Fifth partial response to FOIA request for documents.Records in App H will be made available in PDR.App I records will be withheld in entirety (ref Exemption 5).
Accession Number: ML20094P449
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20094P445 - Fifth partial response to FOIA request for documents.Records in App H will be made available in PDR.App I records will be withheld in entirety (ref Exemption 5). (4 page(s), 11/13/1995)
- ML20097H963 - Requests that preparations begin to conduct DE on plant to obtain addl info to make informed decision re overall performance & requests meeting to support decision to proceed w/onsite phase of evaluation. (1 page(s), 7/13/1994)
- ML20094P672 - Investigation rept 4-93-020.No noncompliance noted.Major areas investigated:TS which had been deliberately violated on 930309 & 10,when during RPV disassembly,RPV head,dryer & separator had been moved over irradiated fuel. (84 page(s), 7/14/1994)
- ML20094P621 - Forwards OI rept of investigation case number 4-93-020 re alleged deliberate violation of TS. (1 page(s), 8/3/1994)
- ML20097H861 - Requests technical assistance to clarify NRC position on Thermo-Lag installations subject to exemptions from regulatory requirements. (4 page(s), 7/21/1993)
- ML20097J058 - Informs Commission of status of restart of plant & related staff actions. (3 page(s), 2/10/1995)
- ML20094P726 - Informs that R Zimmeran concurs on package dtd 950208 re EA 95-012 on plant. (1 page(s), 2/9/1995)
- ML20094P549 - Informs of concurrence w/action proposed by Region re Regional Enforcement Recommendation.Specific comments on EA encl re proposed level III violations. (2 page(s), 3/15/1993)
- ML20094P692 - Submits message that J Roe sent to J Lieberman re plant DFI on heavy loads. (1 page(s), 10/4/1994)
- ML20094P710 - Staff requirements memo re SECY-94-285,proposed $300,000 in civil penalties to util re violations at plant.Advises that Commission has not objected to proposed civil penalty to util. (1 page(s), 12/9/1994)
- ML20094P680 - Informs of concurrence re plant DFI on heavy loads. (1 page(s), 9/26/1994)
- ML20094P707 - Provides DSA & SET repts for review in preparation for Commission briefing on SET evaluation on 941207. (2 page(s), 12/2/1994)
- ML20097H968 - Formalizes plans to conduct special evaluation of plant & review ongoing self-assessment efforts. (3 page(s), 7/29/1994)