Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for documents re 851224 Insp Repts 50-445/85-13 & 50-446/85-09.App B lists documents available in PDR.
Accession Number: ML20199D912
Date Released: Friday, July 31, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20199D907 - Partial response to FOIA request for documents re 851224 Insp Repts 50-445/85-13 & 50-446/85-09.App B lists documents available in PDR. (29 page(s), 6/9/1986)
- ML20199E586 - Rev 2 to population description, "Field Fabricated Tanks." (2 page(s), 8/17/1985)
- ML20199E114 - Draft B,Rev 0 to "Policy on Testing & Insp Personnel Used in Third Party Verification Activities." (22 page(s), 2/28/1985)
- ML20199E598 - Change Notice 001 to Rev 0 to Instruction QI-041, "Reinsp of Field Fabricated Tanks." (11 page(s), 9/24/1985)
- ML20199E110 - Draft B,Rev 0 to "Guide on Assembly of Project Central & Working Files." (8 page(s), 2/28/1985)
- ML20199D983 - Rev 2 to Procedure QI-QP-11.3-16, "Class 1E Cable Terminations." (9 page(s), 8/21/1979)
- ML20199E554 - Population description, "Concrete Placement." (3 page(s), 8/5/1985)
- ML20199E361 - Rev 0 to Instruction QI-026, "Reinspection of Small Bore Piping Configuration." (22 page(s), 8/16/1985)
- ML20199E358 - Rev 0 to Procedure CPP-005, "Establishing Populations." (13 page(s), 8/13/1985)
- ML20199E268 - Rev 0 to population description, "Large Bore Pipe-Welds/ Matl." (3 page(s), 6/26/1985)
- ML20199E394 - Voided Rev 0 to Instruction QI-021, "Reinspection of Piping Sys Bolted Joint/Matls." (25 page(s), 8/27/1985)
- ML20199E389 - Rev 0 to Instruction QI-031, "Reinspection of Containment Liner & Tank Stainless Steel Liner." (7 page(s), 8/21/1985)
- ML20199E053 - Rev 25 to Procedure QI-QP-11.3-28, "Class 1E Cable Terminations." (89 page(s), 8/2/1985)
- ML20199E560 - Rev 0 to population description, "Mechanism Equipment Installation." Related info encl. (35 page(s), 8/9/1985)
- ML20199D928 - Rev 2 to Procedure QI-QP-11.3-25.4, "Verify Terminations & Splices." (4 page(s), 1/30/1981)
- ML20199E076 - Draft C,Rev 0 to "Guide for Sampling Plans Random Samples." (15 page(s), 2/28/1985)
- ML20199E657 - Population items list, "Fuel Pool Liner." (1 page(s), 9/27/1985)
- ML20199G709 - Population items list, "Large Bore Pipe Welds/Matl." Related info encl. (129 page(s), 9/25/1985)
- ML20199E435 - Rev 4 to Instruction QI-013, "Documentation Review for Instrumentation Equipment/R-E-ININ." Related documentation encl. (110 page(s), 9/24/1985)
- ML20199E295 - Population description, "Liners." (2 page(s), 8/8/1985)
- ML20199E130 - Rev 1 to Comanche Peak Response Team Action Plan,Item V.c, "Design Consideration for Piping Sys Between Seismic Category I & Non-Seismic Category I Bldg." (12 page(s), 6/26/1985)
- ML20199E142 - Rev 1 to Comanche Peak Response Team Action Plan,Item V.e, "Installation of Main Steam Pipes." (9 page(s), 6/26/1985)
- ML20199E632 - Population items list, "Concrete Placement." (9 page(s), 9/6/1985)
- ML20199E321 - Rev 0 to Instruction QI-018, "Reinspection of Previously Disassembled Valves." (12 page(s), 7/26/1985)
- ML20199E412 - Rev 2 to Instruction QI-008, "Reinspection of Conduit/IE Conduit." (18 page(s), 9/9/1985)
- ML20199E626 - Rev 0 to population items list, "Piping Sys Bolted Joints/ Matl." Related info encl. (26 page(s), 8/21/1985)
- ML20199E232 - Rev 0 to population description, "Small Bore Piping & Instrument Tubing/Piping Welds/Matl." (3 page(s), 6/26/1985)
- ML20199E644 - Rev 0 to population items list, "Mechanical Equipment Installation." Related info encl. (21 page(s), 9/5/1985)
- ML20199E405 - Rev 1 to Procedure CPP-019, "Cluster Sampling for Issue Specific Action Plan VII.b.1." (5 page(s), 8/28/1985)
