Limerick Generating Station, Units 1 & 2 - Submittal of Rev. 20 to Updated Final Safety Analysis Report
Accession Number: ML21251A560
Date Released: Wednesday, September 8, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21138A801 - Limerick Generating Station, Units 1 & 2 - Submittal of Rev. 20 to Updated Final Safety Analysis Report. (3 page(s), 4/29/2021)
- ML21133A067 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Table of Contents (10 page(s), 4/29/2021)
- ML21133A080 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.1 though 1.6 (68 page(s), 4/29/2021)
- ML21133A051 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.7 through 1.12 (139 page(s), 4/29/2021)
- ML21133A054 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 1, Section 1.13, TMI-2 Related Requirements for New Operating Licenses (107 page(s), 4/29/2021)
- ML21133A062 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 1, Figures (10 page(s), 4/29/2021)
- ML21133A079 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Table of Contents (18 page(s), 4/29/2021)
- ML21133A078 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 2, Sections 2.1 through 2.3 (175 page(s), 4/29/2021)
- ML21133A077 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Hydrologic Engineering (210 page(s), 4/29/2021)
- ML21133A063 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 2, Figures. (152 page(s), 4/29/2021)
- ML21133A071 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, equipment, and Systems, Table of Contents (32 page(s), 4/29/2021)
- ML21133A055 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment And Systems. (123 page(s), 4/29/2021)
- ML21133A058 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.4, Water Level (Flood) Design (200 page(s), 4/29/2021)
- ML21133A068 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category I Structure (130 page(s), 4/29/2021)
- ML21133A052 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9 (270 page(s), 4/29/2021)
- ML21133A061 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Sections 10 thru 12. (28 page(s), 4/29/2021)
- ML21133A076 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.3 through 3.7, Figures. (165 page(s), 4/29/2021)
- ML21133A046 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Figures (166 page(s), 4/29/2021)
- ML21133A060 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Design Assessment Report, Table of Contents. (14 page(s), 4/29/2021)
- ML21133A072 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Design Assessment Report (173 page(s), 4/29/2021)
- ML21133A069 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Figures (162 page(s), 4/29/2021)
- ML21133A075 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Figures 3A-160 through 3A-319 (160 page(s), 4/29/2021)
- ML21133A065 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Figures 3A-320 through 3A-462. (152 page(s), 4/29/2021)
- ML21133A064 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 4, Reactor, Table of Contents. (6 page(s), 4/29/2021)
- ML21133A057 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 4, Sections 4.1 through 4.6 (80 page(s), 4/29/2021)
- ML21133A073 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 4, Figures. (17 page(s), 4/29/2021)
- ML21133A059 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Table of Contents. (9 page(s), 4/29/2021)
- ML21133A070 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 through 5.4 (200 page(s), 4/29/2021)
- ML21133A066 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Figures. (40 page(s), 4/29/2021)
- ML21133A074 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Table of Contents. (13 page(s), 4/29/2021)
- ML21133A048 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.0 through 6.2. (202 page(s), 4/29/2021)
- ML21133A045 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.3 through 6.7. (115 page(s), 4/29/2021)
- ML21133A056 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 6, Figures (88 page(s), 4/29/2021)
- ML21133A049 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Appendix 6A, Subcompartment Differential Pressure Considerations, Table of Contents (3 page(s), 4/29/2021)
- ML21133A053 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6A, Subcompartment Differential Pressure Considerations. (17 page(s), 4/29/2021)
- ML21133A047 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6A, Figures. (21 page(s), 4/29/2021)
- ML21133A084 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems, Table of Contents (23 page(s), 4/29/2021)
- ML21133A087 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 through 7.2. (151 page(s), 4/29/2021)
- ML21133A086 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Section 7.3, Engineered Safety Feature Systems (251 page(s), 4/29/2021)
- ML21133A085 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 through 7.5. (131 page(s), 4/29/2021)
