Home > NRC Library > ADAMS Public Documents
Forwards eight oversize revised drawings.Drawing transmittal list encl.Aperture cards are available in PDR.
Accession Number: ML20062D153
Date Released: Friday, October 2, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20062D149 - Forwards eight oversize revised drawings.Drawing transmittal list encl.Aperture cards are available in PDR. (2 page(s), 7/22/1982)
- ML20262B814 - "Piping & Instrument Diagram:Steam Generator Secondary System," as-built. (ACTUAL REVISION STATUS:23F11.) (1 page(s), 7/7/1982)
- ML20262B820 - "Piping & Instrument Diagram:Service Water System," as-built.Sheet 2 of 3. (1 page(s), 6/3/1982)
- ML20262B831 - "Piping & Instrument Diagram:Make-up Water Demineralization System." Sheet 3 of 3. (ACTUAL REVISION STATUS:14P3.) (1 page(s), 5/17/1982)
- ML20262B840 - "Piping & Instrument Diagram:Start-up & Blowdown Demineralizer System." (ACTUAL REVISION STATUS:8P2.) (1 page(s), 5/15/1982)
- ML20262B848 - "Piping & Instrument Diagram:Chemical & Volume Control System." Sheet 1 of 2. (1 page(s), 6/3/1982)
- ML20262B861 - "Piping & Instrument Diagram:Component Cooling Water System," as-built.Sheet 2 of 2. (1 page(s), 6/16/1982)
- ML20262B881 - "HVAC Control Diagram:Auxiliary Building Extension," as-built.Sheet 2 of 2. (1 page(s), 5/26/1982)
- ML20262B893 - "Air Flow Diagram:Heating,Ventilating,Air Conditioning Aux Bldg - Radwaste Area," as-built.Sheet 1 of 3. (1 page(s), 5/27/1982)