- ML20199E151 - Rev 9 to Prerequisite Test Instruction XCP-EE-8, "Control Circuit Functional Testing." (9 page(s), 9/5/1985)
- ML20199E033 - Rev 1 to Procedure CP-EP-16.0, "Procedure for Resolving Insp Discrepancies at Receiving." (26 page(s), 1/18/1982)
- ML20199E651 - Rev 1 to population description, "Large Bore Pipe Supports - Nonrigid." Related info encl. (20 page(s), 7/23/1985)
- ML20199E048 - Rev 7 to Procedure QI-QP-11.3-28, "Instruction for 1E Electrical Equipment Installation." (134 page(s), 1/23/1985)
- ML20199E201 - Rev 8 to Procedure STA-608, "Control of Measuring & Test Equipment." (23 page(s), 8/15/1985)
- ML20199D994 - Rev 1 to Procedure QI-QP-11.3-28.9, "Verify Terminations." (3 page(s), 4/11/1980)
- ML20199E538 - Rev 1 to population description, "Large Bore Pipe Supports - Rigid." (6 page(s), 7/23/1985)
- ML20199E163 - Rev 2 to Prerequisite Test Instruction XCP-EE-20, "Continuity & Termination Verification." Related documentation encl. (90 page(s), 9/2/1985)
- ML20199E430 - Rev 0 to Procedure QI-043, "Reinspection of Concrete Placement." (11 page(s), 9/13/1985)
- ML20199E282 - Rev 0 to population description, "Large Bore Piping Configuration." (4 page(s), 6/26/1985)
- ML20199E640 - Population items list, "Small Bore Piping & Instrument Tubing/Piping Welds/Matl." (15 page(s), 9/13/1985)
- ML20199E614 - Rev 0 to population items list, "Field Fabricated Tanks." Related info encl. (28 page(s), 7/29/1985)
- ML20199E383 - Rev 1 to Instruction QI-025, "Reinspection of Large Bore Piping Configuration." (19 page(s), 8/16/1985)
- ML20199E196 - Rev 3 to Procedure EDA-105, "Engineering Dept Surveillance Test Procedures." (13 page(s), 5/20/1985)
- ML20199E216 - Engineering Evaluation Rept EER-136, "AMP PIDG PVF2 Terminals Tested to MIL-T-7928G Vibration Sequence." Related documentation encl. (160 page(s), 4/1/1985)
- ML20199E249 - Rev 0 to population description, "Small Bore Piping Configuration." (4 page(s), 6/25/1985)
- ML20199E529 - Rev 1 to population items list, "Large Bore Pipe Supports - Rigid." Related info encl. (11 page(s), 7/30/1985)
- ML20199E175 - Rev 0 to Procedure DAP-15, "Training & Qualifications." (14 page(s), 10/4/1985)
- ML20199E573 - Population items list, "Liners." (7 page(s), 8/14/1985)
- ML20199E012 - Rev 0 to Procedure QI-QP-11.3-25.6D, "Terminations & Splices Suppl." (4 page(s), 3/12/1981)
- ML20199E331 - Rev 0 to Instruction QI-014, "Reinspection of Cables/IE Cable." (22 page(s), 7/18/1985)
- ML20199E102 - Draft B,Rev 0 to "Guide on Evaluation of Safety Significance." (5 page(s), 2/28/1985)
- ML20199E349 - Rev 1 to Instruction QI-008, "Reinspection of Conduit/IE Conduit." (20 page(s), 7/25/1985)
- ML20199E303 - Rev 1 to population description, "Large Bore Pipe Welds/ Matl." (6 page(s), 9/26/1985)
- ML20199E669 - Population description, "Fuel Pool Liners." Related info encl. (11 page(s), 7/22/1985)
- ML20199D956 - Rev 1 to Procedure QI-QP-11.3-10, "Documenting Electrical Insp." (5 page(s), 11/21/1978)
- ML20199E006 - Rev 8 to Procedure QI-QP-11.3-28.7, "Verify Proper Lug or Connector/Connection Type,Size & Final Crimps." (4 page(s), 8/13/1982)
- ML20199E681 - Rev 0 to population items list, "Small Bore Piping Configuration." (5 page(s), 8/14/1985)
- ML20199E240 - Population description, "Piping Sys Bolted Joints/Matls." (3 page(s), 6/26/1985)
- ML20199E187 - Rev 4 to Procedure STA-702, "Surveillance Test Program." (14 page(s), 4/8/1985)
- ML20199E181 - Rev 0 to Procedure EDA-109, "Surveillance Tracking Program." (9 page(s), 1/14/1985)
- ML20199E325 - Rev 1 to Procedure CPP-006, "Sample Selection." (10 page(s), 8/9/1985)
- ML20199E027 - Rev 7 to Procedure QI-QP-11.3-26A, "Insp of Electrical Cable Installation." (44 page(s), 8/1/1985)