Home > NRC Library > ADAMS Public Documents
Further response to FOIA request for all documentation re Comanche Peak Task Force & alleger info provided in SSER 8. App M documents encl.Listed documents partially withheld (ref FOIA Exemption 5).
Accession Number: ML17192A346
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20199A477 - Further response to FOIA request for all documentation re Comanche Peak Task Force & alleger info provided in SSER 8. App M documents encl.Listed documents partially withheld (ref FOIA Exemption 5). (37 page(s), 6/4/1986)
- ML20199A575 - Voided Rev 86 to table of contents for Procedure QI-QCP-1.1-0, "Mechanical QC Discipline Manual." (3 page(s), 9/9/1980)
- ML20199A553 - Rev 2 to Procedure CP-CPM-6.9G, "Documentation for ASME Welding,Fabrication & Installation Activities." Related documentation encl. (142 page(s), 1/19/1981)
- ML20199A503 - Rev 0 to Procedure CP-EI-4.0-50, "Control of Refabrication & Installation of Diesel Generator Auxiliary Skid Base & Associated Structures - Unit 2." Supporting documentation encl. (109 page(s), 2/6/1984)
- ML20199A546 - Forwards Bechtel rept, "Qualification of Alternative Electrode Control Program for Palo Verde Nuclear Generating Station Units 1,2 & 3," for review.Moisture concerns unjustified.Max out-of-oven time conservative. (3 page(s), 4/4/1978)
- ML20199A613 - Rev 4 to Procedure QI-QAP-11.1-39, "Mechanical Equipment Installation Insp." (14 page(s), 6/11/1984)
- ML20199A510 - Rev 1 to Procedure CP-EI-4.0-30, "Review of Pipe Support Required Prior to Sys Operation." (54 page(s), 12/6/1982)
- ML20199A694 - Rev 0 to Procedure CP-EI-4.0-30, "Review of Pipe Support Required Prior to Sys Operation." (32 page(s), 6/4/1982)
- ML20199A650 - Rev 0 to Process Spec PSPAS-01, "Assembly,Fitting & Welding Sequence for Primary Loop Piping." (82 page(s), 5/26/1977)
- ML20199A581 - Rev 0 to Instruction QI-QAP-16.1-2, "Documenting Min Wall Violations & Arc Strike Repairs on NDE Rept Form." (5 page(s), 1/3/1980)
- ML20199A497 - "Addendum One to Piping Analysis Calculations,Texas Util Svcs,Inc,Units 1 & 2,Part 2,Analysis of Welded Channel Box Section." Related documents encl. (28 page(s), 12/7/1981)
- ML20199A559 - Voided Rev 4 to Procedure QI-QAP-16.1-2, "Documenting Base Metal Repairs,Min Wall Violations & Arc Strike Repairs." (5 page(s), 5/20/1982)
- ML20199A645 - Rev 0 to Const Field Procedure 35-1195-MEI-1, "Special Engineering Instruction for Handling of Specific Safety- Related Equipment." Related documentation encl. (19 page(s), 6/7/1976)
- ML20199A517 - Partially withheld transcript of 841127 allegation interview in Bethesda,MD.Pp 70-84.Supporting documentation encl. (63 page(s), 11/27/1984)
- ML20199A618 - Rev 5 to Procedure CP-QAP-11.1, "Fabrication & Installation Insp of Components,Component Supports & Piping." Related documentation encl. (29 page(s), 6/11/1984)
- ML20199A670 - Rev 6 to Procedure CP-QAP-6.1, "Preparation of QA Procedures & Instructions." (300 page(s), 6/25/1984)
- ML20199A682 - Rev 5 to Piping Spec 2323-MS-43A, "Shop Fabrication of Piping 2 1/2-Inch Nominal Diameter & Larger & Piping Matl Supply Requirements." (10 page(s), 7/3/1984)
- ML20199A678 - Marked-up Reg Guide 1.44, "Control of Use of Sensitized Stainless Steel." (4 page(s), 5/31/1973)
