Forwards revs to Comanche Peak Steam Electric Station manuals.
Accession Number: ML20210F162
Date Released: Tuesday, August 11, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20210F157 - Forwards revs to Comanche Peak Steam Electric Station manuals. (8 page(s), 1/26/1987)
- ML20210H070 - Change Notice 1 to Rev 1 to Instruction QI-039, "Reinsp of HVAC Ducts & Plenums." (6 page(s), 11/25/1986)
- ML20210H067 - Change Notice 1 to Rev 1 to Instruction QI-071, "Reinsp of Lighting Cable/I-E-LITG." (2 page(s), 11/7/1986)
- ML20210H239 - Change Notice 2 to Rev 2 to Procedure CPP-011, "Evaluations of Adverse Trend Analyses,Const Deficiencies & QA/QC Program Deficiencies." (2 page(s), 10/3/1986)
- ML20210H393 - Rev 3 to Procedure CPP-014, "For Collective Evaluation of Const QA/QC Program & of Quality of Const." (14 page(s), 10/3/1986)
- ML20210H301 - Change Notice 1 to Rev 2 to Procedure CPP-012, "QA/QC Interface W/Constructor & TUGCO." (2 page(s), 10/3/1986)
- ML20210H457 - Rev 2 to QA program for design adequacy program. (17 page(s), 11/12/1986)
- ML20210H754 - Rev 1 to Procedure DAP-DI-M002, "Mechanical Administrative Review Instruction." (24 page(s), 1/6/1987)
- ML20210G087 - Change Notice 2 to Rev 2 to Procedure QI-051, "Reinsp of Pipe Whip Restraints." (2 page(s), 11/5/1986)
- ML20210G645 - Change Notice 2 to Rev 1 to Instruction QI-053, "Reinsp of Category I Conduit Supports/I-S-Cosp." (2 page(s), 10/31/1986)
- ML20210G690 - Change Notice 1 to Rev 2 to Instruction QI-055, "Reinsp of Instrument Pipe/Tube Supports/I-S-Insp." (2 page(s), 10/30/1986)
- ML20210G445 - Change Notice 2 to Rev 1 to Instruction QI-042, "Documentation Review of Field Fabricated Tanks." (2 page(s), 10/29/1986)
- ML20210H523 - Change Notice 1 to Rev 2 to Procedure CPP-020, "Out-of-Scope Observations." (2 page(s), 10/3/1986)
- ML20210H636 - Addendum 1 to Rev 0 to Procedure DAP-DI-M-001, "Mechanical Discipline Walkdown Instruction." (1 page(s), 12/23/1986)
- ML20210G621 - Change Notice 2 to Rev 1 to Instruction QI-052, "Documentation Review of Pipe Whip Restraints." (3 page(s), 10/24/1986)
- ML20210G315 - Change Notice 1 to Rev 3 to Instruction QI-029, "Reinsp of Large Bore Pipes Supports - Non-Rigid." (3 page(s), 11/10/1986)
- ML20210H822 - Rev 2 to Procedure DAP-7, "Trending & Generic Implications Evaluations." (82 page(s), 11/7/1986)
- ML20210G892 - Rev 4 to Instruction QI-059, "Reinsp of Mechanical Equipment Installation." (26 page(s), 11/4/1986)
- ML20210G583 - Change Notice 2 to Rev 2 to Instruction QI-047, "Reinsp of Small Bore Pipe Welds/Matl." (2 page(s), 12/9/1986)
- ML20210G139 - Change Notice 1 to Rev 4 to Instruction Q-019, "Reinsp of Small Bore Pipe Supports." (2 page(s), 11/6/1986)
- ML20210G203 - Change Notice 4 to Rev 2 to Instruction QI-021, "Reinsp of Piping Sys Bolted Joint/Matl." (4 page(s), 11/5/1986)
- ML20210H354 - Notice of Cancellation to Rev 1 to Procedure CPP-013, "Title." (1 page(s), 10/3/1986)
