Home > NRC Library > ADAMS Public Documents
Indian Point Unit 3 Submittal of Revision 8 to Updated Final Safety Analysis Report, Technical Specification Bases, Technical Requirements Manual and Holtec International Licensing Report.
Accession Number: ML19282B159
Date Released: Wednesday, July 22, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19282B117 - Indian Point Unit 3 Submittal of Revision 8 to Updated Final Safety Analysis Report, Technical Specification Bases, Technical Requirements Manual and Holtec International Licensing Report. (22 page(s), 9/26/2019)
- ML19282B109 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Technical Requirements Manual. (274 page(s), 9/26/2019)
- ML19282B112 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Technical Specification Bases. (768 page(s), 9/26/2019)
- ML19282B115 - HOLTEC Report, IP-RPT-11-00032, Revision 5. (509 page(s), 12/19/2017)
- ML19282A995 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 1, Introduction & Summary. (119 page(s), 9/26/2019)
- ML19282A998 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 1, Figures. (6 page(s), 7/31/1982)
- ML19282B000 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 1, Drawings_Redacted. (2 page(s), 9/26/2019)
- ML19282B002 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 2, Site & Environment. (569 page(s), 9/26/2019)
- ML19282B005 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 2, Figures. (9 page(s), 10/31/2003)
- ML19282B007 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 2, Drawings. (1 page(s), 9/26/2019)
- ML19282B010 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 3, Reactor. (90 page(s), 9/26/2019)
- ML19282B012 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 3, Figures. (44 page(s), 7/31/1982)
- ML19282B014 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System. (109 page(s), 9/26/2019)
- ML19282B016 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 4, Figures. (24 page(s), 7/31/1991)
- ML19282B018 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 4, Drawings. (2 page(s), 9/26/2019)
- ML19282B021 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 5, Containment. (9 page(s), 9/26/2019)
- ML19282B023 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 5, Figures. (39 page(s), 11/30/2001)
- ML19282B025 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 5, Drawings_Redacted. (21 page(s), 9/26/2019)
- ML19282B027 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (210 page(s), 9/26/2019)
- ML19282B029 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 6, Figures. (34 page(s), 9/26/2019)
- ML19282B032 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 6, Drawings_Redacted. (8 page(s), 9/26/2019)
- ML19282B034 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation & Control. (106 page(s), 9/26/2019)
- ML19282B036 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 7, Figures. (24 page(s), 9/26/2019)
- ML19282B039 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 7, Drawings_Redacted. (14 page(s), 9/26/2019)
- ML19282B041 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems. (30 page(s), 9/26/2019)
- ML19282B043 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 8, Drawings. (11 page(s), 9/26/2019)
- ML19282B046 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary & Emergency Systems. (189 page(s), 9/26/2019)
- ML19282B049 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 9, Figures. (10 page(s), 9/26/2019)
- ML19282B052 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 9, Drawings_Redacted. (20 page(s), 9/26/2019)
- ML19282B054 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 10, Steam & Power Conversion System. (44 page(s), 9/26/2019)
- ML19282B057 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 10, Figures. (20 page(s), 9/26/2019)
- ML19282B058 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 10, Drawings_Redacted. (28 page(s), 9/26/2019)
- ML19282B060 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 11, Waste Disposal and Radiation Protection Systems. (67 page(s), 9/26/2019)
- ML19282B062 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 11, Figures. (2 page(s), 9/26/2019)
- ML19282B063 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 11, Drawings_Redacted. (6 page(s), 9/26/2019)
- ML19282B065 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations. (14 page(s), 9/26/2019)
- ML19282B066 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 12, Figures. (2 page(s), 9/26/2019)
- ML19282B068 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations. (38 page(s), 9/26/2019)
- ML19282B071 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 13, Figures. (3 page(s), 9/26/2019)
- ML19282B074 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis. (328 page(s), 9/26/2019)
- ML19282B075 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 14, Figures. (181 page(s), 9/26/2019)
- ML19282B078 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 15, Technical Specifications and Bases. (1 page(s), 9/26/2019)
- ML19282B081 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 16, Design Criteria for Structures and Equipment. (63 page(s), 9/26/2019)
- ML19282B083 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 16, Figures. (9 page(s), 9/26/2019)
- ML19282B085 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program. (1 page(s), 9/26/2019)
- ML19282B087 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Chapter 18, Appendix A, License Renewal. (36 page(s), 9/26/2019)
- ML19282B090 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Table of Contents. (1 page(s), 9/26/2019)
- ML19282B092 - Indian Point Unit 3, Revision 8 to Updated Final Safety Analysis Report, Instructions and Key to Unit 3 UFSAR for Revision 08. (2 page(s), 9/26/2019)