- ML20199A599 - Rev 1 to Procedure CP-QAP-14.1, "Insp of Storage & Maint of Mechanical Equipment." (8 page(s), 2/2/1983)
- ML20199A570 - Rev 2 to Procedure QI-QAP-16.1-2, "Documenting Base Metal Repairs to Piping,Min Wall Violations & Arc Strike Repairs." (5 page(s), 6/26/1981)
- ML20199A536 - Rev 1 to Procedure WCP-6, "Electronic Alignment,Performance Verification & Maint of Dimetrics Gold Track II Automatic Welding Sys." (31 page(s), 3/11/1982)
- ML20199A709 - Rev 1 to Procedure CP-CPM 14.1, "Guidelines for Protection of Permanent Plant Equipment." (3 page(s), 5/28/1982)
- ML20199A688 - Partially withheld transcript of Technical Review Team 840919 interview w/unidentified person in Eagle Mountain,TX re welding activities. (68 page(s), 9/19/1984)
- ML20199A525 - Requests response to personal observation re indicating of weld repair on Supports CTH 8057,CTH 8058 & CTH 8073 in Unit 2.Response requested within 30 days. (2 page(s), 4/30/1984)
- ML20199A624 - Rev 4 to Procedure MCP-1. (12 page(s), 8/1/1984)
- ML20199A667 - Rev 3 to Procedure CP-EP-4.0, "Design Control." (23 page(s), 6/11/1982)
- ML20199A564 - Rev 3 to Procedure QI-QAP-16.1-2, "Documenting Base Metal Repairs,Min Wall Violations & Arc Strike Repairs." (5 page(s), 1/13/1982)
- ML20199A531 - Rev 0 to Const Procedure 35-1195-WCP-6, "Electronic Alignment,Performance Verification & Maint of Dimetrics Gold Track II Automatic Welding Sys." (40 page(s), 11/23/1977)
- ML20199A661 - Rev 3 to Procedure QI-QAP-11.1-31, "Installation Insp of Mechanical Joints." (9 page(s), 1/25/1982)
- ML17192A345 - Reg Guide 1.10,Rev 1, "Mechanical (Cadweld) Splices in Reinforcing Bars of Category 1 Concrete Structures." Related documents encl. (49 page(s), 1/2/1973)
- ML20199A543 - Partially withheld testimony of WJ Collins re welding fabrication concerns. (48 page(s), 6/10/1985)
- ML20199A715 - Rev 0 to Procedure CP-CPM 14.1, "Guidelines for Protection of Permanent Plant Equipment." (200 page(s), 3/20/1981)
- ML20199A639 - Rev 8 to Procedure MCP 10, "Storage & Storage Maint of Mechanical & Electrical Equipment." (18 page(s), 2/1/1985)
- ML20199A705 - Rev 2 to Procedure CP-CPM 14.1, "Guidelines for Protection of Permanent Plant Equipment." (4 page(s), 3/5/1984)
- ML20199A605 - Rev 0 to Procedure CP-QAP-14.1, "Insp of Storage & Maint of Mechanical Equipment." (9 page(s), 1/12/1982)
- ML20199A586 - Rev 7 to table of contents for Procedure CP-QAP-0.0, "ASME QA Procedures Manual." (5 page(s), 8/28/1980)
- ML20199A633 - Rev 2 to Procedure CP-CPM 8.1, "Receipt,Storage & Issuance of Items." (12 page(s), 9/25/1984)
- ML20199A484 - Rev 1 to Procedure 100-W-1A, "Procedure Spec for SMAW of Mild Carbon Steel." Draft 6 of SSER & Section 3 of Tech Specs re diesel generator sets encl. (55 page(s), 4/1/1976)
- ML20199A490 - Rev 3 to 2323-GS-901, "General Welding Requirements for Shop Fabrication Equipment." (6 page(s), 2/12/1975)
- ML20199A657 - Rev 2 to Procedure QI-QAP-11.1-31, "Installation Insp of Mechanical Joints." (7 page(s), 1/12/1982)
- ML20199A592 - Rev 1 to Procedure CP-CPM 6.9C, "Matl Identification." Related documentation encl. (77 page(s), 7/21/1980)
- ML20199A628 - Rev 11 to Procedure CP-CPM 6.3, "Preparation,Approval & Control of Operation Travelers." (9 page(s), 8/8/1984)