Partial response to FOIA request for documents.Forwards App B documents.App A & B documents available in PDR.
Accession Number: ML20155E140
Date Released: Wednesday, June 17, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20155E133 - Partial response to FOIA request for documents.Forwards App B documents.App A & B documents available in PDR. (7 page(s), 6/6/1988)
- ML20155G308 - Advises of preliminary review of util 720922 application to const nuclear power plant.Initial meeting to discuss review schedule will be planned for 720927 & second meeting on 721006. (2 page(s), 9/21/1972)
- ML20155F516 - Forwards revised request for addl info re Mark III containment suppression pool dynamic loads.Transmittal of encl to applicant requested. (4 page(s), 6/11/1975)
- ML20155E794 - Advises that util response to 731002 request for addl info & statement of regulatory requirements re design of containment will be submitted by 731112. (3 page(s), 10/9/1973)
- ML20155E986 - Draft safety evaluation detailing items requiring resolution expected to occur prior to issuance of const permit. (36 page(s), 12/19/1973)
- ML20155F191 - Summary of 740430 & 0502 meetings w/util in Bethesda,MD re applicant proposed rev to combustible gas control sys design. (5 page(s), 5/14/1974)
- ML20155F332 - Discusses 750527 meeting re discussion w/staff that loads being used by util not adequately supported by test data & possibly questionable design practices being used to factor load into design. (2 page(s), 5/29/1975)
- ML20155F203 - Summary of 750116 meeting w/util in Bethesda,MD re deferred & new issues involving plant project that will require applicant to provide addl info during post-const permit period.Attendance list encl. (5 page(s), 1/21/1975)
- ML20155E753 - Forwards request for addl info re review of info submitted on PSAR up to & including Amend 11. (11 page(s), 9/26/1973)
- ML20155F560 - Informs that based on review,pool dynamic loads specified for plant found to be acceptable provided util adopts listed positions. (4 page(s), 10/22/1975)
- ML20155F279 - Forwards response to concerns re suppression pool dynamic loads.Response divided into three parts due to organizational div of responsibility. (2 page(s), 4/25/1975)
- ML20155E227 - Notification of 721208 meeting w/util in Bethesda,MD to discuss steps being taken by GE & Bechtel to modify Mark III containment design for plant to meet Safety Guide 7 combustible gas control limits. (3 page(s), 12/6/1972)
- ML20155E565 - Notification of 730810 meeting w/util in Bethesda,MD to discuss containment sys matters re util application, specifically,isolation valve arrangements,subcompartment pressure analysis,vent clearing model & util responses. (1 page(s), 8/8/1973)
- ML20155E557 - Notification of 730719 meeting w/util in Bethesda,MD to discuss technical matters principally re reactor sys, containment sys & accident analysis. (1 page(s), 7/17/1973)
- ML20155E367 - Forwards Accident Analysis Branch initial questions, including questions re site,engineered safeguards for iodine removal & DBA consequences on plant PSAR.Major revs to calculational models anticipated. (10 page(s), 2/3/1973)
- ML20155E182 - Forwards review concluding that util approach re containment sys of proposed application unacceptable.Addl info re subj requested. (4 page(s), 10/11/1972)
- ML20155E354 - Lists deficiencies found in info to be provided in Amend 2 to PSAR.Based on listed deficiencies,addl info requested to be able to perform meaningful review.Info requested by 730301. (2 page(s), 1/30/1973)
- ML20155E473 - Forwards request for addl info re listed items concerning util application for permits to const plant.Response requested by 730622.Requests info within 7 days after receipt of ltr of confirmation of above schedule. (17 page(s), 5/12/1973)
- ML20155E405 - Summary of 730223 meeting w/util in Bethesda,MD re fission product transport modeling for containment,following design basis LOCA.Meeting attendees encl. (5 page(s), 3/13/1973)
- ML20155F176 - Summary of ACRS 740307 meeting to review util application re listed items.Transcript of proceedings available. (2 page(s), 4/2/1974)
