Home > NRC Library > ADAMS Public Documents
Final response to FOIA request for documents.Apps C & D documents available in PDR.Deleted portions of documents in App D,Item 77 outside scope of request.Apps E & F documents withheld (ref FOIA Exemption 5).
Accession Number: ML20151Y970
Date Released: Tuesday, September 15, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20151Y964 - Final response to FOIA request for documents.Apps C & D documents available in PDR.Deleted portions of documents in App D,Item 77 outside scope of request.Apps E & F documents withheld (ref FOIA Exemption 5). (13 page(s), 4/18/1988)
- ML20153H009 - Forwards opinion distributed at meeting on plant. (1 page(s), 4/10/1984)
- ML20153C842 - Opposes plant operation because of proximity to earthquake fault. (1 page(s), 11/12/1981)
- ML20153H032 - Forwards notice of initiation of investigation. (1 page(s), 7/31/1984)
- ML20153G781 - Responds to 840107 ltr re plant on behalf of Commissioner Gilinsky.Comments forwarded to Secretariat for inclusion in hearing record,since case is contested & Commission cannot comment. (1 page(s), 1/26/1984)
- ML20151Z299 - Informs that info requested seems more than needed & matls available not specific to plant.Waste mgt cost comes from DOE.Study could be confined to decommissioning,waste disposal,seismic retrofit & action plan. (4 page(s), 1/30/1981)
- ML20153G893 - Opposes NRC vote in favor of loading atomic fuel into plant & urges Commissioner Gilinsky to convince fellow Commissioners to reconsider decision. (2 page(s), 12/6/1983)
- ML20153D148 - Forwards info on Board Notification 83-48 re allegations on facility. (1 page(s), 4/6/1983)
- ML20153C108 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 10/27/1981)
- ML20153H087 - Forwards notices of initiations of investigations provided by Ofc of Investigations. (32 page(s), 3/11/1985)
- ML20151Z789 - Opposes licensing of plant due to site 2 1/2 miles from earthquake fault. (1 page(s), 9/19/1981)
- ML20153H230 - Partially deleted memo commending staff involved in producing analysis of ALAB-644. (1 page(s), 11/12/1981)
- ML20151Z703 - Expresses concern that plant located less that 2 1/2 miles from largest subsidiary of San Andreas Fault,which could produce quake 10 times stronger than plant was built to handle. (1 page(s), 9/20/1981)
- ML20153C184 - Opposes opening of plant because of dangers of human errors. NRC should tighten up stds. (1 page(s), 10/6/1981)
- ML20151Z928 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/24/1981)
- ML20153G756 - Responds to 840120 ltr re plant on behalf of Commisioner Gilinsky.Comments forwarded to Secretariat for inclusion in hearing records,since case is contested & Commission cannot comment. (1 page(s), 1/24/1984)
- ML20153E035 - Informs of concern re plant const problems.NRC urged to ensure const safe,emergency response plan adequate & adequate method for disposal of radwaste found. (2 page(s), 4/17/1984)
- ML20153D362 - Opposes operation of plant.Low power license should be revoked. (1 page(s), 11/11/1981)
- ML20153D289 - Ack receipt of ltr re licensing of plant.Ltr placed in official docket file & served on parties in proceeding. (1 page(s), 10/30/1981)
- ML20153C027 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 10/26/1981)
- ML20153D658 - Ack receipt of comments re facility. (1 page(s), 3/26/1982)
- ML20151Z888 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading is first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/24/1981)
- ML20153H052 - Forwards notice of initiation of investigation provided by Ofc of Investigations. (2 page(s), 9/17/1984)
- ML20245D291 - Ack receipt of 840120 ltr re plant licensing.Comments will be forwarded to Secretariat for inclusion in public record, since case is contested & Commission cannot comment. (1 page(s), 4/27/1984)
- ML20153B663 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 10/2/1981)
- ML20153C036 - Opposes opening of plant because of proximity to earthquake fault & insufficient support designs.Incident at TMI possible at plant. (1 page(s), 10/16/1981)
- ML20153G761 - Requests that opening of plant be prevented & hearing on QA & construction be held first. (1 page(s), 1/20/1984)
- ML20153B689 - Advises that plant should not open because of danger involved & possibility of earthquake.State already has 20% more energy than needed. (1 page(s), 9/28/1981)
- ML20153D326 - Forwards texts of 3 contentions in proceeding. (3 page(s), 10/6/1981)
- ML20151Z816 - Opposes licensing of plant due to site 2 1/2 miles from earthquake fault. (1 page(s), 9/19/1981)
- ML20153D579 - Commends position re plant in spite of obvious political pressures.Utils do not realize how serious mistake can be. Safe nuclear power needed.Another TMI would end industry & energy independence. (2 page(s), 11/30/1981)
