Home > NRC Library > ADAMS Public Documents
Further response to FOIA request for documents associated w/new NRC procedure for handling plant-specific backfits,per SECY-83-321 & Generic Ltr 84-08.App A documents encl.App B documents available in PDR.Search continuing.
Accession Number: ML20105C245
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20106C631 - Further response to FOIA request for documents associated w/new NRC procedure for handling plant-specific backfits,per SECY-83-321 & Generic Ltr 84-08.App A documents encl.App B documents available in PDR.Search continuing. (4 page(s), 9/13/1984)
- ML20105C358 - Discusses 831020 meeting re proposed Tech Spec surveillance requirements for BWRs for high water level trip & turbine bypass sys.NRR will address requirements as generic positions. (1 page(s), 10/21/1983)
- ML20105D086 - Comments on revised regulatory effectiveness review & vital area validation repts.Primary concern identified in 830829 memo still applicable.Prompt corrective action required re physical security plan. (2 page(s), 2/6/1984)
- ML20105C901 - Comments on revised regulatory effectiveness review rept for facilities.Comments re regulatory basis from which to require or suggest plant changes not addressed. (1 page(s), 1/31/1984)
- ML20105C385 - Forwards comments on regulatory effectiveness review re safeguards program,as discussed at joint NRR/NMSS meeting on 831027.Vital area assumptions will be discussed generically at 831116 meeting.Encls withheld. (2 page(s), 11/8/1983)
- ML20105D270 - Recommends consideration of five listed categories re regulatory effectiveness review repts,including actions or adequacy of Commission regulation & guidance & compliance w/ approved safeguards plans. (2 page(s), 4/2/1984)
- ML20106A029 - Discusses backfit issue re regulatory effectiveness review & vital area validation rept & site review conducted on 830523-27. (2 page(s), 5/31/1984)
- ML20105C768 - Comments on regulatory effectiveness reviews including vital area validation.North Anna repts include external threat, Turkey Point repts assume insider threat. (2 page(s), 2/1/1984)
- ML20105D278 - Provides status of backfit issue re regulatory effectiveness review & vital area validation rept.Licensee response due 840518. (2 page(s), 5/7/1984)
- ML20105D266 - Informs of potential backfit re regulatory effectiveness review & vital area validation.Licensee will provide comments,actions to be taken & schedules within 2 wks. (3 page(s), 5/7/1984)
- ML20105C243 - Trip rept of 830524-25 site visit re regulatory effectiveness review of security measures. (2 page(s), 9/6/1983)