Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request.Documents in Apps A-I available in PDR.
Accession Number: ML20150F241
Date Released: Wednesday, August 12, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20211E985 - Partial response to FOIA request.Documents in Apps A-I available in PDR. (32 page(s), 9/30/1986)
- ML20150F493 - Forwards Senator Tower 791109 ltr forwarding allegations of structural flaws & threats to insp personnel at facility. Requests comment. (1 page(s), 12/7/1979)
- ML20211F507 - Insp Repts 50-498/78-07 & 50-499/78-07 on 780417-20. Noncompliance noted:failure to provide revised drawings & incomplete insp of structural steel documented as complete. (9 page(s), 5/5/1978)
- ML20211F500 - Notice of violation from insp on 780417-20. (2 page(s), 5/8/1978)
- ML20211F534 - Forwards Insp Repts 50-498/78-10 & 50-499/78-10 on 780530-0602.No noncompliance noted. (2 page(s), 6/20/1978)
- ML20211F479 - Insp Repts 50-498/78-03 & 50-499/78-03 on 780221-24.No noncompliance or deviations noted.Major areas inspected: const activities,including receipt of Class 1E electrical cables & observation of concrete placement for Unit 1. (8 page(s), 3/3/1978)
- ML20211F096 - Forwards Insp Repts 50-498/78-04 & 50-499/78-04 on 780321-23 & notice of violation.Certain activities in noncompliance w/ 10CFR50,App B.Corrective actions completed prior to conclusion of insp. (2 page(s), 4/11/1978)
- ML20211F133 - Insp Repts 50-498/78-04 & 50-499/78-04 on 780321-23. Noncompliance noted:failure to follow procedures for control of special processes.W/draft order to show cause whether licensee required to take actions per Section V(A). (30 page(s), 4/11/1978)
- ML20211F578 - Insp Repts 50-498/78-01 & 50-499/78-01 on 780110-13. Noncompliance noted:failure to follow procedures for concrete placements. (6 page(s), 1/27/1978)
- ML20211F025 - Advises that oral depositions of NRC witnesses RE Hall, WC Seidle,HS Phillips,R Landsman & V Stello & original exihibits sent under separate cover for review,correction & signature.Supporting documentation encl. (334 page(s), 9/25/1984)
- ML20211F154 - Forwards Insp Repts 50-498/77-13 & 50-499/77-08 on 771219-21.No noncompliance noted. (2 page(s), 1/4/1978)
- ML20211G038 - Forwards Sept surveillance schedule & const milestone events.Activities in Aug included ASME piping installation, placement of Unit 1 steam generators & completion of setting Unit 1 containment liner dome courses. (4 page(s), 8/30/1979)
- ML20211F262 - Certifies that encl 26 pages contain true copy of 810128 ltr from KV Seyfrit to Brown & Root,Inc re licensee contractor vendor insp program audit by DF Fox on 810105-08.Supporting documentation encl. (464 page(s), 8/10/1984)
- ML20211F234 - Certifies that encl 18 pages contain true copy of 810518 ltr from JT Collins to Brown & Root,Inc re licensee contractor vendor insp program insp by DF Fox on 810413-17. (1 page(s), 8/10/1984)
- ML20211F489 - Forwards Insp Repts 50-498/78-07 & 50-499/78-07 on 780417-20 & notice of violation. (2 page(s), 5/8/1978)
- ML20211F458 - Discusses insp on 750317-20 re implementation of QA program for const activities concerning CP application.QA program deficient,per 10CFR50,App B, "QA Criteria for Nuclear Power Plants." Responses requested within 30 days. (15 page(s), 4/2/1975)
- ML20211F518 - Forwards SALP Board rept released on 820618.Deposition of WC Hubacek on 840920 in District Court of Matagorda County, TX encl. (333 page(s), 6/28/1982)
- ML20150F239 - Responds to 790709 ltr re discovery of new voids in concrete containment bldg.Discusses discovery of defect by util & steps taken by NRC & util to correct deficiency.No difficulty is envisioned in repairing voids. (2 page(s), 7/26/1979)
- ML20211F186 - Insp Repts 50-498/77-13 & 50-499/77-08 on 771219-21.No noncompliance or deviations noted.Major areas inspected: repair of structural steel columns & review of records for containment basemat concrete placements. (4 page(s), 1/4/1978)
- ML20211F216 - Certifies that encl 22 pages contain true copy of 810819 ltr from KV Seyfrit to Brown & Root,Inc re licensee contractor vendor insp program insp by DF Fox on 810720-24. (1 page(s), 8/10/1984)