- ML20210F328 - Notice of cancellation to Rev 3 to Instruction QI-009, "Document Review of Conduit/R-E-CDUT." (2 page(s), 12/4/1986)
- ML20210K794 - Change Notice 2 to Rev 2 to Procedure CPP-012, "QA/QC Interface W/Constructor & Texas Util Generating Co." (2 page(s), 11/10/1986)
- ML20210G875 - Rev 3 to Instruction QI-058, "Reinsp of Pipe Supports TRT Issues - 42 Pipe Supports." (94 page(s), 10/10/1986)
- ML20210H798 - Rev 5 to Procedure DAP-2, "Documentation & Tracking of Issues & Discrepancies." (70 page(s), 11/7/1986)
- ML20210H484 - Change Notice 1 to Rev 2 to Procedure CPP-017, "Preparation of QA/QC Program Deviation Repts." (3 page(s), 10/23/1986)
- ML20210H787 - Rev 0 to Procedure DAP-DI-EIC-003, "Administrative Review of EIC Design Checklists." (19 page(s), 11/25/1986)
- ML20210H584 - Rev 0 to Procedure DI-C/S-003, "Administrative Review of DAP Civil/Structural Checklists." (22 page(s), 11/10/1986)
- ML20210H662 - Change Notice 1 to Rev 1 to Procedure CPP-027, "Reinsp/ Documentation Review of Purchased Safety-Related Matl & Equipment." (6 page(s), 10/23/1986)
- ML20210F268 - Change Notice 1 to Rev 3 to Instruction QI-005, "Evaluation of Inspector Performance." (5 page(s), 10/16/1986)
- ML20210G255 - Change Notice 1 to Rev 3 to Instruction QI-027, "Reinsp of Large Bore Pipe Supports - Rigid." (2 page(s), 11/6/1986)
- ML20210G983 - Rev 2 to Instruction QI-069, "Documentation Review of Epoxy Grout." (5 page(s), 10/8/1986)
- ML20210H182 - Change Notice 2 to Rev 7 to Procedure CPP-010, "Preparation of Deviation Repts." (2 page(s), 10/3/1986)
- ML20210G960 - Change Notice 4 to Rev 1 to Instruction QI-066, "Reinsp of Equipment Supports." (2 page(s), 11/10/1986)
- ML20210F463 - Change Notice 2 to Rev 1 to Instruction QI-012, "Reinsp of Instrumentation Equipment/I-E-ININ." (2 page(s), 9/26/1986)
- ML20210H703 - Rev 0 to Procedure DAP-DI-M001, "Mechanical Administrative Review Instruction." (19 page(s), 10/31/1986)
- ML20210G712 - Rev 7 to Instruction QI-057, "Documentation Review of Fill & Backfill Placement." (21 page(s), 11/3/1986)
- ML20210G544 - Change Notice 1 to Rev 3 to Instruction QI-045, "Reinsp Procedures for Structural Steel." (2 page(s), 10/24/1986)
- ML20210H432 - Change Notice 1 to Rev 3 to Procedure CPP-016, "Safety Significance Evaluations of Deviation Repts." (2 page(s), 10/3/1986)
- ML20210H604 - Rev 1 to Procedure CPP-027, "Reinsp/Documentation Review of Purchased Safety-Related Matl & Equipment." (17 page(s), 10/16/1986)
- ML20210G939 - Change Notice 3 to Rev 1 to Instruction QI-066, "Reinsp of Equipment Supports." (2 page(s), 10/3/1986)
- ML20210G361 - Rev 2 to Instruction QI-037, "Reinsp of Pipe Supports:TRT Issues-Pipe Supports in Room 77N,Safeguards Bldg,Unit 1." (15 page(s), 10/10/1986)
- ML20210H012 - Change Notice 2 to Rev 2 to Instruction QI-070, "Reinsp of Tubing Welds/Matl." (3 page(s), 9/26/1986)
- ML20210H775 - Rev 0 to Procedure DI-M-003, "Technical Adequacy Review of NCRs,Rev 0." (10 page(s), 1/7/1987)