Home > NRC Library > ADAMS Public Documents
Forwards LERs 80-017/01T-0,80-018/01T-0 & 80-019/03L-0.
Accession Number: ML19305D782
Date Released: Friday, November 15, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19305D781 - Forwards LERs 80-017/01T-0,80-018/01T-0 & 80-019/03L-0. (2 page(s), 4/8/1980)
- ML19305D794 - LER 80-017/01T-0:on 800326,reanalysis of seismic pipe stress of main steam piping inside valve house for OBE long-term criteria showed,for some conditions,allowable stress level may be exceeded in headers for main steam relief valves. (2 page(s), 4/8/1980)
- ML19305D797 - LER 80-018/01T-0:on 800326,plant operators were testing temporary fire pump when section of fire main failed.Caused by piping failure.Failed section of piping replaced. (2 page(s), 4/8/1980)
- ML19305D809 - LER 80-019/03L-0:on 800310,while steam flushing,crack found in channel head of liquid waste evaporator bottoms heat exchanger.Caused by equipment failure,probably due to chloride stress corrosion.Sleeve welded over channel head. (2 page(s), 4/8/1980)