- ML20211F065 - Certifies that 10CFR50,App B as existed on 721031 & each subsequent amend true & accurate copy of document. (10 page(s), 7/2/1984)
- ML20150F664 - Responds to 800314 ltr requesting response to 791019 inquiry re investigation of structural flaws & threats to insp personnel at facility.Forwards NRC 791121 response to 791019 inquiry.Investigation rept briefing scheduled wk of 800414. (10 page(s), 4/8/1980)
- ML20150F528 - Responds to 791030 referral of constituent 791020 ltr re const deficiencies & recommendations.Discusses NRC process for overseeing quality of const & safety of operation of each plant.Investigation of South TX reactors underway. (2 page(s), 1/10/1980)
- ML20211F072 - Certifies that IE document listed & encl true & accurate copy of document. (3 page(s), 6/14/1984)
- ML20211F573 - Notice of violation from insp on 780110-13. (1 page(s), 1/27/1978)
- ML20209B066 - Summary of 800426-27 meeting in Bethesda,MD re resolution of review of facility investigation findings on structural backfill.Design requirements satisfied based on results of in-place density test & field investigation borings. (182 page(s), 5/29/1981)
- ML20211F114 - Notice of violation from insp on 780321-23. (1 page(s), 4/11/1978)
- ML20211F419 - Clarifies statements in newspaper article re facilities,per Commissioner Bradford 791019 request.W/791031 draft memo from V Stello to Commissioner Bradford. (15 page(s), 10/26/1979)
- ML20211F280 - Certifies that encl 359 pages contain true copy of ASLB 840314 partial initial decision (OL-Phase I). (29 page(s), 8/10/1984)
- ML20211F343 - Forwards ltr sent to A Canales,US Atty,Houston,TX re actions of K Seyfrit,Director,Region IV.W/o encl.Supporting documentation encl. (60 page(s), 4/11/1980)
- ML20211F549 - Insp Repts 50-498/78-10 & 50-499/78-10 on 780530-0602.No noncompliance or deviations noted.Major areas inspected: records re concrete placement in Unit 2.Supporting documentation encl. (1250 page(s), 6/20/1978)
- ML20211F583 - Responds to NRC 780127 ltr re violations noted in Insp Repts 50-498/78-01 & 50-499/78-01.Corrective actions:Const Procedure A040KPCCP-4 revised to clarify cold weather conditions for concrete pouring. (3 page(s), 2/28/1978)
- ML20211F014 - Advises that coversheet of encl Insp Repts 50-498/80-17 & 50-499/80-17 signed w/understanding that comments discussed in 800710 telcon will be incorporated except comment on vibration frequency.Supporting documentation encl. (16 page(s), 7/10/1980)
- ML20211F004 - Marked-up notice of violation from insp on 791110-800207, draft investigation rept & proposed enforcement actions. (282 page(s), 9/30/1986)
- ML20211F589 - Ack receipt of 780228 ltr informing NRC of steps taken to correct violations noted in Insp Repts 50-498/78-01 & 50-499/78-01. (6 page(s), 3/3/1978)
- ML20211F435 - Transcript of 820120 hearing in Houston,TX.Pp 105-109. (5 page(s), 1/20/1982)
- ML20211F398 - Forwards Apr surveillance schedule & const milestone events. Activities in Mar included concrete placement for portion of ninth lift & completion of eighth on Unit 1 exterior wall & containment liner for Unit 2. (1 page(s), 4/3/1978)
- ML20211F473 - Forwards Insp Repts 50-498/78-03 & 50-499/78-03 on 780221-24.No noncompliance noted. (2 page(s), 3/3/1978)
- ML20211F053 - Forwards transcript of KV Seyfrit CBS Magazine interview. Requests that KV Seyfrit review transcript prior to deposition. (588 page(s), 7/3/1984)
- ML20211F541 - Forwards Insp Repts 50-498/78-01 & 50-499/78-01 on 780110-13 & notice of violation. (2 page(s), 1/27/1978)
- ML20150F458 - Responds to C Gage concerns re const practices at facility. Allegations re structural flaws & threats to insp personnel investigated by NRC.In light of other agency investigations & new allegations,investigation is reopening. (1 page(s), 11/21/1979)
- ML20211F514 - Ack receipt of 791116 & 800125 ltrs in response to NRC 791016 & 801111 ltrs re Insp Repts 50-498/78-14 & 50-499/79-14.Supporting documentation encl. (16 page(s), 2/20/1980)
- ML20211F193 - Certifies that 860421 staff requirements memo from SJ Chilk to WJ Dircks re briefing on investigation of QA/QC problems at facilities true & accurate copy of document. (1 page(s), 6/29/1984)