Home > NRC Library > ADAMS Public Documents
Vogtle Electric Generating Plant Units 3 and 4, Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal
Accession Number: ML21179A130
Date Released: Tuesday, July 13, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21179A098 - Vogtle Electric Generating Plant Units 3 and 4, Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal (386 page(s), 6/15/2021)
- ML21179A094 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 18 to Technical Requirements Manual, List of Effective Sections (60 page(s), 6/15/2021)
- ML21179A095 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 68 to Technical Specifications Bases, List of Effective Sections (647 page(s), 6/15/2021)
- ML21179A097 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 9 to Tier 1 (567 page(s), 6/15/2021)
- ML21179A110 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant (467 page(s), 6/15/2021)
- ML21179A107 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2 thru 2.4 (445 page(s), 6/15/2021)
- ML21179A104 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.4A, Observation Well Installation and Development Report (229 page(s), 6/15/2021)
- ML21179A105 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.4B, Groundwater Model Development & Analysis (141 page(s), 6/15/2021)
- ML21179A115 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering, (Part 1 of 3) (311 page(s), 6/15/2021)
- ML21179A114 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering, (Part 2 of 3) (13 page(s), 6/15/2021)
- ML21179A116 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering, (Part 3 of 3) (150 page(s), 6/15/2021)
- ML21179A117 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.5A thru 2.5E (97 page(s), 6/15/2021)
- ML21179A124 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.1 thru 3.7 (359 page(s), 6/15/2021)
- ML21179A119 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category I Structures (196 page(s), 6/15/2021)
- ML21179A118 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9, Mechanical Systems and Components (358 page(s), 6/15/2021)
- ML21179A125 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Nuclear Island Seismic Analyses (110 page(s), 6/15/2021)
- ML21179A122 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3H, Auxiliary and Shield Building Critical Sections (136 page(s), 6/15/2021)
- ML21179A126 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 4, Reactor (196 page(s), 6/15/2021)
- ML21179A123 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System And Connected Systems (200 page(s), 6/15/2021)
- ML21179A121 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (289 page(s), 6/15/2021)
- ML21179A096 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation And Controls (229 page(s), 6/15/2021)
- ML21179A099 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (93 page(s), 6/15/2021)
- ML21179A093 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (595 page(s), 6/15/2021)
- ML21179A113 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 10, Steam And Power Conversion (139 page(s), 6/15/2021)
- ML21179A109 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (182 page(s), 6/15/2021)
- ML21179A103 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (212 page(s), 6/15/2021)
- ML21179A111 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operation (73 page(s), 6/15/2021)
- ML21179A101 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (185 page(s), 6/15/2021)
- ML21179A102 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (667 page(s), 6/15/2021)
- ML21179A100 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications (8 page(s), 6/15/2021)
- ML21179A108 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (36 page(s), 6/15/2021)
- ML21179A106 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering (84 page(s), 6/15/2021)
- ML21179A112 - Vogtle Electric Generating Plant, Units 3 & 4, Revision 10 to Updated Final Safety Analysis Report, Chapter 19, Probabilistic Risk Assessment (84 page(s), 6/15/2021)