- ML20153C961 - Clarifies misunderstanding from 820302 hearing re opportunity for public comment in proceeding on QA program. Comments requested re auditor but not audit.Commission has not yet decided to request comments. (1 page(s), 3/3/1982)
- ML20153D921 - Ack receipt of note on plant.Comments appreciated. (1 page(s), 4/25/1984)
- ML20151Z628 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/22/1981)
- ML20153B831 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 10/7/1981)
- ML20153D395 - Forwards articles received from Region V re facility. (1 page(s), 11/23/1981)
- ML20153E224 - Informs that rept re deviations from weld procedure codes & QA/QC discrepancies at plant forwarded to B Hayes,Director of Ofc of Investigations for action. (1 page(s), 12/6/1983)
- ML20154B484 - Opposes licensing of plant.Alternate uses of plants should be explored. (1 page(s), 1/31/1984)
- ML20153G871 - Responds to 831206 ltr re plant on behalf of Commissioner gilinsky.Comments forwarded to Secretariat for inclusion in hearing record,since case is contested & Commission cannot comment. (2 page(s), 1/26/1984)
- ML20151Z642 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/23/1981)
- ML20153D205 - Ack receipt of 800331 ltr re procedures & timing of plant low testing proceeding.Proceeding is contested adjudicatory proceeding.Executive Director for Operations responding directly on issue of delaying low power testing. (1 page(s), 5/9/1980)
- ML20153H235 - Partially deleted memo forwarding suggested approach to reverification program. (1 page(s), 11/13/1981)
- ML20153H005 - Expresses concern for family safety due to attitude of const workers at plant.Requests assurance of safety prior to licensing & operation authorized. (4 page(s), 2/27/1984)
- ML20153C002 - Opposes opening of plant because of location.Commends decision not to open plant. (1 page(s), 10/6/1981)
- ML20153C832 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 11/12/1981)
- ML20153B643 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 10/2/1981)
- ML20153C761 - Advises that plant must be stopped from both low power & full operation.License must be revoked for NRC to maintain public trust. (1 page(s), 10/31/1981)
- ML20153D478 - Opposes licensing & operation of plant due to defective seismic const,use of outdated seismic criteria in control room & incomplete evacuation plans. (1 page(s), 1/12/1982)
- ML20153C853 - Opposes opening of plant because of proximity to earthquake fault,unanswered questions & risk involved.Alternate source of energy must be developed. (3 page(s), 10/31/1981)
- ML20153E202 - Forwards Commissioner Gilinsky separate views on SECY-83-377 to be served on parties & placed in Commission Issuances. (6 page(s), 11/28/1983)
- ML20153B891 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 10/13/1981)
- ML20153C862 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 11/12/1981)
- ML20153E149 - Requests NRC close plant due to flaws. (1 page(s), 4/29/1984)
- ML20153C421 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 11/2/1981)
- ML20153D266 - Advises of deep concern re process utilized in response to util request for low power testing permit for facility.Low power testing will be delayed since plant is unique,until issues addressed. (2 page(s), 3/31/1980)
- ML20153B925 - Opposes opening of plant because of proximity to earthquake fault,consequences of meltdown & amount radwaste produced. Situation desperately needs reevaluation. (1 page(s), 10/6/1981)
- ML20151Z977 - Opposes licensing of plant due to site only 2 1/2 miles from earthquake fault. (1 page(s), 4/29/1981)
- ML20153C849 - Ack receipt of ltr re plant.Coomission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 11/12/1981)
- ML20153B863 - Informs of support of bloakade of plant.Recommends exploration & use of solar energy instead of nuclear.Plant location dangerous. (2 page(s), 10/7/1981)
- ML20153E137 - Ack receipt of 840429 ltr re plant licensing.Comments being forwarded to Secretariat for inclusion in public record, since case is contested & Commission cannot comment. (1 page(s), 5/21/1984)
- ML20153H046 - Informs of opening of new investigation by Ofc of Investigations per Commission request. (2 page(s), 7/27/1984)
- ML20153B737 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 10/2/1981)
- ML20151Z749 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/23/1981)
- ML20153G916 - Responds to 840131 ltr re plant on behalf of Commissioner Gilinsky.Comments forwarded to Secretariat for inclusion in hearing record,since case is contested & Commission cannot cpmment. (1 page(s), 2/24/1984)
- ML20153D606 - Ack note & comments re FW Mielke ltr to the press.Ltr & comments will be placed in official docket file & served on parties in proceeding. (1 page(s), 1/20/1982)
- ML20151Z493 - Informs of notification re anticipated demonstrations protesting licensing of plant.Upcoming ASLAB physical security decision will trigger protests,thus Ofc of General Counsel will provide sheriff ofc w/72 h notification. (1 page(s), 8/7/1981)
