Home > NRC Library > ADAMS Public Documents
AREVA TN-B1 Shipping Container, Application for Approval for Incorporation of ATRIUM 11 Fuel Assemblies.
Accession Number: ML17251A140
Date Released: Friday, September 15, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17251A160 - AREVA TN-B1 Shipping Container, Application for Approval for Incorporation of ATRIUM 11 Fuel Assemblies. (5 page(s), 9/1/2017)
- ML17251A181 - AREVA - 51-5046576-00, "RAJ-II Shipping Container Test Results". (31 page(s), 6/28/2004)
- ML17251A183 - AREVA - Overview of Changes 4 to 6 to FS1-0014159, Safety Analysis Report, Attachment. (5 page(s), 9/1/2017)
- ML17251A185 - Certificate of Compliance No. 9372, Revision 1, Model No. TN-B1. (9 page(s), 9/1/2017)
- ML17251A190 - AREVA - FS1-0024572, Revision 3.0, "AREVA Front End BG Fuel BL, TN-B1 Container Thermal Analysis Applicability," (Non-Proprietary). (14 page(s), 8/29/2017)
- ML17251A192 - AREVA - Response to RAI 2-1. (5 page(s), 9/1/2017)
- ML17251A194 - AREVA - Response to RAI 2-2. (3 page(s), 9/1/2017)
- ML17251A196 - AREVA - Response to RAI 2-3. (2 page(s), 9/1/2017)
- ML17251A198 - AREVA - Response to RAI 2-4. (3 page(s), 9/1/2017)
- ML17251A200 - AREVA - Response to RAI 3-1. (3 page(s), 9/1/2017)
- ML17251A201 - AREVA - Response to RAI 3-2. (3 page(s), 9/1/2017)
- ML17251A203 - AREVA - Response to RAI 4-1. (3 page(s), 9/1/2017)
- ML17251A204 - AREVA - Response to RAI 4-2. (2 page(s), 9/1/2017)
- ML17251A205 - AREVA - Response to RAI 6-1. (1 page(s), 9/1/2017)
- ML17251A206 - AREVA - Response to RAI 6-2. (1 page(s), 9/1/2017)
- ML17251A208 - AREVA - Response to RAI 6-3. (1 page(s), 9/1/2017)
- ML17251A210 - AREVA - Response to RAI 6-4 (Non-Proprietary). (5 page(s), 9/1/2017)