Further response to FOIA request for 16 categories of records re facilities.Forwards App D & E documents.Documents also available in PDR.
Accession Number: ML20150F172
Date Released: Tuesday, August 11, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20209B407 - Forwards review of JW Cook 820422 ltr to HR Denton on response to NRC request for addl info re borated water storage tank & svc water pump structure. (4 page(s), 5/12/1982)
- ML20150F806 - Discusses matters to be addressed prior to 790702 evidentiary hearing.NRC prepared to assist ASLB in appropriate manner.Conference scheduled for 790615 to discuss record,discovery by deposition & transcripts. (2 page(s), 6/14/1979)
- ML20151B447 - Requests util be ordered to distribute Bechtel rept re cost-benefit analysis & ASLB should promptly reopen hearings on continued operation of units. (3 page(s), 2/14/1980)
- ML20210S451 - Forwards background info on Kerr-McGee & major issues of emergency preparedness at nuclear power plants in Region III.State activities & highlights for nuclear power plants in Region III also encl.Supporting documentation encl. (35 page(s), 9/8/1983)
- ML20151C503 - Submits IE 810105 daily staff notes re proposed imposition of civil penalties against Midland,malfunction of target rack safety relief valve at Dresden & malfunction of main steam hot reheat valves at Fort St.Vrain. (1 page(s), 1/6/1981)
- ML20209B400 - Recommends that Commission not review ALAB-674 decision. (10 page(s), 6/3/1982)
- ML20150F170 - Summary of 790201 Affirmative Session 79-2 in Washington,DC re SECY-79-17,FOIA appeal of A Kranish & settlement & termination of special proceeding. (1 page(s), 2/5/1979)
- ML20209B413 - Requests info re spring stiffness computations as followup to 820118-19 audit re facility underpinning. (2 page(s), 1/28/1982)
- ML20151B319 - Transcript of JD Kane 801015 deposition in Detroit,MI,Vol 2. Pp 1-209. (209 page(s), 10/15/1980)
- ML20209B331 - Summary of 820308 telcon w/util & Bechtel re soil spring stiffness for auxiliary bldg underpinning & Phase II const. (8 page(s), 3/11/1982)
- ML20151B324 - Transcript of JD Kane 801014 deposition in Detroit,MI.Vol 1. Pp 1-154a. (155 page(s), 10/14/1980)
- ML20210S469 - Advises not to do any housecleaning of paperwork re Zack,due to interrogatories & document production pending. (78 page(s), 3/13/1984)
- ML20209B290 - Notification of 820318 meeting w/util & Bechtel in Bethesda, MD to resolve SER open item re Section 9.5.3. (2 page(s), 3/11/1982)
- ML20209B517 - Requests written answers to M Sinclair 820618 interrogatories.Responsible branches marked next to relevant questions. (20 page(s), 7/9/1982)
- ML20151G694 - Transcript of 810326 deposition in Bethesda,MD re review of Corps of Engineers rept & Amend 85.Pp 407-501. (94 page(s), 3/26/1981)
- ML20209B419 - Requests info for 820201-05 audit for License Condition 5 re facility underpinning.Comments will be forwarded after 820128 site visit. (10 page(s), 1/28/1982)