- ML20151Z938 - Opposes opening of plant because of unpreventable & irreversible nature of nuclear accident. (1 page(s), 9/14/1981)
- ML20153C321 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 10/28/1981)
- ML20153H248 - Partially deleted memo forwarding addl views on SECY-82-70. (1 page(s), 4/20/1982)
- ML20153E246 - Informs of 831209 visit to plant. (1 page(s), 12/8/1983)
- ML20153B971 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 10/13/1981)
- ML20153D909 - Forwards views expressed by Commissioners Bradford & Gilinsky re Commission Mar 1982 decision not to take review of ASLAB decision on seismic std to be used in proceeding. (27 page(s), 3/11/1983)
- ML20153G817 - Responds to 840115 ltr re plant on behalf of Commissioner Gilinsky.Comments forwarded to Secretariat for inclusion in hearing record,since case is contested & Commission cannot comment. (1 page(s), 1/26/1984)
- ML20153D056 - Forwards opinion for release w/opinions of Commissioners Gilinsky & Bradford.W/o encl. (1 page(s), 3/17/1982)
- ML20153C275 - Ack receipt of article on drugs at plant.Info seems as likely explanation as any for extraodinary development unfolding re seismic design. (1 page(s), 10/27/1981)
- ML20153C081 - Expresses concern re safety of life should plant open as scheduled.Alternative source of energy must be found so nuclear waste & danger will not spread. (3 page(s), 9/25/1981)
- ML20153H142 - Partially deleted memo forwarding addl views on SECY-81-76. (151 page(s), 2/19/1981)
- ML20153D452 - Ack receipt of 820112 ltr re plant proceedings.Comments placed in official docket file on plant & served on parties in proceeding. (1 page(s), 1/20/1982)
- ML20153D797 - Ack receipt of article on plant. (1 page(s), 4/1/1982)
- ML20153E274 - Responds to Jan 1984 ltr re licensing of plant,on behalf of Commissioner Gilinsky.Comments being forwarded to Secretariat for inclusion in hearing record,since case is contested & Commission cannot comment. (1 page(s), 1/26/1984)
- ML20153B594 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/29/1981)
- ML20153D999 - Ack 840417 ltr re plant on behalf of Commssioner Gilinsky. Comments will be forwarded to Secretariat for inclusion in public record,since case is contested & Commission cannot comment. (1 page(s), 4/27/1984)
- ML20151Z540 - Advises that plant must be closed since State of CA might experience major earthquake in the near future. (1 page(s), 9/15/1981)
- ML20151Z954 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/29/1981)
- ML20151Z864 - Ack receipt of ltr re plant.Commission decision authorizing low-power testing & fuel loading is first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/23/1981)
- ML20153C388 - Requests that ACRS reevaluate 780714 ltr until clear picture of extent of & consequences of errors at plant available. (1 page(s), 10/29/1981)
- ML20153E180 - Requests that encl memo from Commissioner Gilinsky & documents be served on parties to proceeding. (1 page(s), 10/17/1983)
- ML20151Z910 - Urges stopping of opening of plant due to problem of nuclear waste.Danger increases because of plant location near earthquake fault. (1 page(s), 9/20/1981)
- ML20151Z094 - Opposes opening of nuclear power plant at San Luis Obispo site.Site is known earthquake fault.Potential for tragedy staggering & alarming. (1 page(s), 11/19/1978)
- ML20153D779 - Expresses admiration for recipient stand that plant design be reviewed.Util should not be allowed to get away w/ slipshod engineering & haphazard execution of flawed design at cost of millions of people. (1 page(s), 3/21/1982)
- ML20153H077 - Extends congratulations on DC Circuit Court lifting stay in facility case following 841030 oral argument. (1 page(s), 11/2/1984)
- ML20153D345 - Forwards GM Jacobson 811111 ltr to N Palladino. (1 page(s), 11/11/1981)
- ML20153G851 - Requests that low-power test license be denied because plant unsafe & poorly built. (3 page(s), 1/15/1984)
- ML20153C551 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 11/12/1981)
- ML20153G791 - Requests that license for plant be denied due to plant location & unsafe design.Alternate source of fuel should be developed. (1 page(s), 1/7/1983)
- ML20153B634 - Informs of support of plant blockade base on info received. Plant should be closed & alternative energy explored. (4 page(s), 9/29/1981)
- ML20151Z853 - Ack receipt of ltr re plant.Commission decision authorizing low-power testing & fuel loading is first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/23/1981)
- ML20153C195 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 10/27/1981)
- ML20151Z984 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/29/1981)
