Home > NRC Library > ADAMS Public Documents
Shearon Harris UFSAR Rev 61 (Public).
Accession Number: ML18337A205
Date Released: Thursday, January 3, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17150A259 - Shearon Harris Nuclear Power Plant, Unit 1 - FSAR Amendment No. 61. (28 page(s), 5/10/2017)
- ML18337A208 - Shearon Harris UFSAR Rev 61 Chapter 1, Introduction and General Description of Plant. (146 page(s), 5/10/2017)
- ML18337A271 - Shearon Harris UFSAR Rev 61 Chapter 2, Site Characteristics. (1201 page(s), 5/10/2017)
- ML18337A272 - Shearon Harris UFSAR Rev 61 Chapter 3, Conformance with NRC General Design Criteria. (181 page(s), 5/10/2017)
- ML18337A276 - Shearon Harris UFSAR Rev 61, Chapter 4, Reactor. (181 page(s), 5/10/2017)
- ML18337A278 - Shearon Harris UFSAR Rev 61, Chapter 5, Reactor Coolant System and Connected Systems. (198 page(s), 5/10/2017)
- ML18337A279 - Shearon Harris UFSAR Rev 61, Chapter 6, Engineered Safety Features. (741 page(s), 5/10/2017)
- ML18337A287 - Shearon Harris UFSAR Rev 61, Chapter 7, Instrument and Controls. (324 page(s), 5/10/2017)
- ML18337A295 - Shearon Harris UFSAR Rev 61, Chapter 8, Electric Power. (168 page(s), 1/10/2017)
- ML18337A303 - Shearon Harris UFSAR Rev 61, Chapter 9, New and Spent Fuel Storage and Handling. (475 page(s), 5/10/2017)
- ML18337A309 - Shearon Harris UFSAR Rev 61, Chapter 10, Summary Description. (188 page(s), 5/10/2017)
- ML18337A329 - Shearon Harris UFSAR Rev 61, Chapter 11, Radioactive Waste Management. (159 page(s), 5/10/2017)
- ML18337A334 - Shearon Harris UFSAR Rev 61, Chapter 12, Radiation Protection. (162 page(s), 5/10/2017)
- ML18337A337 - Shearon Harris UFSAR Rev 61, Chapter 13, Conduct of Operations. (39 page(s), 5/10/2017)
- ML18337A343 - Shearon Harris UFSAR Rev 61, Chapter 14, Initial Test Program. (126 page(s), 5/10/2017)
- ML18337A348 - Shearon Harris UFSAR Rev 61, Chapter 15, Accident Analysis. (500 page(s), 5/10/2017)
- ML18337A352 - Shearon Harris UFSAR Rev 61 Chapter 16, Preliminary Technical Specification (PSAR). (13 page(s), 5/10/2017)
- ML18337A361 - Shearon Harris UFSAR Rev 61, Chapter 17, Quality Assurance during Design and Construction. (4 page(s), 5/10/2017)
- ML18337A363 - Shearon Harris UFSAR Rev 61, Chapter 18, Final Safety Analysis Report Supplement for License Renewal. (32 page(s), 5/10/2017)
- ML18337A379 - Shearon Harris UFSAR Rev 61, Drawings Part 1. (31 page(s), 5/10/2017)
- ML18337A383 - Shearon Harris UFSAR Rev 61 Drawings Part 2. (38 page(s), 5/10/2017)
- ML18337A384 - Shearon Harris UFSAR Rev 61 Drawings Part 3. (130 page(s), 5/10/2017)
- ML18337A386 - Shearon Harris UFSAR Rev 61 Drawings Part 4. (89 page(s), 5/10/2017)
- ML18337A389 - Shearon Harris UFSAR Rev 61, Drawings, Part 5. (39 page(s), 5/10/2017)
- ML18337A392 - Shearon Harris UFSAR Rev 61, Drawings, Part 6. (21 page(s), 5/10/2017)
- ML18337A395 - Shearon Harris UFSAR Rev 61, Drawings, Part 7. (30 page(s), 5/10/2017)
- ML18337A399 - Shearon Harris UFSAR Rev 61, Drawings, Part 8. (477 page(s), 5/10/2017)
- ML18337A402 - Shearon Harris UFSAR Rev 61, End Appendices. (70 page(s), 5/10/2017)