- ML21133A082 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6., All Other Instrumentation Systems Required For Safety (124 page(s), 4/29/2021)
- ML21133A091 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Section 7.7, Control Systems Not Required For Safety (142 page(s), 4/29/2021)
- ML21133A088 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Figures. (67 page(s), 4/29/2021)
- ML21133A081 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Table of Contents (6 page(s), 4/29/2021)
- ML21133A090 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 8, Sections 1 thru 3 (98 page(s), 4/29/2021)
- ML21133A089 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3, Tables (66 page(s), 4/29/2021)
- ML21133A083 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 8, Figures (17 page(s), 4/29/2021)
- ML21133A096 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Table of Contents (19 page(s), 4/29/2021)
- ML21133A098 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Sections 1 thru 2 (219 page(s), 4/29/2021)
- ML21133A102 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Sections 3 thru 5. (230 page(s), 4/29/2021)
- ML21133A111 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 10, Steam And Powered Conversation System, Table of Contents. (5 page(s), 4/29/2021)
- ML21133A113 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 10, Sections 10.1 through 10.4. (67 page(s), 4/29/2021)
- ML21133A110 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 10, Figures (15 page(s), 4/29/2021)
- ML21133A112 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Table of Contents. (8 page(s), 4/29/2021)
- ML21133A108 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 11, Sections 11.1 through 11.5 (146 page(s), 4/29/2021)
- ML21133A109 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 11, Figures. (11 page(s), 4/29/2021)
- ML21133A117 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 12, Figures (11 page(s), 4/29/2021)
- ML21133A121 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Table of Contents. (5 page(s), 4/29/2021)
- ML21133A114 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 13, Sections 1 thru 6, Conduct of Operations. (43 page(s), 4/29/2021)
- ML21133A119 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 13, Figures (4 page(s), 4/29/2021)
- ML21133A123 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Table of Contents (4 page(s), 4/29/2021)
- ML21133A124 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Sections 1 thru 2 (110 page(s), 4/29/2021)
- ML21133A125 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 14, Figures. (14 page(s), 4/29/2021)
- ML21133A131 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, 15, Accident Analyses, Table of Contents. (25 page(s), 4/29/2021)
- ML21133A134 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 15, Sections 15.0 through 15.5. (138 page(s), 4/29/2021)
- ML21133A136 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Reload Evaluations, Table of Contents. (4 page(s), 4/29/2021)
- ML21133A135 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Introduction (5 page(s), 4/29/2021)
- ML21133A133 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications, Table of Contents. (1 page(s), 4/29/2021)
- ML21133A132 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 16, Sections 16.1 and 16.2 (2 page(s), 4/29/2021)
- ML21133A142 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance, Table of Contents. (1 page(s), 4/29/2021)
- ML21133A143 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (1 page(s), 4/29/2021)
- ML21133A141 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Appendix A - Updated Final Safety Analysis Report Supplement (101 page(s), 4/29/2021)
- ML21252A522 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Fire Protection Evaluation Report. (Redacted) (313 page(s), 4/29/2021)
- ML21252A572 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A-1, Tables (Redacted) (151 page(s), 4/29/2021)
- ML21252A520 - Limerick Generating Station Units 1 & 2 - Revision 20 Updated Final Safety Analysis Report, Chapter 9, Figures (Redacted) (75 page(s), 4/29/2021)
- ML21252A742 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Table of Contents. (Redacted) (9 page(s), 4/29/2021)
- ML21252A741 - Limerick Generating Station, Units 1 & 2 - Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Figures. (Redacted) (49 page(s), 4/29/2021)
- ML21253A055 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Sections 1 thru 2 (Redacted) (174 page(s), 4/29/2021)
- ML21253A062 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 15, Decrease in Reactor Coolant Inventory, Sections 6 thru 12 (Redacted) (176 page(s), 4/29/2021)
- ML21253A056 - Limerick Generating Station, Units 1 & 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 12, Sections 3 thru 5. (Redacted) (81 page(s), 4/29/2021)