- ML20151Z384 - Forwards draft ltr per 810109 telcon & petition for rehearing seeking review of costs.Petitions denied on ground that withdrawal of existing certificates for const require more convincing showing.Assistance in assessment requested. (1 page(s), 1/9/1981)
- ML20151Z030 - Ack receipt of ltr re plant.Provides assurance of thorough & open-minded review of issues that come before Commission. (2 page(s), 11/30/1978)
- ML20153E098 - Urges immediate NRC action to close plant.Failure to close plant will be act of extreme negligence & flagrant disregard for safety & health of citizens. (1 page(s), 1/20/1984)
- ML20153G765 - Responds to 840112 ltr re plant on behalf of Commissioner Gilinsky.Comments forwarded to Secretariat for inclusion in hearing record,since case is contested & Commission cannot comment. (1 page(s), 1/26/1984)
- ML20153D622 - Forwards ltr sent to San Luis Obispo County Telegram Tribune for NRC use. (4 page(s), 1/20/1982)
- ML20153C611 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 11/12/1981)
- ML20153G972 - Responds to 840227 ltr re plant on behalf of Commissioner Gilinsky.Comments forwarded to Secretariat for inclusion in hearing record,since case is contested & Commission cannot comment. (1 page(s), 3/6/1984)
- ML20151Z575 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/22/1981)
- ML20151Z869 - Opposes licensing of plant due to unsafe location near earthquake fault.Opinion to be conveyed to V Galinsky. (1 page(s), 9/20/1981)
- ML20153D524 - Ack receipt of 811130 ltr re plant & comments on radio program.Ltr will be placed in official docket for plant & served on parties in proceeding. (1 page(s), 12/10/1981)
- ML20153D641 - Requests that Commissioner Gilinsky addl views on plant matl false statement be served on parties to this case.Views must be printed w/Commission 820210 decision in NRC issuance. (7 page(s), 2/26/1982)
- ML20153C050 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 10/26/1981)
- ML20154A931 - Forwards info from Ahearne re facility. (1 page(s), 4/6/1983)
- ML20153C464 - Opposes opening of plant because of consequences if accident occurs.Recommends that plant be converted for other energy use.License should be revoked. (1 page(s), 10/27/1981)
- ML20153C241 - Expresses appreciation for recipient doubt re granting full power license for plant.Safety lacking at plant due to faulty const. (1 page(s), 10/15/1981)
- ML20153B656 - Opposes plant because of danger posed to society.Requests info stating opposition. (1 page(s), 9/28/1981)
- ML20153D954 - Opposes nuclear energy for production of electricity because of the risk involved.Efforts should be made to ensure safety of citizens. (1 page(s), 4/25/1984)
- ML20153C563 - Opposes licensing of plant.Informs that plant failed to comply w/ASLB & threat to revoke license should be enforced. (1 page(s), 11/12/1981)
- ML20153C281 - Forwards article of interest.W/o encl. (1 page(s), 10/19/1981)
- ML20153C912 - Informs that response to 820302 questions in error per Chairman Palladino 820303 ltr to Chairman Udall.Parties involved should have opportunity to comment & to vote when opportunity arises. (1 page(s), 3/5/1982)
- ML20153G777 - Opposes licensing of plant & urges negative vote.Paper entitled, "Infant Mortality Changes Following TMI Accident" encl. (4 page(s), 1/12/1984)
- ML20153H098 - Forwards notice of initiation of investigation provided by Ofc of Investigations. (3 page(s), 4/4/1985)
- ML20151Z521 - Ack receipt of ltr re plant.Commission decision authorizing low power testing & fuel loading first step in review of plant.Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/22/1981)
- ML20153C881 - Requests that plant be decommissioned because of danger involved & lack of integrity of util.Efforts to question plant managers appreciated. (1 page(s), 11/2/1981)
- ML20153B580 - Opposes plant due to dangerously located near fault.Plant must be denied low power testing & not operate. (1 page(s), 9/20/1981)
- ML20153G936 - Forwards comments addressed to Chairman Palladino. (1 page(s), 1/31/1984)
- ML20151Z804 - Ack receipt of ltr re plant.Commission decision authorizing low-power testing & fuel loading first step in review. Earthquake-related issues will be addressed in detail by Commission. (1 page(s), 9/23/1981)
- ML20151Z178 - Opposes plant since due to threat to future & lack of info re radwaste.Operation rights should be denied immediately. (1 page(s), 7/12/1979)
- ML20151Z137 - Ack receipt of ltr re plant.Concern will be kept in mind as case progresses. (1 page(s), 7/18/1979)
- ML20153C335 - Opposes opening of plant because of Pu waste to be produce. (1 page(s), 10/24/1981)
- ML20153B777 - Expresses opposition to licensing of plant due to frequency of radioactive leaks,unresolved problems of nuclear waste & proximity to earthquake fault. (1 page(s), 9/20/1981)
- ML20154A305 - Partially withheld Commission paper re facility prehearing conference order. (2 page(s), 2/23/1981)