Home > NRC Library > ADAMS Public Documents
Forwards post-accident sampling sys description,operating procedures & four oversize sys flow diagrams in response to NUREG-0737 Item II.B.3.
Accession Number: ML20050C369
Date Released: Wednesday, September 30, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20050C368 - Forwards post-accident sampling sys description,operating procedures & four oversize sys flow diagrams in response to NUREG-0737 Item II.B.3. (2 page(s), 3/30/1982)
- ML20050C387 - "Sys Description for Normal & Post-Accident Sampling Sys for Virgil C Summer Unit 1." Two oversize drawings encl. Aperture cards are available in PDR. (39 page(s), 3/12/1982)
- ML20260K736 - "Piping Sys Flow Diagram:Nuclear Sampling. (1 page(s), 3/2/1982)
- ML20260K739 - "Piping Sys Flow Diagram:Normal and Post-Accident Sampling," as-built. (1 page(s), 3/15/1982)
- ML20050C433 - "Final Sys Design Description:Post-Accident Hydrogen Removal Sys for Virgil C Summer Unit 1." Two oversize drawings encl.Aperture cards are available in PDR. (26 page(s), 7/24/1981)
- ML20260K744 - "Piping Sys Flow Diagram:Post Accident Hydrogen Removal and Alternate Purge Sys." (1 page(s), 3/9/1982)
- ML20260K748 - "Building Service System Flow Diagram:RB Purge Supply & Purge Exhaust Systems," as-built. (1 page(s), 3/18/1982)
- ML20050C450 - "Health Physics Procedure:Post-Accident Reactor Bldg Atmosphere Sampling," Revision 1. (17 page(s), 2/10/1982)
- ML20050C457 - "Chemistry Operating Procedure:Operation of Nuclear Sample Sys Under Normal & Post-Accident Conditions," Revision 1. (50 page(s), 2/19/1982)