Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for records.App B & C records available in PDR.
Accession Number: ML20081D760
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20081E410 - Submits comments on draft NUREG/CR-5604, "Assessment of ISLOCA Risks - Methodology & Application:Davis Besse." (5 page(s), 10/31/1990)
- ML20083B843 - Notifies of 900227 meeting w/INEL re results of ISLOCA program review. (6 page(s), 2/27/1990)
- ML20083B473 - "Assessment of Potential for ISLOCA at Davis-Besse Nuclear Power Station," draft rept. (204 page(s), 2/16/1990)
- ML20083B435 - Informs of 900226 meeting re ISLOCA Research Program. (4 page(s), 2/8/1990)
- ML20083B658 - Forwards NRC Form 426A for NUREG CR-5603, "Pressure- Dependent Fragilities for Piping Components - Pilot Study on Davis-Besse Nuclear Power Station." W/o encl. (1 page(s), 10/1/1990)
- ML20083B767 - Comments on NUREG CR-5604 re ISLOCA.Concludes that in order to multiply probabilities given in branches of event tree all values used need to be mean values. (5 page(s), 11/7/1990)
- ML20083B876 - Requests peer review of draft ISLOCA rept, "Assessment of Potential for ISLOCA at Davis-Besse Nuclear Power Station" & comments by 900313. (4 page(s), 3/1/1990)
- ML20083B504 - Provides comment re 900309 memo to G Burdick on INEL rept, "Assessment of Potential for ISLOCA at Davis-Besse Nuclear Power Station." (5 page(s), 3/23/1990)
- ML20083B709 - Invites interested parties to meeting re ISLOCA program review. (2 page(s), 10/1/1990)
- ML20081E008 - Confirms 900307 discussions re next actions on Interfacing Sys LOCA Program.Peer review of current work on Davis-Besse will be performed focusing on validity of assumptions made re operator errors. (7 page(s), 3/9/1990)
- ML20081D989 - Provides comments on draft rept, "Assessment of Potential for ISLOCA at Davis Besse Nuclear Power Station." (7 page(s), 4/2/1990)
- ML20083B771 - Forwards rept on assessment of ISLOCA risk for Davis-Besse. (40 page(s), 12/5/1990)
- ML20081E393 - Submits comments on review of second draft of INEL ISLOCA rept.Comparison of first & second drafts indicate no changes in methodology or conclusions. (7 page(s), 10/29/1990)
- ML20081D985 - Comments on INEL draft interfacing sys LOCA rept re plant. Conclusion that human errors far outweigh hardware failures as contributor to core melt frequency & risk confirms original expectations. (2 page(s), 3/13/1990)
- ML20081E006 - Concurs generally w/positions expressed in 900309 memo to G Burdick re peer review activity.Different viewpoint offered re reexamining benefits of continuing interfacing sys LOCA effort on two more plants after Davis Besse. (1 page(s), 5/8/1990)
- ML20083B696 - Forwards NUREG CR-5602, "Pressure-Dependent Fragilities for Piping Components - Pilot Study on Davis-Besse Nuclear Power Station." W/o encl. (5 page(s), 10/1/1990)
- ML20083B356 - Forwards ISLOCA research program info re listed plants. (3 page(s), 7/25/1989)
- ML20083B549 - Monthly rept for June 1990 for FIN B-5699, "ISLOCA Research Program." (37 page(s), 7/13/1990)
- ML20081D971 - Notification of 900227 meeting w/INEL to discuss results of analyses of risk associated w/ISLOCA,as well as modeling & methods & human reliability analysis techniques used. (1 page(s), 2/15/1990)
- ML20083B730 - Comments on draft NUREG CR-5604, "Assessment of ISLOCA Risks - Methodology & Application:Davis-Besse Nuclear Station." (8 page(s), 10/22/1990)