Further response to FOIA request for all documents re four items.Names & positions of confidential sources deleted from IE Insp Rept 50-483/78-04,per FOIA Exemption 7D.App A documents in PDR.
Accession Number: ML20091K510
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20091K507 - Further response to FOIA request for all documents re four items.Names & positions of confidential sources deleted from IE Insp Rept 50-483/78-04,per FOIA Exemption 7D.App A documents in PDR. (4 page(s), 4/24/1984)
- ML20091K583 - Response to ASLAB 831020 memorandum & order re revised floor response spectra identified in integrated design & insp program rept. (6 page(s), 11/4/1983)
- ML20091K574 - Handwritten memo forwarding response to ASLAB question re delay in resolution of revised floor response spectra,per integrated design insp.Recommends J Ma &/or B Shewmaker perform review of Bechtel work in Gaithersburg,MD. (1 page(s), 11/18/1983)
- ML20091K591 - Affidavit of DP Allison re Integrated Design Insp Rept 50-483/82-22,Observation 4-1 on revised floor response spectra for auxiliary bldg.Certificate of Svc encl. (7 page(s), 11/4/1983)
- ML20091K543 - Forwards evaluation of Findings 2-1 & 2-7 of Region III integrated design insp.Design acceptable.FSAR must be revised to reflect actual design. (6 page(s), 1/27/1984)
- ML20091K571 - Requests followup & closeout of actions on integrated design insp Findings F 2-1 & 2-7 of IE Insp Rept 50-483/83-22,per G Edison telcon agreement. (6 page(s), 11/16/1983)
- ML20091K654 - IE Insp Rept 50-483/78-04 on 780424-25.Noncompliance identified:failure to repair embedment per procedures. (9 page(s), 6/21/1978)
- ML20091K563 - Identifies agreements re review & closeout of integrated design insp team findings & unresolved items,per telcons w/ D Allison,G Edison & C Hale. (4 page(s), 10/7/1983)
- ML20091K523 - Summary of 830912 & 14 caseload forecast meeting & site visit to assess const completion schedule.Plant will be slightly less than 100% complete at fuel load due to incomplete NUREG-0737 items. (6 page(s), 4/24/1984)
- ML20091K602 - Responds to NRC 780622 ltr re violations noted in IE Insp Rept 50-483/78-04.Corrective actions:nonconformance repts written,visual insp of plate found no cracks or detrimental effects from repairs & foreman will monitor work closely. (2 page(s), 7/27/1978)
- ML20091K644 - Notice of violation from insp on 780424-25. (1 page(s), 6/22/1978)
- ML20091K616 - Ack receipt of 780725 ltr informing NRC of steps taken to correct violations noted in IE Insp Rept 50-483/78-04. Corrective actions will be examined in future insp. (1 page(s), 8/8/1978)
- ML20091K558 - Requests review of integrated design insp Findings 2-1 & 2-7 & applicant response,by 831231. (5 page(s), 12/1/1983)
- ML20091K632 - Discusses IE insp of CPPR-139 activities on 780424-25 & forwards notice of violation. (2 page(s), 6/22/1978)
- ML20091K534 - Forwards evaluation of Findings F 2-1 & F 2-7 of Region III integrated design insp at facility (Task Interface Agreement 84-04),per 831116 request.Turbine driven auxiliary feedwater sys pump steam tunnel designs acceptable. (6 page(s), 3/28/1984)