22292A085 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B Table 2B-40 thru 2B-55 (29 page(s), 10/5/2022)
- ML22292A100 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Appendices 2C Through 2I (167 page(s), 10/5/2022)
- ML22292A069 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Appendices 2J Through 2Q (10/5/2022)
- ML22292A087 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Table of Contents (38 page(s), 10/5/2022)
- ML22292A083 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.1 Through 3.5 (181 page(s), 10/5/2022)
- ML22292A097 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.6A Through 3.8 (278 page(s), 10/5/2022)
- ML22292A072 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.9A thru 3.11 (297 page(s), 10/5/2022)
- ML22292A067 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A thru 3E (252 page(s), 10/5/2022)
- ML22292A108 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3 (281 page(s), 10/5/2022)
- ML22292A090 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 4, Table Of Contents (113 page(s), 10/5/2022)
- ML22292A081 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 Through 4.6-9 (24 page(s), 10/5/2022)
- ML22292A091 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 5, Table of Contents (188 page(s), 10/5/2022)
- ML22292A089 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 5, Figures (74 page(s), 10/5/2022)
- ML22292A115 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Table of Contents (32 page(s), 10/5/2022)
- ML22292A111 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.1 Through 6.2 (254 page(s), 10/5/2022)
- ML22292A064 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.3 Through 6.6 (74 page(s), 10/5/2022)
- ML22292A078 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Appendices 6A Through 6C (238 page(s), 10/5/2022)
- ML22292A071 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6D, Design Assessment Report For Hydrodynamic Loads - Non-Proprietary (1 page(s), 10/5/2022)
- ML22292A102 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6D, Figures 6.2.1 Through 6C-1 (432 page(s), 10/5/2022)
- ML22292A094 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Table of Contents (14 page(s), 10/5/2022)
- ML22292A112 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Thru 7.3 (119 page(s), 10/5/2022)
- ML22292A104 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Thru 7.7 (139 page(s), 10/5/2022)
- ML22292A068 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Appendices 7A Thru 7B (57 page(s), 10/5/2022)
- ML22292A063 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Figures (128 page(s), 10/5/2022)
- ML22292A074 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Table of Contents (10 page(s), 10/5/2022)
- ML22292A076 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Section 8.1 Thru 8.2 (41 page(s), 10/5/2022)
- ML22292A095 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3 thru Appendix 8A (134 page(s), 10/5/2022)
- ML22292A077 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Figures (98 page(s), 10/5/2022)
- ML22292A096 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Table of Contents (29 page(s), 10/5/2022)
- ML22292A113 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (184 page(s), 10/5/2022)
- ML22292A075 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Sections 9.4 thru 9.5 (264 page(s), 10/5/2022)
- ML22292A066 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Figures (278 page(s), 10/5/2022)
- ML22292A099 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.4-2e thru end (300 page(s), 10/5/2022)
- ML22292A114 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Degree of Compliance with Branch Technical Position CMEB 9.5-1, Rev. 2 dated July 1981 (190 page(s), 10/5/2022)
- ML22292A106 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Appendices 9B thru 9C (186 page(s), 10/5/2022)
- ML22292A084 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (80 page(s), 10/5/2022)
- ML22292A093 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 10, Figures (161 page(s), 10/5/2022)
- ML22292A080 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (143 page(s), 10/5/2022)
- ML22292A092 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 11, Figures (41 page(s), 10/5/2022)
- ML22292A134 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (169 page(s), 10/5/2022)
- ML22292A137 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 12, Figures (75 page(s), 10/5/2022)
- ML22292A132 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (18 page(s), 10/5/2022)
- ML22292A136 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.5-1, "At the Controls" Main Control Room El. 306'-0" (1 page(s), 10/5/2022)
- ML22292A129 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 14, Table of Contents (15 page(s), 10/5/2022)
- ML22292A135 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 14, Sections 14.1 thru 14.4 (362 page(s), 10/5/2022)
- ML22292A127 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 14, Figures (12 page(s), 10/5/2022)
- ML22292A126 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 15, Table of Contents (27 page(s), 10/5/2022)
- ML22292A120 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (266 page(s), 10/5/2022)
- ML22292A118 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 15, Figures (130 page(s), 10/5/2022)
- ML22292A125 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 15, Appendices (197 page(s), 10/5/2022)
- ML22292A133 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications (2 page(s), 10/5/2022)
- ML22292A122 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 17, Quality Assuarance (72 page(s), 10/5/2022)
- ML22292A130 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 17, Figures (2 page(s), 10/5/2022)
- ML22292A139 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 18, Human Factor Engineering/Safety Parameter Display System (35 page(s), 10/5/2022)
- ML22292A138 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Chapter 18, Figures (9 page(s), 10/5/2022)
- ML22292A128 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Appendix A, Reload Analysis (63 page(s), 10/5/2022)
- ML22292A123 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Appendix A, Figure A.0-1, The content of Figure A.0-1 is historical and has been deleted. (1 page(s), 10/5/2022)
- ML22292A121 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Appendix B (2 page(s), 10/5/2022)
- ML22292A124 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Appendix C, Licensee Renewal Supplement - Aging Management Programs and Time-Limited Aging Analyses (46 page(s), 10/5/2022)
- ML22292A131 - Nine Mile Point Nuclear Power Station, Unit 2, Revision 25 to Updated Final Safety Analysis Report, Technical Specification Bases, Rev. 69 (753 page(s), 10/5/2022)
- ML22292A119 - Nine Mile Point Nuclear Power Station, Unit 2, Rev. 48 to Technical Requirements Manual (217 page(s), 10/5/2022)