- ML20155F302 - Summary of 750423 meeting w/util in Bethesda,MD re util proposed response to NRC 750303 ltr requesting info on design basis loading for containment structures per mod from design in PSAR. (3 page(s), 5/1/1975)
- ML20155F053 - Summary of 740116 meeting w/util in San Jose,CA re staff review of proposed containment design.Meeting agenda encl. (4 page(s), 3/29/1974)
- ML20155F001 - Forwards responses to inquiries for use by subcommittee prior to 740117-18 meeting.Responses will form basis for further discussions w/staff. (9 page(s), 1/12/1974)
- ML20155E447 - Responds to 720426 ltr suggesting that util amend application for plant by reducing thermal power output of reactors. (2 page(s), 5/10/1973)
- ML20155E714 - Forwards request for addl info to suppl 730501 responses to request for addl info.Certain regulatory requirements established in area of sys quality group classifications which will have to be resolved prior to review conclusion. (7 page(s), 9/5/1973)
- ML20155F534 - Forwards request for addl info re pool dynamic loads for plant & submits position re review. (5 page(s), 6/13/1975)
- ML20155E430 - Forwards request for addl info re listed items concerning util application for CP.Arrangement of meeting to discuss listed matters requested. (19 page(s), 5/4/1973)
- ML20155E600 - Informs that info in several important review areas re Mark III containment will not be available for review on basis to meet blue book schedule of 730907.Based on listed info util informed of listed items. (2 page(s), 9/4/1973)
- ML20155E770 - Forwards request for addl info to suppl 730512 & 0719 responses to request for addl info.Certain regulatory requirements established re design of containment which will have to be resolved prior to conclusion of review. (11 page(s), 10/2/1973)
- ML20155E503 - Discusses design basis for hydrogen evolution from metal water reactor rate considerations.Mgt attention needs to be focused on key decision to reduce possibility that significant redesign will be required. (3 page(s), 5/23/1973)
- ML20155F545 - Forwards request for addl info re Mark III containment suppression pool dynamics,per 750820 request to review subj rept. (5 page(s), 10/16/1975)
- ML20155E967 - Forwards draft safety evaluation detailing items requiring resolution expected to occur prior to issuance of const permit & will be reported in suppl to safety evaluation. (3 page(s), 12/19/1973)
- ML20155F485 - Summary of 750603 & 04 meeting w/util in Gaithersburg,MD & Bethesda,MD,respectively re design basis loading & design methods for plant. (4 page(s), 6/10/1975)
- ML20155E578 - Forwards info requested by 730719 ltr re combustible gas control sys & bypass leakage.Encl will be identical in content to info filed later as part of Amend 2. (13 page(s), 8/14/1973)
- ML20155E550 - Forwards request for addl info re listed items concerning util application for CP. (3 page(s), 7/13/1973)
- ML20155F378 - Forwards request for addl info re Mark III containment suppression pool dynamic loads.Requests transmittal of request to applicant for discussion at 750603 meeting. (5 page(s), 5/30/1975)
- ML20155F228 - Summary of 750205 meeting w/util in Bethesda,MD re derivation of dynamic loads considered in design of containment structures & significance of loads to overall loading on structures.Attendance list encl. (4 page(s), 2/14/1975)
- ML20155F589 - Notification of 740117-18 subcommittee meeting in San Jose, CA to further discuss util application for CP & to inspect GE test facilities used to verify containment performance. (6 page(s), 1/12/1974)
- ML20155E338 - Informs of brief review re info contained in Amend 1 to plant PSAR.Level D review schedule requires first set of questions by 730406.Requests slippage of order of 6 wks because of applicant incomplete response to mini-review. (1 page(s), 1/11/1973)
- ML20155E728 - Notification of 730918 meeting w/util in Bethesda,MD to discuss applicant planned response to questions raised by staff re containment for plant. (4 page(s), 9/17/1973)
- ML20155E948 - Forwards requests for addl info re GESSAR & submits comments re application.Approval of containment design presented in GESSAR must be predicated on successful completion of sufficient amount of large scale testing. (24 page(s), 11/15/1973)